HomeMy WebLinkAboutItem No. 20-Construction Contract to Micon Construction for 20 Consent Calendar City of San Bernardino Request for Council Action Date: February 5, 2020 To: Honorable Mayor and City Council Members From: Teri Ledoux, City Manager By: Kris Jensen, Director of Public Works Subject: Award of Construction Contract to Micon Construction for Playground Equipment Replacement Phase 2 Recommendation It is recommended that the Mayor and City Council of the City of San Bernardino, California, provide direction to staff regarding the Playground Equipment Replacement -32: 1. Approving the award of a Construction Contract with Micon Construction, Inc., in the amount of $1,063,037 ; and 2. Authorizing the Director of Finance to increase the total project budget amount to $1,200,000, including the cost of the Construction Contract in the amount of $1,063,037, project contingency in the amount of $100,963, and engineering and inspection budgets in the amount of $36,000; and 3. Authorizing the Director of Finance to amend the FY 2019/20 adopted budget to allocate $200,000 in Community Development Block Grant Funds, ($65,300) from Lytle Creek Community Center Roof Replacement and ($134,700) from Jerry Lewis Swim Center Facility Improvements to the Project; and 4. Authorizing the City Manager or designee to expend the contingency fund, if necessary, to complete the project. Background The Public Works Department is responsible for maintaining all City parks. A playground assessment was completed in FY 2017/18 and a priority list was compiled after determining age, condition, and any safety issues of the existing structures. The estimated cost of the playground equipment replacement at each location was determined by the area the replacement structures will occupy and the size of the structure to be installed at each location. A five (5) year plan was developed to replace playground equipment in all the parks within the City of San Bernardino. Phase 1 of the five year plan consisted of replacing playground equipment at six (6) parks and has been completed. Phase 2 consists of replacing the equipment at the following five (5) park sites: Packet Pg. 805 Page 1 20.a Resolution No. 2020-32 RESOLUTION NO. 2020-32 RESOLUTION OF THE MAYOR AND CITY COUNCIL OF THE CITY OF SAN BERNARDINO, CALIFORNIA, APPROVING THE AWARD OF A CONSTRUCTION CONTRACT WITH MICON CONSTRUCTION INC., IN THE AMOUNT OF $1,063,037; AUTHORIZING THE DIRECTOR OF FINANCE TO INCREASE THE TOTAL PROJECT BUDGET AMOUNT TO $1,200,000, INCLUDING THE COST OF THE CONSTRUCTION CONTRACT IN THE AMOUNF OF $1,063,037, PROJECT CONTINGENCY IN THE AMOUNT OF $100,963 AND ENGINEERING AND INSPECTION BUDGETS IN THE AMOUNT OF $36,000; AUTHORIZING THE DIRECTOR OF FINANCE TO AMEND THE FY 2019/20 ADOPTED BUDGET TO ALLOCATE $200,000 IN COMMUNITY DEVELOPMENT BLOCK GRANT FUNDS, ($65,300) FROM LYTLE CREEK COMMUNITY CENTER ROOF REPLACEMENT AND ($134,700) FROM JERRY LEWIS SWIM CENTER FACILITY IMPROVEMENTS TO THE PROJECT; AND AUTHORIZE THE CITY MANAGER OR DESIGNEE TO EXPEND THE CONTINGENCY FUND, IF NECESSARY, TO COMPLETE THE PROJECT WHEREAS, the City of San Bernardino owns, operates and is responsible for the maintenance of a number of municipal park facilities, including Meadowbrook Fields-Park, Lytle Creek Park, Wildwood Park, Harrison Canyon Park, and Speicher Park; and WHEREAS, a playground Assessment was completed on FY 2017/18 and a priority list was established. A 5 year plan was developed to replace playground Equipment in all parks within the City of San Bernardino. Phase 1 of 5 phases consists of replacing the playground equipment at six (6) parks was completed. Phase 2 consist of replacing the playground equipment at five (5) parks including Meadowbrook Fields-Park, Lytle Creek Park, Wildwood Park, Harrison Canyon Park, and Speicher Park to preserve the City-owned asset; and WHEREAS, Community Development Block Grant funding to perform the playground equipment phase 2 to include five (5) parks was approved on May 15, 2019, by the Mayor and City Council in the amount of $1,000,000; and WHEREAS, staff has administered a competitive bid process to secure a construction contract to perform the playground equipment replacement project; and WHEREAS, the City received five (5) bids on December 18, 2019, Ortco, Inc. of Orange California was announced as the lowest bidder. Ortco, Inc. has submitted a request to withdraw the bid due to mathematical error, which allowed under Public Bid Law. Micon Construction, Inc., 1616 Sierra Madre Circle, Placentia, California, 92870 has been determined to be the lowest responsive, responsible bidder; and Attachment: PW.Micon Construction Inc. Contract Award Playground Equipment Replacement Ph 2.01-Attachment 1-Resolution \[Revision 2\] Packet Pg. 810 20.b Attachment: PW.Micon Construction Contract Award Playground Equipment Replacement .0.._ (6569 : Award of Construction Contract to Packet Pg. 814 20.c Attachment: PW.Micon Construction Contract Award Playground Equipment Replacement.03-Attachment3 .Lowest Bid Form (6569 : Award of Packet Pg. 820 20.d A G R E E M E N T CITY OF SAN BERNARDINO THIS AGREEMENT is made and concluded this _____ day of _______________, 20___, between the City of San Bernardino (owner and hereinafter "CITY"), and Micon Construction Inc. ________________________________________________ (hereinafter "CONTRACTOR"). 1. For and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the CITY, and under the conditions expressed in the bond as deposited with the CITY, receipt of which is hereby acknowledged, the CONTRACTOR agrees with the CITY, at the CONTRACTOR's own proper cost and expense in the Special Provisions to be furnished by the CITY, to furnish all materials, tools and equipment and perform all the work necessary to complete in good workmanlike and substantial manner the PLAYGROUND EQUIPMENT REPLACEMENT PHASE 2 (PR 19-005) in strict conformity with Plans and Special Provisions No. 13347 , and also in accordance with Standard Specifications for Public Works/Construction on file in the Office of the City Engineer, Public Works Department, City of San Bernardino, which said Plans and Special Provisions and Standard Specifications are hereby especially referred to and by such reference made a part hereof. 2. The CONTRACTOR agrees to receive and accept the prices as set forth in the Bid Schedule as full compensation for furnishing all materials and doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work, and for well and faithfully completing the work and the whole thereof, in the manner and according to the Plans and Special Provisions, and requirements of the Engineer under them. 3. The CONTRACTOR herein covenants by and for himself or herself, his or her heirs, executors, administrators, and assigns, and all persons claiming under or through them, that there shall be no discrimination against or segregation of, any person or group of persons on the basis of race, color, national origin, religion, sex, marital status, or ancestry in the performance of this contract, nor shall the CONTRACTOR or any person claiming under or through him or her, establish or permit any such practice or practices of discrimination or segregation with reference to the selection of subcontractors, vendees, or employees in the performance of this contract. Failure by the CONTRACTOR to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy, as recipient deems appropriate. Attachment: PW.Micon Construction Inc Contarct Award Playground Equipment Replacement.04-Agreement-Attachment 4 (6569 : Award of A-1 Packet Pg. 881 20.e ATTACHMENT 5 LOCATION MAP Meadowbrook Fields- Park Attachment: PW.Micon Construction Contract Award Playground Equipment Replacement.005.Location Map.Attachment 5 (6569 : Award of Packet Pg. 883 20.f Attachment: PW.Micon Construction Contract Award Playground Equipment Withdrawal Letter (6569 : Award of Construction Contract to Packet Pg. 888