RESOLUTION NO. 2017-187
RESOLUTION OF THE MAYOR AND CITY COUNCIL OF THE CITY OF
SAN BERNARDINO, CALIFORNIA, APPROVING CONTRACT CHANGE ORDER
NO. 1 TO A CONTRACT IN THE AMOUNT OF $423,604.92 TO MARTINEZ
CONCRETE, INC., PER PLAN NO. 13036 (SS -B) FOR CONSTRUCTION OF ADA
ACCESS RAMP & SIDEWALK IMPROVEMENTS AND AMENDING THE FY 17/18
BUDGET
BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY
OF SAN BERNARDINO AS FOLLOWS:
SECTION 1. The City Manager is authorized to execute Contract Change Order No.
1 attached hereto and incorporate herein as Exhibit "A" to the contract with Martinez
Concrete, Inc., per Plan No. 13036 for construction of ADA Access Ramp & Sidewalk
Improvements and amending the FY 17/18 budget.
SECTION 2. The Director of Finance is authorized and directed to amend the FY
17/18 budget by allocating $67,273.99 in additional Measure I funding to Account No. 129-
160-7202-5504 "Construct Accessibility Improvements at Various Locations".
SECTION 3. The Purchasing Manager is hereby authorized and directed to increase
Purchase Order No. 2017-00000638 to Martinez Concrete, Inc., in the amount of $67,273.99.
SECTION 4. This Change Order No. 1 shall not take effect or become operative
! until fully signed and executed by the parties and no party shall be obligated hereunder until
the time of such full execution. No oral agreements, amendments, modifications or waivers
are intended or authorized and shall not be implied from any act or course of conduct of any
ply.
SECTION 5. The authorization to execute Contract Change Order No. 1 is rescinded
if the parties to the contract fail to execute it within sixty (60) days of passage of this
Resolution.
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION OF THE MAYOR AND CITY COUNCIL OF THE CITY OF
SAN BERNARDINO, CALIFORNIA, APPROVING CONTRACT CHANGE ORDER
NO. 1 TO A CONTRACT IN THE AMOUNT OF $423,604.92 TO MARTINEZ
CONCRETE, INC., PER PLAN NO. 13036 (SS -B) FOR CONSTRUCTION OF ADA
ACCESS RAMP & SIDEWALK IMPROVEMENTS AND AMENDING THE FY 17/18
BUDGET
I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor
and City Council of the City of San Bernardino at a Joint Regular Meeting thereof, held on the
4th day of October 2017, by the following vote, to wit:
Council Members:
MARQUEZ
BARRIOS
VALDIVIA
SHORETT
NICKEL
RICHARD
MULVIHILL
AYES NAYS
X
X
X
XM
X
X
X(S)
ABSTAIN ABSENT
L� Georgeann' Hanna, C �C, City Clerk
The foregoing Resolution is hereby approved this 4a' day of October 2017.
J
R. Carey Davi Mayor
City of San B mardino
Approved as to form:
Gary D. Saenz, City Attorney
B
y:27 `
2
EXHIBIT A
CITY OF SAN BERNARDINO
PUBLIC WORKS DEPARTMENT
290 North "D" • San Bernardino • CA 92401
909.384.5111 • Fax: 909.384.5155
CONTRACT CHANGE ORDER NO. ONE
FILE NO. SS -B W.O. NO. 7202 DATE: 10/04/2017
PROJECT: CONSTRUCTION OF ADA ACCESS RAMP & SIDEWALK IMPROVEMENTS,
DOWNTOWN ROUTE PLANS AND SPECIAL PROVISIONS. NO. 13036
TO: MARTINEZ CONCRETE, INC.
920 W. FOOTHILL BLVD.
AZUSA, CA 91702
GENTLEMEN:
You are hereby compensated for performing the additional work as follows:
ITEM NO:
DESCRIPTION OF CHANGE
COST
1-1
PCC Sidewalk at "E" Street, "F" Street, Rialto Avenue and r
$ 20,671.52
Street
1-2
PCC Sidewalk Bypass at various locations throughout the project
$ 890.57
area
$ 2,746.32
1-3
PCC Curb Type A at "E" Street, "G" Street and 4" Street (adjacent
to the Carousel Mall)
1-4 PCC Curb & Gutter along "E" Street, "F" Street and 2°d Street
$ 3,457.44
$ 1,568.12
1-5 PCC Cross Gutter/Spandrel at Birch Street and Eureka Avenue
1-6 Adjustment City PB/Covers at various location throughout the work
$ 7,140.00
area
$ 3,420.00
1-7 Install Metal Hand railing at 453 W. 4th Street
$ 150.00
$ 5,655.00
$ 712.81
1-8 Reset Tree Frames adjacent to the City's Performing Arts Theater
1-9
Asphalt Concrete Pavement at the Birch and Eureka intersection
Landscape Restoration on West 4th Street adjacent to the Carousel
1-10
Mall
1-11
PCC Curb & 26" Gutter in locations around the Carousel Mall
$ 5,227.50
1-12
PCC Curb & 36" Gutter at various locations
$ 3,984.24
CHANGE ORDER NO. ONE- MARTINEZ CONCRETE, INC.
CONSTRUCTION OF ADA ACCESS RAMP & SIDEWALK IMPROVEMENTS, DOWNTOWN ROUTE PLANS AND SPECIAL PROVISIONS.
NO. 13036
. .... _....... - _
1-13 I Repair Gate Activation Loop at the rear entry/exit to 550 West 5th $
Street
1-16
Repair to unmarked street light conduit at 524 W. 5th Street
Purchase & delivery of utility pull boxes at various locations
throughout the project area
Cross gutter at Birch Street & S. Eureka Avenue
S
669.38
1,753.00 ,
1,268.09
2,960.00
PCC curb ramp at Traffic Engineer's request on 453 W. 4th Street
1-17 $ 5,000.00
(south side)
TOTAL COST CCO #1 $ 67,273.99
L_
JUSTIFICATION:
1-1
1-2
PCC Sidewalk
During construction, several areas of sidewalk in the vicinity of Fairview Ford were
replaced where public injury had occurred, or severely hindered travel by wheelchair or
mobility scooter. Also, sidewalk had to be replaced in the vicinity of "E" Street, "F"
Street, Rialto Avenue and 2 I Street to correct excessive cross slope that did not
conform to re uirements of the American_ Disability Act (ADA),
PCC Sidewalk Rmas5
The contractor was directed to add additional sidewalk with retaining curb at
areas which had exceeded contract length due to existing parkway slope which
needed to be retained.
I PCC Curb Type -
During construction it was found that the poor condition of the existing AC berm in the
1-3 vicinity of "E" Street, "G" Street and 4" Street (adjacent to the Carousel Mall) would
not be acceptable for installation of an adjacent concrete sidewalk. The AC berm had to
be removed and laced with the PCC Curb Type -A.
I PCC Curb & Gutter
1-4 ' During construction, it was found that much of the existing 18" curb and gutter at drive
approaches proposed to be replaced were badly failing and had to be replaced. This
work occurred along "E" Street, "F" Street and 2r" Street.
PCC Cross Gutter/Spandrel
Two (2) spandrels had to be added at the intersection of Birch Street and Eureka
1-5 Avenue due to a revision in the drainage design. The revision was necessary because
the high centerline crown on Birch Street would have created water ponding at the
handicap ramp bottoms.
€ Adiustment Cite PB/Covers
At locations where failed sidewalk was specified to be removed and replaced, many
water meter and pull boxes had to be replaced, raised to grade, and set prior to concrete
1-6 placement. Unfortunately, many of the pull boxes were found to be damaged, covers
broken or missing and had to be completely- replaced by the contractor. The original
contract covered raising pull boxes and water meters to grade, but replacement of pull
boxes and meter covers was not included.
CHANGE ORDER NO. ONE - MARTINEZ CONCRETE, INC.
CONSTRUCTION OF ADA ACCESS RAMP & SIDEWALK IMPROVEMENTS, DOWNTOWN ROUTE PLANS AND SPECIAL PROVISIONS.
NO. 13036
InstallMetal Hand Railin
During construction it was determined that the contract linear footage indicated in the
1-7 contract document for the metal hand railing at 453 W. 4s' Street was short of the
measured length. Therefore, the total amount paid for the railing had to be increased by
19 linear feet based on the measured len. th.
Reset Tree Frames
During tree removals it was found that a tree frame outside of the original work area
1-8 (adjacent to the City's Performing Arts Theater) was impacted when a tree stump was
removed by the contractor. The tree grate was removed and delivered to the City yard
by the contractor. This additional work was not originally anticipated and was not
included in the original contract bid item.
As;.: halt Concrete Pavement
Additional asphalt concrete pavement was required to correct a problem street crown
1-9 and slot paving locations at the newly constructed cross -gutter and spandrels at the
Birch and Eureka intersection. This work was not part of the original contract and was
determined to be necessary when construction the ADA ram s and street crossin_
L_a_ndscw : a Restoration
1-10 Quantity changes were necessary due to field conditions and adjustments made during
the restoration of landscal i ink on West 4`h Street adi acent to the Carousel Mall.
PCC Curb & 26" Gutter
1-11 Curb and gutter repaired under contract in locations around the Carousel Mall resulted
in poor drainage of some curb and gutter sections. These sections had to be
reconstructed as extra work to correct the drainage roblem.
PCC Curb & 36" Gutter
1-12 During construction the contractor was directed to perform additional removal work of
PCC Curb & 36" gutter at several locations that showed signs of structural failure. This
additional work was not included in the original contract bid.
Rep air Gate Activation Loop
1-13 During construction the gate activation loop at the rear entry/exit to 550 West 51' Street
was damaged. This loop was not shown on the plan. The loops were reinstalled by the
contractor and the cost was shared 50/50 between the contractor andCity.
Repair to Unmarked Street Light Conduit
During construction, it was discovered that upon demolition and removal of the drive
1-14 approach at 524 W. 5h Street, an existing unmarked street light conduit was damaged.
The contractor provided labor and equipment to repair the conduit on a time and
material basis.
Purchase & DeHvery of Utility Pull Boxes
1-15 During construction it was found that several specialty utility pull boxes were needed to
replace those found damaged and not reusable. This occurred at various locations
throughout the roject area.
Cross Gutter at Birch Street and South Eureka Avenue
in constructing the ADA handicap ramps as per plan, it was discovered that existing
1-16 street centerline elevation would result in flooding at both ramp locations. A cross
gutter with new spandrels were installed for drainage of the intersection. This item
covers the cost of the cross ,!utter onl, . See item 1-5 for the cost of 2 new s-)andrels.
_..._ .._...--........-- ..... --- .....--..........
I. PCC Curb Ramii at Traffic Enineers' Rist
1-17 A new ADA ramp with railing was constructed on 453 W. 4`s Street (south side) which
was requested by the City Traffic Engineer to provide access to an existing ADA
accessible angle parking space at that location.
CHANGE ORDER NO. ONE - MARTINEZ CONCRETE, INC.
CONSTRUCTION OF ADA ACCESS RAMP & SIDEWALK IMPROVEMENTS, DOWNTOWN ROUTE PLANS AND SPECIAL PROVISIONS.
NO. 13036
SUMMARY OF CONTRACT COSTS
The estimated revised contract cost is as follows:
Original Bid Amount...........................................................$ 423,604.92
Contract Change Order No. One.................................................� 67 273.99
Revised Construction Contract cost..............................................� 490,878.91
This change order represents 15.9 % of the original contract amount.
MARTINEZ CONCRETE, INC.
CONTRACTOR
Accepted
wl�_In
By: / , \
Title: eC'O 1 Z d� oo n '°" 0'' P
Date: \ D , I -A \' \ \ —1
CITY OF SAN BERNARDINO
DEPARTMENT OF PUBLIC WORKS
Recommended by
By:
SAB ENGI� ESL
Acting Deputy Director of Public
Works/City Engineer
Date: U f
Approved
,kNDREA M. MILL
City Manager
Date: _October 4, 2017