RESOLUTION NO. 2017-257
RESOLUTION OF THE MAYOR AND CITY COUNCIL OF THE CITY OF SAN
BERNARDINO, CALIFORNIA, APPROVING CONDITIONAL USE PERMIT 17-26
(REVISED CONDITIONAL USE PERMIT 11-13) AND REVISED SUBDIVISION 11-
03 (REVISED TENTATIVE TRACT MAP 18829) FOR THE DEVELOPMENT,
ESTABLISHMENT AND OPERATION OF THE ARROWHEAD GROVE PROJECT
(FORMERLY KNOWN AS THE WATERMAN GARDENS PROJECT) ON A SITE
COMPRISED OF FOUR (4) PARCELS CONTAINING A TOTAL OF
APPROXIMATELY 39.36 ACRES LOCATED AT THE SOUTHEAST CORNER OF
WATERMAN AVENUE AND BASELINE STREET WITHIN THE BOUNDARIES OF
THE WATERMAN + BASELINE NEIGHBORHOOD TRANSFORMATION
SPECIFIC PLAN
WHEREAS, on February 18, 2014, the Mayor and Common Council adopted
Resolution 20114-39 thereby certifying the Final Environmental Impact Report and
Mitigation Monitoring and Reporting Program and approving Conditional Use Permit 11-13
and Subdivision 11-03 (Tentative Tract Map 18829); and
WHEREAS, on December 19, 2016, the Mayor and City Council adopted Resolution
2016-256 thereby certifying the Final Environmental Impact Report and Mitigation
Monitoring and Reporting Program and introduced Ordinance 1437 for the approval of the
Waterman + Baseline Neighborhood Transformation Specific Plan; and
WHEREAS, on October 19, 2017, pursuant to the requirements of Chapter 19.36
(Conditional Use Permits) and Chapter 19.66 (Subdivision Maps) of the City of San
Bernardino Development Code, an application for Conditional Use Permit 17-26 (Revised
Conditional Use Permit 11-13) and Revised Subdivision 11-03 (Revised Tentative Tract Map
18829) was duly submitted by:
Owner/Applicant: Housing Authority of the County of San Bernardino
715 E. Brier drive
San Bernardino, CA 92408
APN: 0147-211-01, 02, 03 and 04
Zone: Waterman + Baseline Neighborhood Transformation Specific
Plan
WHEREAS, Conditional Use Permit 17-26 (Revised Conditional Use Permit 11-13)
and Revised Subdivision 11-03 (Revised Tentative Tract Map 18829) is a request to allow the
development, establishment and operation of the Arrowhead Grove Project (formerly known
as the Waterman Gardens Project) to be comprised of 411 residential units, approximately
194,200 square feet of commercial/mixed uses, two (2) private community centers, one (1)
public community center, and two (2) detention basins, along with the construction of the
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
required on-site and off-site improvements, on a site comprised of four (4) parcels containing
a total of approximately 39.36 acres; and
WHEREAS, the Planning Division of the Community Development Department of
the City of San Bernardino has reviewed Conditional Use Permit 17-26 (Revised Conditional
Use Permit 11-13) and Revised Subdivision 11-03 (Revised Tentative Tract Map 18829) for
consistency with the City of San Bernardino General Plan and the Waterman + Baseline
Neighborhood Transformation Specific Plan, and compliance with the City of San Bernardino
Development Code; and
WHEREAS, on November 3, 2017, pursuant to the requirements §19.52.020 of the
City of San Bernardino Development Code, the City gave public notice by advertising in the
San Bernardino Sun, a newspaper of general circulation within the City of San Bernardino of
the holding of a public hearing at which Conditional Use Permit 17-26 (Revised Conditional
Use Permit 11-13) and Revised Subdivision 11-03 (Revised Tentative Tract Map 18829)
would be considered by the Planning Commission; and
WHEREAS, on November 14, 2017, pursuant to the requirements of §19.52.040 of
the City of San Bernardino Development Code, the Planning Commission held the duly
noticed public hearing at which interested persons had an opportunity to testify in support of,
or opposition to Conditional Use Permit 17-26 (Revised Conditional Use Permit 11-13) and
Revised Subdivision 11-03 (Revised Tentative Tract Map 18829), and at which meeting the
Planning Commission considered Conditional Use Permit 17-26 (Revised Conditional Use
Permit 11-13) and Revised Subdivision 11-03 (Revised Tentative Tract Map 18829); and
WHEREAS, after closing said public hearing, the Planning Commission adopted
Resolution No. 2017-065 recommending to the Mayor and City Council approval of
Conditional Use Permit 17-26 (Revised Conditional Use Permit 11-13) and Revised
Subdivision 11-03 (Revised Tentative Tract Map 18829); and
WHEREAS, notice of the December 20, 2017 public hearing for the Mayor and City
Council's consideration of the proposed Resolution was published in The Sun newspaper on
December 8, 2017, and was mailed to property owners within a 500 foot radius of the project
site in accordance with Development Code Chapter 19.52.
WHEREAS, pursuant to the requirements of Chapter 19.52 (Hearings and Appeals),
Chapter 19.36 (Conditional Use Permits) and Chapter 19.66 (Subdivision Maps) of the City of
San Bernardino Development Code, the Mayor and City Council has the authority to take
action on Conditional Use Permit 17-26 (Revised Conditional Use Permit 11-13) and Revised
Subdivision 11-03 (Revised Tentative Tract Map 18829).
2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY
COUNCIL OF THE CITY OF SAN BERNARDINO, CALIFORNIA AS FOLLOWS:
SECTION 1. The Mayor and City Council find that the above -stated Recitals are true
and hereby adopt and incorporate them herein.
SECTION 2. Findings of Fact — Revised Subdivision 11-03 (Revised Tentative Tract
Map 18829].
Finding No. 1:
The proposed map is consistent with the General Plan.
Finding of Fact: General Plan Land Use Element Policy 2.3.2 states: "Promote
development that is compact, pedestrian friendly, and served by a
variety of transportation options along major corridors and in key
activity areas. "
Finding No. 2
Finding of Fact:
General Plan Land Use Element Policy 2.4.3 states: "Where necessary
to stimulate the desired mix and intensity of development, land use
flexibility and customized site development standards shall be achieved
through various master planning devices such as specific plans,
planned development zoning, and creative site planning. "
On December 19, 2016, the Mayor and City Council adopted
Resolution No. 2016-256 approving the Waterman + Baseline
Neighborhood Transformation Specific Plan to guide future
development within the Specific Plan area boundaries. The land use
policies and development standards of the Specific Plan will be
implemented by the development, establishment and operation of
Arrowhead Grove that is comprised of 411 residential units,
approximately 194,200 square feet of commercial/mixed uses, two (2)
private community centers, one (1) public community center, and two
(2) detention basins. Therefore, Revised Subdivision 11-03 (Revised
Tentative Tract Map 18829) is consistent with the General Plan.
The design and improvements of the proposed subdivision is consistent
with the General Plan.
General Plan Community Design Element Policy 5.3.2 states: "Distinct
neighborhood identities should be achieved by applying streetscape and
landscape design, entry treatments, and architectural detailing
standards, which are tailored to each particular area and also
incorporate citywide design features. "
3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
General Plan Community Design Element Policy 5.3.3 states: "A well -
integrated network of bike and pedestrian paths should connect
residential areas to schools, parks, and shopping centers. "
General Plan Community Design Element Policy 5.5.6 states: "Ensure
a variety of architectural styles, massing, floor plans, fagade treatment,
and elevations to create visual interest. "
On December 19, 2016, the Mayor and City Council adopted
Resolution No. 2016-256 approving the Waterman + Baseline
Neighborhood Transformation Specific Plan to guide future
development within the Specific Plan area boundaries. The land use
policies and development standards of the Specific Plan will be
implemented by the proposed development, establishment and
operation of Arrowhead Grove that is project to be comprised of 411
residential units, approximately 194,200 square feet of commercial/
mixed uses, two (2) private community centers, one (1) public
community center, and two (2) detention basins that will feature (3)
architectural styles: California Craftsman, Spanish Mediterranean, and
Contemporary, along recreational amenities that will be connected by
pedestrian paths, creating a well -integrated mixed use neighborhood,
and establishing design criteria that are consistent with the General
Plan. Therefore, the design and improvements of Revised Subdivision
11-03 (Revised Tentative Tract Map 18829) is consistent with the
General Plan.
Finding No. 3 The site is physically suitable for the type of development.
Finding of Fact: The site is relatively level and served or in close proximity to all
necessary utilities. The land use policies and development standards
contained within the Waterman + Baseline Neighborhood
Transformation Specific Plan area allow for physically suitable types of
development within the existing residential neighborhoods within the
vicinity. The development, establishment and operation of Arrowhead
Grove that is comprised of 411 residential units, approximately 194,200
square feet of commercial/mixed uses, two (2) private community
centers, one (1) public community center, and two (2) detention basins
is permitted subject to the approval of Revised Subdivision 11-03
(Revised Tentative Tract Map 18829) and Conditional Use Permit 17-
26 (Revised Conditional Use Permit 11-13) with the appropriate
In
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Conditions of Approval and CEQA determination. Therefore, site is
physically suitable for the development.
Finding No. 4 The site is physically suitable for the proposed density of development.
Finding of Fact: The proposed development, establishment and operation of Arrowhead
Grove that is comprised of 411 residential units, approximately 194,200
square feet of commercial/mixed uses, two (2) private community
centers, one (1) public community center, and two (2) detention basins
is consistent with the Waterman + Baseline Neighborhood
Transformation Specific Plan. Therefore, the site is physically suitable
for the proposed density of development under Revised Subdivision 11-
03 (Revised Tentative Tract Map 18829) and Conditional Use Permit
17-26 (Revised Conditional Use Permit 11-13).
Finding No. 5: The design of the subdivision and the proposed improvements will not
cause substantial environmental damage or substantially or avoidably
injure fish or wildlife or their habitat.
Finding of Fact: On December 19, 2016, the Mayor and City Council adopted
Resolution No. 2016-256 certifying the Final Environmental Impact
Report (California State Clearinghouse Schedule No. 2015081086)
which includes a Mitigation Monitoring and Reporting Program for the
Waterman + Baseline Neighborhood Transformation Specific Pian
(Specific Plan 15-01), which included the Waterman Gardens
(Arrowhead Grove) site and its future development. Therefore, the
proposed improvements of 411 residential units, approximately 194,200
square feet of commercial/mixed uses, two (2) private community
centers, one (1) public community center, and two (2) detention basins
will not cause substantial environmental damage or substantially or
avoidably injure fish or wildlife or their habitat.
Finding No. 6: The design of the subdivision or type of improvements will not cause
serious public health problems.
Finding of Fact: The certified Final Environmental Impact Report (California State
Clearinghouse Schedule No. 2015081086) prepared for the Waterman +
Baseline Neighborhood Transformation Specific Plan found that any
environmental impacts caused by the project could be mitigated to
become less than significant. Therefore, Revised Subdivision 11-03
(Revised Tentative Tract Map 18829) will not cause serious public
health problems.
5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Finding No. 7 The design of the subdivision or the type of improvements will not
conflict with easements, acquired by the public at large, for access
through or use of, property within the proposed subdivision.
Finding of Fact: The Waterman + Baseline Neighborhood Transformation Specific Plan
was designed with consideration for existing easements, and access to
and through the property. Therefore, design of Revised Subdivision 11-
03 (Revised Tentative Tract Map 18829) will not conflict with
easements, acquired by the public at large, for access through or use of,
property within the proposed subdivision.
SECTION 3. Findings of Fact — Conditional Use Permit 17-26 Revised Conditional
Use Permit 11-13).
I Finding No. 1:
The proposed use is conditionally permitted within, and would not impair
the integrity and character of the subject land use district and complies
with all of the applicable provisions of the Development Code.
Finding of Fact: On December 19, 2016, the Mayor and City Council adopted Resolution
No. 2016-256 approving the Waterman + Baseline Neighborhood
Transformation Specific Plan to guide future development within the
Specific Plan area boundaries. The land use policies and development
standards of the Specific Plan will be implemented by the development,
establishment and operation of the Arrowhead Grove that is comprised of
411 residential units, approximately 194,200 square feet of commercial/
mixed uses, two (2) private community centers, one (1) public community
center, and two (2) detention basins that are permitted subject to the
approval of Conditional Use Permit 17-26 (Revised Conditional Use
Permit 11-13) with the appropriate Conditions of Approval and CEQA
determination. The Arrowhead Grove project is consistent with the
Waterman + Baseline Neighborhood Transformation Specific Plan.
Therefore, the Arrowhead Grove project would not impair the integrity
and character of the subject land use district or be detrimental to
surrounding properties.
Finding No. 2: The proposed use is consistent with the General Plan.
Finding of Fact: General Plan Housing Policy 3.2.1 states: "Protect the quality of the
existing housing stock through the rehabilitation and improvement of
market rate neighborhoods and affordable housing projects. "
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
171
18
19
20
21
22
23
24
25
26
27
28
General Plan Housing Policy 3.5.4 states: "Encourage and facilitate the
construction, maintenance, and preservation of a variety of housing types
adequate to meet a range of household needs. "
General Plan Housing Policy 3.6.1 states: "Promote infill rehabilitation
and new construction projects through increasing housing potential in
already developed areas of the community. "
On December 19, 2016, the Mayor and City Council adopted Resolution
No. 2016-256 approving the Waterman + Baseline Neighborhood
Transformation Specific Plan to guide future development within the
Specific Plan area boundaries. The land use policies and development
standards of the Specific Plan will be implemented by the development,
establishment and operation of Arrowhead Grove that is comprised of 411
residential units, approximately 194,200 square feet of commercial/mixed
uses, two (2) private community centers, one (1) public community
center, and two (2) detention basins which satisfies the housing goals of
the Specific Plan. Therefore, Conditional Use Permit 17-26 (Revised
Conditional Use Permit 11-13) is consistent with the General Plan.
Finding No. 3: Approval of the Conditional Use Permit for the proposed use is in
compliance with the requirements of the California Environmental
Quality Act (CEQA) and § 19.20.03 0(6) of the Development Code.
Finding of Fact: On December 19, 2016, the Mayor and City Council adopted Resolution
No. 2016-256 certifying the Final Environmental Impact Report
(California State Clearinghouse Schedule No. 2015081086) which
includes a Mitigation Monitoring and Reporting Program for the
Waterman + Baseline Neighborhood Transformation Specific Plan
(Specific Plan 15-01), which included the Waterman Gardens
(Arrowhead Grove) site and its future development. Therefore, the
development, establishment and operation of Arrowhead Grove that is
comprised of 411 residential units, approximately 194,200 square feet of
commercial/mixed uses, two (2) private community centers, one (1)
public community center, and two (2) detention basins is in compliance
with the requirements of the California Environmental Quality Act and
§ 19.20.03 0(6) of the Development Code.
Finding No. 4: There will be no potentially significant negative impacts upon
environmental quality and natural resources that could not be properly
mitigated and monitored.
7
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
221
23
24
25
26
27
28
Finding of Fact: On December 19, 2016, the Mayor and City Council adopted Resolution
No. 2016-256 certifying the Final Environmental Impact Report
(California State Clearinghouse Schedule No. 2015081086) which
includes a Mitigation Monitoring and Reporting Program for the
Waterman + Baseline Neighborhood Transformation Specific Plan
(Specific Plan 15-01), which included the Waterman Gardens
(Arrowhead Grove) site and its future development. Therefore, there will
be no potentially significant negative impacts upon environmental quality
and natural resources that could not be properly mitigated and monitored.
Finding No. 5:
Finding of Fact:
Finding No. 6:
The location, size, design, and operating characteristics of the proposed
use are compatible with the existing and future land uses within the
general area in which the proposed use is to be located and will not create
significant noise, traffic or other conditions or situations that may be
objectionable or detrimental to other permitted uses in the vicinity or
adverse to the public interest, health, safety, convenience, or welfare of
the City.
The development, establishment and operation of the Arrowhead Grove
that is comprised of 411 residential units, approximately 194,200 square
feet of commercial/mixed uses, two (2) private community centers, one
(1) public community center, and two (2) detention basins is permitted
subject to the approval of Conditional Use Permit 17-26 (Revised
Conditional Use Permit 11-13) with the appropriate Conditions of
Approval and CEQA determination. Additionally, the proposed
Arrowhead Grove project is consistent with the Waterman + Baseline
Neighborhood Transformation Specific Plan. Further, on December 19,
2016, the Mayor and City Council adopted Resolution No. 2016-256
certifying the Final Environmental Impact Report (California State
Clearinghouse Schedule No. 2015081086) which includes a Mitigation
Monitoring and Reporting Program for the Waterman + Baseline
Neighborhood Transformation Specific Plan (Specific Plan 15-01), which
included the Arrowhead Grove site and its future development. Therefore,
the design of Arrowhead Grove will ensure that the project will not create
any significant noise, traffic, or other conditions that would be detrimental
or objectionable to other uses in the vicinity or adverse to the public
health, safety, convenience, or welfare of the City.
The subject site is physically suitable for the type and density/intensity of
use being proposed.
n
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Finding of Fact: The site is physically suitable for the type and density/intensity of the
development, establishment and operation of Arrowhead Grove that is
comprised of 411 residential units, approximately 194,200 square feet of
commercial/mixed uses, two (2) private community centers, one (1)
public community center, and two (2) detention basins as evidenced by
project compliance with applicable Development Code standards and the
land use policies and development standards of the Waterman + Baseline
Neighborhood Transformation Specific Plan. The size of the project site is
adequate to accommodate the proposed improvements, in compliance
with the requirements of the Development Code.
Finding No. 7: There are adequate provisions for public access, water, sanitation, and
public utilities and services to ensure that the proposed use would not be
detrimental to public health and safety.
[ Finding of Fact:
The site has direct access off of Waterman Avenue and Baseline Street.
All agencies responsible for reviewing access and providing water,
sanitation and other public services to the site have had the opportunity to
review the proposal, and none indicated inability to serve the project site.
Therefore, the development, establishment and operation of Arrowhead
Grove that is comprised of 411 residential units, approximately 194,200
square feet of commercial/mixed uses, two (2) private community centers,
one (1) public community center, and two (2) detention basins, subject to
the approval of Conditional Use Permit 17-26 (Revised Conditional Use
Permit 11-13) and Revised Subdivision 11-03 (Revised Tentative Tract
Map 18829) with the appropriate Conditions of Approval and CEQA
determination, will not be detrimental to public services or public health
and safety.
SECTION 4. Compliance with the California Environmental Quality Act. — On
December 19, 2016, the Mayor and City Council adopted Resolution No. 2016-256 certifying
the Final Environmental Impact Report (California State Clearinghouse No. 2015081086) the
Waterman + Baseline Neighborhood Transformation Specific Plan (Specific Plan 15-01),
which included the Waterman Gardens site. No further changes to the environmental
conditions or the subject site have occurred. Therefore, pursuant to §15162(a) (Previous
Environmental Determination) of the California Environmental Quality Act, no further
environmental review is necessary.
SECTION 5. — Conditions of Approval: Conditional Use Permit 17-26 (Revised
Conditional Use Permit 11-13) and Revised Subdivision 11-03 (Revised Tentative Tract Map
18829), is hereby approved subject to the following Conditions of Approval:
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
1. This approval is to subdivide approximately 39.36 acres into eight (8) parcels in
order to create a mixed income, mixed used community. The residential
community will construct up to 411 multi -family residential units with on-site
recreation amenities, including two (2) 2,500 square foot community centers,
swimming pools, outdoor recreational spaces with walking paths and barbeque
picnic areas, and several tot lot playgrounds. Approximately 11.1 acres will be
future mixed -used, commercial, retail and/or professional office uses. The
proposed project would be constructed in eight (8) phases and is located at the
northeast corner of Waterman Avenue and Olive Street, in the Mixed Use
Village zone of Waterman + Baseline Neighborhood Transformation Specific
Plan. All development must be in substantial conformance with the Site Plans,
Landscape Plan, Floor Plans, and Building Elevations, all date stamped December
20, 2017 (EXHIBIT "A"). All conditions must be complied with prior to
submitting for Certificate of Occupancy, unless otherwise stated.
2. The project shall be subject to all of the mitigation measures contained within the
Mitigation Monitoring and Reporting Program date stamped December 20, 2017
(EXHIBIT `B"), and incorporated herein by reference as Conditions of
Approval.
3. Tentative Tract Map: Within two (2) years of the original approval date, the
filing of the initial phase of the final map with the Mayor and City Council shall
have occurred or the approval shall become null and void. Expiration of a
tentative map shall terminate all proceedings and no final map shall be filed
without first processing a new tentative map. The City Engineer must accept the
final map or tentative map documents as adequate for approval by Council prior
to forwarding them to the City Clerk. The date the final map shall be deemed
filed with the Council is the date on which the City Clerk receives the map. As
provided for in San Bernardino Development Code Section 19.66.140,
EXTENSION OF TIME, any applicable time limits for acting on the tentative
map application may be extended by mutual written consent of the subdivider
and the City, as outlined in Map Act Section 66451.1.
EXPIRATION DATE: DECEMBER 20, 2019
4. Conditional Use Permit: Within two (2) years of this approval, the applicant shall
apply for the necessary building permits and commencement of
work/construction must have occurred on Phase 1 of the project or the
permit/approval shall become null and void. The applicant shall obtain Building
Permits for each phase of development as indicated in the project's Phasing
Exhibit (final Phasing Plan to be submitted at of plan check with Phase I and
with technical improvement plans by the Applicant to the City) prior to
commencement to the specified construction activities included in the Conditions
of Approval; otherwise the permit/approval will become null and void.
Commencement of construction shall include demolition of existing structures
and/or public improvements. Approval of the Conditional Use Permit does not
authorize commencement of construction. All necessary permits must be
obtained prior to commencement of specified construction activities included in
the Conditions of Approval.
10
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
EXPIRATION DATE: DECEMBER 20, 2019
5. In the event this approval is legally challenged by a third party, the City will
promptly notify the applicant of any claim or action or proceeding and will
cooperate fully in the defense of this matter. Once notified, the applicant agrees
to defend, indemnify, and hold harmless the City of San Bernardino ("City"),
any departments, agencies, divisions, boards or commissions of the City, as well
as any predecessors, successors, assigns, agents, directors, elected officials,
officers, employees, representatives and attorneys of the City from any claim,
action or proceeding against any of the foregoing persons or entities. The
applicant further agrees to reimburse the City for any costs and attorneys' fees
that the City may be required by a court to pay as a result of such action, but
such participation shall not relieve applicant of his or her obligation under this
condition.
The costs, salaries, and expenses of the City Attorney and employees of his
office shall be considered as "attorneys' fees" for the purpose of this condition.
As part of the consideration for issuing this permit, this condition shall remain in
effect if this Development Permit is rescinded or revoked, whether or not at the
request of applicant.
Conditions Applicable to Each Phase
6. Prior to installing any signs, the applicant must submit a Sign Permit application
to the Planning Division for review and approval.
7. All perimeter block walls shall be constructed with the decorative finish on both
sides (split face, slump stone, etc.).
8. All construction sites shall be secured with temporary chain-link fencing, 6 feet
in height.
9. Garage doors for all homes shall be set into the walls rather than flush with the
exterior walls. A variety of compatible designs shall be used throughout the
proj ect.
10. No homes shall be occupied until all conditions of approval for each phase have
been completed for final sign -off of all permits.
11. All windows, doors, and vents shall be architecturally treated.
12. The project shall be subject to all applicable Mitigation Measures contained in
the Mitigation Monitoring/Reporting Program contained in Attachment D.
13. Prior to the issuance of Building Permits, the applicant must demonstrate on the
construction drawings for the project that all exterior light fixtures will be energy
efficient.
11
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
14. The property owner(s), successors and assigns will be responsible for regular
maintenance the site. Vandalism, graffiti, trash and other debris must be
removed within 24 hours of first being reported.
15. All necessary drainage and flood control measures shall be subject to
requirements of the Land Development Division. The developer's Engineer shall
furnish all necessary data relating to drainage and flood control prior to grading
permit issuance.
16. The development is located within Zone X on the Federal Insurance Rate Map
Number 06071 C8682H with Map Revise date of August 28, 2008. Therefore, the
applicant must raise all building pads above the surrounding area. If required or
requested the City shall assist with the processing and approval of a LOMR
application. Applicant shall be responsible for preparation of all documents,
reports and studies necessary to complete the filing of this application by the
City. Further, any application fee required for the filing of the CLOMR/LOMR
shall be paid by the applicant.
17. All drainage from the development shall be directed to an approved public
drainage facility. If not feasible, proper drainage facilities and easements shall be
provided to the satisfaction of the City Engineer.
18. If site drainage is to be outletted into the public street, the drainage shall be
conveyed through a parkway culvert constructed in accordance with City
Standard No. 400. Conveyance of site drainage over the Driveway approaches
will not be permitted.
19. A Storm Water Pollution Prevention Plan (SWPPP) will be required. The
applicant is directed to the California State Water Resources Control Board
website for the CASQA SWPPP template. The SWPPP shall be accepted by the
City Engineer and filed and approved through the Storm Water Multiple
Application and Report Tracking System (SMARTS) prior to issuance of a
grading Permit.
20. Prior to issuance of a Grading Permit, the applicant must submit to the Director
of Community Development for review and approval an Erosion Control Plan.
The plan shall be designed to control erosion due to water and wind, including
blowing dust, during all phases of construction, including graded areas which are
not proposed to be immediately built upon.
21. The site/grading and drainage plan shall be signed by a Registered Civil
Engineer and a grading permit will be required. The grading plan shall be
prepared in strict accordance with the City's "Grading Policies and Procedures"
and the City's "Standard Drawings", unless otherwise approved by the City
Engineer prior to grading permit issuance.
22. Pad elevations shown on the rough and/or precise grading plan shall not vary
more than one -foot for interior pads or one-half foot for exterior pads from the
pad elevations shown on the tentative tract map as approved by the Planning
12
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Commission. Exterior pads are those pads immediately contiguous to existing
streets or existing residential areas. Grading Plans shall incorporate the design
features as per the accepted Water Quality Management Plan for this project,
23. If more than five trees are to be removed from the site, a tree removal permit
conforming to the requirements of Section 19.28.090 of the Development Code
shall be obtained from the Department of Community Development Planning
Division prior to issuance of any grading or site development permits.
24. The applicant must post a grading bond prior to issuance of a grading permit.
The amount of the bond is to be determined by the Land Development Division.
25. If more than 50 cubic yards of earth is to be hauled on City streets, a special
hauling permit shall be obtained from the City Engineer. Additional conditions,
such as truck route approval, traffic controls, bonding, covering of loads, street
cleaning, etc. may be required by the City Engineer.
26. Prior to issuance of a Grading Permit, the applicant must submit to the Land
Development Division for review and approval a liquefaction evaluation. Any
grading requirements recommended by the approved liquefaction evaluation
shall be incorporated in the grading plan.
27. The applicant shall submit to the Land Development Division for review and
approval an on-site Improvement Plan. Where feasible, this plan shall be
incorporated with the grading plan and shall conform to all requirements of
Section 15.04-167 of the Municipal Code (See "Grading Policies and
Procedures").
28. Prior to final inspection the applicant shall install a refuse enclosure. The refuse
enclosure(s) must be constructed in accordance with City Standard Drawing No.
508 and the minimum size of the refuse enclosure shall be 8 feet x 15 feet, unless
the Public Works Department, Refuse Division, approves a smaller size, in
writing. Where the refuse enclosure is proposed to be constructed contiguous to
spaces for parking passenger vehicles, a three-foot wide by six-inch high
concrete planter shall be provided to separate the enclosure from the contiguous
parking.
29. Where an accessible path of travel crosses drive aisles, the applicant shall
delineate the path of travel by textured/colored concrete pavement.
30. Prior to the issuance of Building Permits, the applicant must submit a Landscape
and Irrigation plan that has been prepared in substantial conformance with the
preliminary landscape plan dated February 27, 2013 and certain revisions dated
November 5, 2013 to the Land Development Division for review and approval.
Prior to the issuance of a Certificate of Occupancy, the applicant must install all
landscape and irrigation improvements in conformance with the final landscape
and irrigation plan. The Landscape Plan may be submitted, and the landscaping
may be installed, in `phases' to coincide with any phased development proposed.
13
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Each phase will be considered a `stand alone' improvement and not tied to any
other phase of the project.
31. Prior to occupancy of any building within any phase of the project, the developer
shall post a bond to guarantee the maintenance and survival of project/each phase
of landscaping for a period of one year. The Developer, one (1) year following
landscape installation and inspection is solely responsible to contact the Land
Development Division for inspection of the landscaping and to receive release of
any bonding requirements accordingly.
32. An easement and covenant shall be executed on behalf of the City to allow the
City to enter and maintain any required landscaping in case of owner neglect.
Upon request, the Real Property Section will prepare documents for execution by
the property owner. The documents shall ensure that, if the property owner or
subsequent owner(s) fail to properly maintain the landscaping, the City will be
able to file appropriate liens against the property in order to accomplish the
required landscape maintenance. A document -processing fee in the amount
established by ordinance shall be paid to the Real Property Section to cover
processing costs. The property owner, prior to on-site plan approval, shall
execute this easement and covenant unless otherwise allowed by the City
Engineer.
33. Prior to the issuance of a Building Permit, the applicant shall submit to the
Community Development Director for review and approval plans for the
screening of all utility equipment. Screening shall not be located in any
setback/right-of-way area. Prior to final inspection, the applicant shall install all
required screening. If the transformer cannot be screened, it shall be located in
an underground vault unless approved by the Director of Community
Development pursuant to Section 19.30.110.
34. The applicant shall design and construct all public utilities to serve the site in
accordance with City Code, City Standards and requirements of the serving
utility, including gas, electric, telephone, water, sewer and cable TV.
35. The applicant shall provide each parcel with separate water and sewer facilities.
36. The applicant shall install backflow preventers for any building with the finished
floor elevation below the rim elevation of the nearest upstream manhole
37. The applicant shall place all utility services shall underground and provide
easements as required.
38. The applicant shall place the existing overhead utilities with contiguous frontage
to Olive Street or traversing the site on the project side of the street underground
in accordance with San Bernardino Development Code Section 19.20.030.
Existing overhead utilities contiguous to Baseline Street and Olive Street on the
opposite side of the street are not required to be placed underground.
14
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
39. The applicant shall process a Tract Map for this project. The applicant is
directed to the City's web page at www.sbcity.org- Departments - Public Works
Submittal Requirements for submittal requirements.
40. The applicant must submit a Final Map based upon field survey prepared by a
Licensed Land Surveyor or a Registered Civil Engineer who may also practice
surveying, and must record the Final Map and the project's Conditions,
Covenants and Restrictions (CC&Rs) prior to the issuance of a Certificate of
Occupancy.
41. Street, sewer, drainage improvement, traffic signals, for the entire project shall
be completed, subject to the approval of the City Engineer, prior to the Map
recordation. The proposed project may be recorded on a phased basis, therefore
it is possible that improvements will be phased accordingly.
42. If the required improvements are not proposed to be completed prior to
recordation of the Final Map, a deferred improvement agreement in accordance
with Section 19.30.160 of the Development Code will be required. If the
agreement is approved, an improvement certificate shall be placed on the Final
Map, stating that the required improvements will be completed upon
development.
43. The applicant shall pay the Street Light Energy Fee to pay the cost of street light
energy on public streets, not including private roadways, for a period of four
years. The exact amount shall be determined and shall become payable prior to
map recordation.
44. The applicant shall construct an eight -inch curb and gutter per City Standard No.
200 contiguous to the site. The applicant shall also widen the pavement
contiguous to the site to match the new curb and gutter and shall construct
approach and departure transitions for traffic safety and drainage as approved by
the City Engineer.
45. At all curb returns within and contiguous to the project site, the applicant shall
construct accessible curb ramps in accordance with Caltrans Standards to comply
with current ADA accessibility requirements. The applicant shall dedicate
sufficient right -of way at the comer to accommodate the ramp on Olive Street
and Waterman Avenue, Olive Street and La Junita Street, and Baseline Street
and La Junita Street.
46. The applicant shall construct the driveway approaches per City Standard No.
203. The applicant shall remove all existing driveway approaches that are not
part of the approved plan and replace with full height curb and gutter and
sidewalk.
47. If the project is to be developed in phases, the applicant shall design each
individual phase to provide maximum public safety, convenience for public
service vehicles, and proper traffic circulation. In order to meet this requirement,
the following will be required prior to the finalization of any phase:
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
a) Improvement plans for the total project or sufficient plans beyond the
phase boundary to verify the feasibility of the design shall be complete
to the satisfaction of the City Engineer;
b) A Phasing Plan shall be submitted for review and approval by the
Engineering Division, Fire, and Planning Departments, indicating what
improvements will be constructed at each given phase;
C) Street improvements shall be completed beyond the phase boundaries,
as necessary to provide secondary access from the development;
d) Drainage facilities, such as storm drains, channels, earth berms and
block walls, shall be constructed, as necessary, to protect the
development from off-site flows on La Junita Street;
e) Easements for any of the above and the installation of necessary
utilities shall be completed prior to map recordation;
f) Phase boundaries shall correspond to the lot lines shown on the
approved tentative map.
48. The applicant shall submit a complete package for plan checking, which shall
consist of-
a)
£
a) Street improvement plans (may include street lights or street lighting
may be separate plan);
b) Sewer plans (private sewers may be shown on on-site improvement
plan; public sewers must be on a separate plan with profile);
C) Storm drain plans (private storm drains may be shown on on-site
improvement plans; public storm drains must be on a separate plan with
profile);
d) Traffic signal plans and/or traffic signal modification plans;
e) Signing and striping plan (may be on sheets included in street
Improvement plan);
f) Lighting (on-site lighting may be included in on-site improvement plan
or may be on a separate stand-alone plan);
g) Grading (may be incorporated with on-site improvement plan);
h) On-site landscaping and irrigation plan;
i) Landscaping and irrigation in the Landscape and Lighting Maintenance
District plan; and
D Other plans as required. Piecemeal submittal of various types of plans
for the same project will not be allowed. All required supporting
calculations, studies and reports must be included in the initial
submittal (including but not limited to drainage studies, soils reports,
structural calculations).
49. The rough grading plan may be designed and submitted in combination with the
precise grading plan.
50. The applicant shall submit an off-site improvement plan to the Land
Development Division for review and approval. All off-site improvement plans
submitted for plan check shall be prepared on the City's standard 24" x 36"
16
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
sheets. A signature block satisfactory to the City Engineer or his designee shall
be provided.
51. After completion of plan checking, final mylar drawings, stamped and signed by
the Registered Civil Engineer in charge, shall be submitted by the applicant to
the City Engineer for approval. Copies of the City's design policies and
procedures and standard drawings are available at the Public Works Counter for
the cost of reproduction. They are also available at no charge at the Public Works
Web Site at htt1)://www.sbcitv.org.
52. The applicant must submit electronic files of the Tract map to the City Engineer.
The files must be compatible with AutoCAD 2000, and include a .DXF file of
the project. Files shall be on a CD and shall be submitted at the same time the
final Mylar drawings are submitted for approval.
53. The applicant shall be responsible for obtaining the following Engineering
Permits: Grading Permit; Construction Permit for on-site improvements,
including landscaping; and Construction Permit for off-site improvements.
54. All plan check, permit, inspection, and impact fees are outlined on the Public
Works Fee Schedule. A deposit in the amount of 100% of the estimated checking
fee for each set of plans will be required at time of application for plan check.
The amount of the fee is subject to adjustment if the construction cost estimate
varies more than 10% from the estimate submitted with the application for plan
checking. The above payment of fees is subject to a Development Agreement
(DA) and therefore may differ from current and/or future fee schedules utilized
by the City. The current fee schedule is available at the Public Works Counter
and at http://www.sbcit>,.org.
55. The Traffic Study prepared by FEHR, & PEERS and Associates dated July 2012
has been reviewed and accepted. All identified traffic mitigation measures shall
be implemented at the developer's expense.
56. On-site landscaping (private areas) shall be installed by the applicant and
accepted prior to release of gas utility and prior to final inspection. This
condition may be implemented on a `per phase' basis.
57. The streets within any phase of the subdivision shall be base paved (0.10 foot
low) prior to delivery of construction materials to the site.
58. Prior to final inspection of the last three homes in the tract (or phase), the final
lift of pavement shall be installed.
59. Prior to final inspection and release of the last three homes in the tract (or phase),
the pavement on the streets contiguous to the tract shall be rehabilitated. The
method and extent of rehabilitation shall be determined at time of final
inspection by the City Engineer.
17
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
60. Applicant shall prepare a Network Hydraulic Analysis per Uniform Design
Standards prior to issuance of Building Permits. All hydrants/water systems shall
be designed to provide 20 psi residual flow at required fire flows. A Developer
installed Agreement is required prior to on-site water main extensions.
61. Prior to issuance of an Occupancy Permit, the applicant shall install a R.P.P.
backflow device at the service connection for domestic service.
62. Prior to issuance of an Occupancy Permit, the applicant shall install a double
check backflow device at the service connection for Fire and irrigation. The
backflow device shall be inspected before water service is activated.
63. The project is subject to Recalculation of the Sewer Capacity Fee and payment
of the fee prior to the issuance of a Building Permit. The Recalculation shall be
based on the agreed upon rates per the Development Agreement.
64. Prior to issuance of a building permit, the applicant shall submit to the Building
and Safety Division for review and approval building plans and site plans that
conform to the California Building Codes in effect at the time of plan submittal.
This shall include the California Green Building Code.
65. The applicant must use the three -second gust factor when preparing construction
plans since the project is located in a 95 mph, Exp C wind load area.
66. Prior to issuance of a building permit, the applicant shall submit to the Building
and Safety Division for review and approval plans that conform to the Title 24
Disabled Access and ADA requirements in place at the time of Building Permit
plan submittal.
Conditions Applicable As Indicated below:
67. The applicant shall design and construct the `off-site' sewer improvements,
Nodes 2147 and 2149 per the Sewer Study for Waterman Gardens dated April
30, 2013 (revised) prior to occupancy of a combined total of 253 units within the
project boundary. The location of the sewer segment to be designed and
constructed is in N. Sepulveda Avenue south of 5a' Street extending
approximately 400 feet connecting to an existing sewer mainline in 4a' Street.
The existing sewer mainlines may be either upgraded in size (per the study
mentioned herein) or a parallel mainline can be installed to achieve the desired
increase in flow capacity. In the event that there are `unforeseen circumstances'
uncovered during the design of the proposed sewer system, the applicant may
elect to pay the necessary sewer connection fee amount of $136,000.00 and any
occupancy above and beyond 253 units will be subject to the City completing the
above improvements. By either designing and constructing the proposed
improvements or paying the fee noted herein the Applicant shall have satisfied
their obligation for the entire development as submitted under this CUP
application.
68. For the streets listed below, prior to the issuance of a Certificate of Occupancy,
the applicant must dedicate the street right-of-way (R.W.) to provide the distance
IN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
from street centerline to property line and placement of the curb line (C.L.) in
relation to the street centerline shall be as follows:
STREET NAME ! RIGHT-OF-WAY (FEET) I CURB LINE (FEET)
Baseline Street 100 Feet 32 Feet
(Prior to certificate of
occupancy being issued
for the 3001i unit
Olive Avenue 60 Feet 20 Feet
(Prior to certificate of
occupancy being issued
for the 20011 unit
Waterman Avenue 110 Feet 43 Feet
(Prior to certificate of
occupancy being issued
for the 30011 unit)
69. La Junita Street is currently a private street and shall remain private until
acceptance by action of the City. Dedication of an easement for street and
highway purposes along this street will require specific approval of the Mayor
and Common Council. If approved by the Mayor and Common Council, the
street shall be improved to current City street standards with a dedicated right-of-
way that is 50 feet wide. The paved surface between curbs shall be 36 feet wide.
The applicant shall design and construct all curbs, gutters, paving, sidewalks,
drainage and street lights to City standards for the entire dedicated length prior to
acceptance by the City.
70. Prior to the certificate of occupancy for the 30011 unit being issued the applicant
shall construct sidewalk contiguous to the site in accordance with City Standard
No. 202; Case "A" (six feet wide contiguous to curb) along Baseline Street, and
the west side of La Junita Street. The applicant shall construct a sidewalk along
Olive Street with a reduced to five-foot width contiguous to curb where required
prior to the certificate of occupancy for the 2001i residential unit.
71. Prior to the certificate of occupancy for the retail/commercial/mixed-use being
issued the applicant shall replace all broken and off -set sections of sidewalk
and/or curb and gutter contiguous to the site on Waterman. The curb and gutter
shall conform to Standard No. 200, Type "B" and sidewalk shall conform to
Standard No. 202, Case "A" (six feet wide contiguous to curb), unless otherwise
approved by the City Engineer
72. The applicant shall design the curb bulb out returns at the following intersections
of Olive Street and Waterman Avenue (on the Olive Avenue side only), and
Olive and La Junita Streets to meet the minimum turning path for bus design
vehicles. A 42 -foot turning radius as referenced in the AASHTO-Geometric
Design of Highways and Streets shall be designed and constructed by the
applicant. The radii of the curb returns may be less than 42 feet when the
traveled path accommodates bus design vehicles.
19
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
73. Prior to issuance of certificate of occupancy for the 150"' unit being issued the
applicant shall install angle parking shall be designed and constructed along the
north side of Olive Street generally between La Junita Street and Waterman
Avenue. The exact location and parking design shall be approved and accepted
by the City Engineer.
74. Prior to issuance of certificate of occupancy for the 150'b unit being issued the
applicant shall install Street Lights contiguous to the site on Baseline Street in
accordance with City Standard Nos. SL -I and SL -2, Also, the applicant shall
submit a separate light plan in accordance with the City of San Bernardino Street
Lighting Design Policies. The applicant and City will determine which fixtures
can be upgraded for public safety purposes using existing poles.
75. Any new commercial driveways along Baseline shall align with existing
commercial driveways along the north side of Baseline Avenue. No
uncontrolled, marked pedestrian crosswalks shall be allowed on Baseline Street.
76. Prior to issuance of certificate of occupancy for the 300" unit being issued the
intersection of Waterman Avenue and Olive Street shall be signalized and
pedestrian facilities shall be provided. These new traffic signals shall be
interconnected with the existing traffic signal at Baseline Street. No
uncontrolled, marked pedestrian crosswalks shall be allowed on Waterman
Avenue. Other proposed improvements include:
a) Baseline/Crestview intersection signals and crosswalk. The new south
side of Crestview is to be aligned with the existing north side of
Crestview (Prior to the 175th unit).
SECTION 6. Severability: If any section, subsection, subdivision, sentence, or
clause or phrase in this Resolution or any part thereof is for any reason held to be
unconstitutional, invalid or ineffective by any court of competent jurisdiction, such decision
shall not affect the validity or effectiveness of the remaining portions of this Resolution or any
part thereof. The Mayor and City Council hereby declares that it would have adopted each
section irrespective of the fact that any one or more subsections, subdivisions, sentences,
clauses, or phrases be declared unconstitutional, invalid, or ineffective.
20
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
21
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION OF THE MAYOR AND CITY COUNCIL OF THE CITY OF SAN
BERNARDINO, CALIFORNIA, APPROVING CONDITIONAL USE PERMIT 17-26
(REVISED CONDITIONAL USE PERMIT 11-13) AND REVISED SUBDIVISION 11-
03 (REVISED TENTATIVE TRACT MAP 18829) FOR THE DEVELOPMENT,
ESTABLISHMENT AND OPERATION OF THE ARROWHEAD GROVE PROJECT
(FORMERLY KNOWN AS THE WATERMAN GARDENS PROJECT) ON A SITE
COMPRISED OF FOUR (4) PARCELS CONTAINING A TOTAL OF
APPROXIMATELY 39.36 ACRES LOCATED AT THE SOUTHEAST CORNER OF
WATERMAN AVENUE AND BASELINE STREET WITHIN THE BOUNDARIES OF
THE WATERMAN + BASELINE NEIGHBORHOOD TRANSFORMATION
SPECIFIC PLAN
I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor
and City Council of the City of San Bernardino at a Joint Regular Meeting thereof, held on the
20th day of December 2017, by the following vote, to wit:
Council Members:
MARQUEZ
BARRIOS
VALDIVIA
SHORETT
NICKEL
RICHARD
MULVIHILL
AYES NAYS
x
xs
XM
x
x
x
X
ABSTAIN ABSENT
Georgeann bianiia, CMC, dity Clerk
The foregoing Resolution is hereby approved this 20th day of December 201
Moo
R. Carey Davis, X4ayor
City of San Beniardino
Approved as to form:
Gary D. Saenz, City Attorney
By: Ina L -'LA
22
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
EXHIBIT A
APPROVED PLANS
23
a
0 --
c oe a a
d)
or
5 jh: HPp
n g&E 1x9
{5
�
€i6 €€�141 1 g
pp E y f C:u° f3g 1
5�A 1[Ay g61 5$$
$91 111 6&�gLL¢LLgLLLLaLLLL Pc58d 5$$l:d�
2 bn
.ilia
it
Ff �
3
0
L
SAWS PD04MGJIV
N
Z T
@
c
_
C % sane@
saes
sass
vE
c
E
41 � @@€f"
^€�€^
^AAA•
.�
FFdo � LLd� a .
gM!
PHI
I
9
V
d
w
ti
i!
<aaaaas
.. � � i_.• E i i a � LLea�� aLL�sa n ° °LLe
CL
a _g6E 1m FIER
s m n
j . f � � '� •, j d�47� dm43.s� dmx9c
0
U
2
U)
CL
2- -
a
RAE li 8als'6p19 S gold ails loi 3a 21
sa s ^I 114 tl
� O OIKIVJ nyewguei1WSWOA-�-v muuryeM H
c$ anoig poa4111outl
m
f:1
Um
I'
Wo
I
I
I
I
I
I
----------------------
r
Q
� II
1 I
1
I
I
I
I
1
i I
i
II�
ill
I
1 !
s
d � e �I'
I
0 1
�•y'ir'.
I.
t
11 0 li F)f' ��
I :.
jj 666 e
I: r�
is
,�.''•. V.
ACm `'LIyp�I
O':
♦ ' al
d � e �I'
I
0 1
1
I
1
!.
I
1
is
i
I I
11
I
i------
==�__�=_ == =='
-------------------
' }------
err
k
11
dTi
MmIrm ME
NOW
-WAU� it
CL
Im oppd a�ofiE 4
i4 il.ISM
cl
suDId MOOD A 1unwwo:) g muff
OI,Ld V] rowwuy uq IwS WO Wer'vaY �+Wiu'N
0A0J9 PD84MOJJV
'es
m m1
of
8
LL
�
71
1 l
L
•rc.l
rt-mp... i`I�
8
Q
LL
�
o
U-
'a
N
N
x�
b�
2
m
r
Q
CL
o §§ |!§ [
IF tit §
0 #-
§
F-
SUOIIDAal3 ma .
_JID PD64MOJJV
Q)
|
sMalA aANaadsiad
Dine r� •oKoou,a ws'wwswo wp «��«r.w�.wx.>,
BAJO poayxw"V
'
.........
3N3AY YSW
90.
I
....._Av
n r
Y
I
� g
-
€g
K G s
-H-1W! W;< W $� :
_ VIII
nz•„!ATM 1.11.1oxm
js ou i _ _ �I•jf
w v a,w3: h _; ti � •tv� : wR:� i �' 96j;'
a LL�--+1_• J -. �' '`ti ' �' .1U' iii
Iwo m mom,. o �• Is
7
ty
rl KZ I`� li'i �i-ti-I^.•`m ����` / � •ry�_\ ;�'��. \,` �1 S� _9,�11i m
m o 1� IIS{Ii � � ” I � � L I -' / .[ � - I \ • .� `I\\ '.w.' /i �' r 1 J n ' _, e }
zYz
W oma 33w.a W.3��ji I i-E,� / �'•� its ' !f
W
W �
II oa fA Dill liN Wim,., -L llQQ ff{—Di'1 ^` r:a $• I ; -� `:i,�I
a ^. )
LAJ
a I'f_—._srJ�- T -�,�'�•�r!'„�� ttcpp'� � z�"r. � i��'\l��Y��
m ' I
,� " xs��
��-�' �j � , - ���'� ,�,�✓`; �`:� ��� ,fit
I�''—\_� � _�__—__—_•••�'�"`'r.>2'BOB-��fy�--_-III '�-
Li _"T �__ -� -.� . � rskse %rr.:vd:•gf -:T _ __— y�= _-
---ter �... �_--i����4: �� _- •..�. :��
t' '