HomeMy WebLinkAbout2017-047 1 RESOLUTION NO. 2017-47
2 RESOLUTION OF THE MAYOR AND CITY COUNCIL OF THE CITY OF SAN
BERNARDINO, CALIFORNIA, ADOPTING THE FIVE-YEAR CAPITAL
3 IMPROVEMENT PROGRAM (2016-2021) AND EXPENDITURE STRATEGY FOR
4 MEASURE 12010-2040 EXPENDITURES
5 BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF
SAN BERNARDINO AS FOLLOWS:
6
SECTION 1. In November 1989, San Bernardino County voters approved passage of
7
Measure I authorizing the San Bernardino County Transportation Authority (SBCTA)to impose
8
9
a half-cent retail transaction and use tax applicable in the incorporated and unincorporated areas
10 of the County to be used for transportation improvement and traffic management programs.
11 This Measure is known as Measure 11990—2010.
12 SECTION 2. In November 2004, San Bernardino County voters extended the one-half
13 of one percent retail transactions and use tax applicable in the incorporated and unincorporated
14 territory of the County of San Bernardino for 30 years, from April 1 2010, to March 31, 2010 —
15 2040. This Measure is known as Measure 12010-2040.
16 SECTION 3. Revenue from the tax can only be used for transportation improvements
17
and traffic management programs authorized in the Expenditure Plans set forth in Ordinance
18
No. 04-1 of the Authority.
19
SECTION 4. Each local jurisdiction applying for Measure I funds annually adopt and
20
update a Five-Year Capital Improvement Program (MICIP) and an Expenditure Strategy.
21
22 SECTION 5. The Mayor and City Council of the City of San Bernardino hereby
23 adopts the Five-year Capital Improvement Program (2016-2021) for Measure I Local
24 Expenditures (MICIP) attached hereto and incorporated herein as Exhibit A.
25 SECTION 6. The Mayor and City Council of the City of San Bernardino hereby adopts
the Expenditure Strategy attached hereto and incorporated herein as Exhibit B.
1
1 RESOLUTION OF THE MAYOR AND CITY COUNCIL OF THE CITY OF SAN
BERNARDINO, CALIFORNIA, ADOPTING THE FIVE-YEAR CAPITAL
2 IMPROVEMENT PROGRAM (2016-2021) AND EXPENDITURE STRATEGY FOR
3 MEASURE 12010-2040 EXPENDITURES
4 I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor and
City Council of the City of San Bernardino at a Regular Joint meeting thereof, held on March
5 20, 2017, by the following vote,to wit:
6 Council Members: AYES NAYS ABSTAIN ABSENT
7 MARQUEZ X
8 BARRIOS X
9 VALDIVIA X(S)
10
SHORETT X
11
NICKEL X�M)
12
RICHARD X
13
MULVIHILL X
14
i
15
16
17 Georb nn Hanna,CMC,City Clerk
18 X /4' 4C;�—
I The foregoing Resolution is hereby approved this �(� day of e 017.
j 19
i
20
R. CAREY D VIS, Mayor
21 City of San Bernardino
Approved as to form:
22 GARY D. SAENZ,
City Attorney
23
24 By ,
25
t
2
r
r
Exhibit APLAN PERIOD:2016/2017 to 2020/2021AGENCY NAME:Total Available (Carryover plus estimate)CARRYOVER BALANCE:$7,039,499.00$26,246,361.15Public Share (%)DIF Share (%)CarryoverFunds CurrentEstimateCarryoverFunds CurrentEstimateCarryoverFunds CurrentEstimateCarryoverFunds CurrentEstimateCarryoverFunds CurrentEstimateSS04-018 Mountain Avenue Street Improvements between 39th St and 40th Street640,000.00$ 472,500.00$ $472,500.00SS04-19 University Parkway and I-215 Freeway Interchange Improvements1,800,000.00$ 400,000.00$ 116,000.00$ 246,667.00$ 421,333.00$ 555,556.00$ $1,739,556.00SS04-152 "H" Street Widening from Kendall Dr to 40th St. (design only)1,022,000.00$ 67.6%32.4%80,000.00$ 220,000.00$ 330,000.00$ 392,000.00$ $1,022,000.00SS04-014 Old Waterman Canyon Bridge Repairs459,207.42$ 10,000.00$ $10,000.00SS10-007 SBX Rapid Transit Corridor Project Inspection Cost (RDA)119,376.43$ 10,000.00$ $10,000.00SS11-010 CALIFORNIA STREET Pavement Rehabilitation between 19th Street to Washington3,062.00$ 2,500.00$ $2,500.00SS12-004 WATERMAN AVENUE Pavement Rehabilitation between 13th Street and Gilbert Street12,562.00$ 12,000.00$ $12,000.00SS12-010 STERLING AVENUE Pavement Rehabilitation between Highland Avenue and Date Place 102,400.00$ 102,400.00$ $102,400.00SS12-013 DAVIDSON STREET Pavement Rehabilitation between 16th Street and 19th Street 88,666.00$ 88,000.00$ $88,000.00SS13-001 2ND STREET- BRIDGE Replacement at Warm Creek4,094,288.00$ 400,000.00$ 1,850,000.00$ 1,240,000.00$ 600,000.00$ $4,090,000.00TC12-002 9th Street & Arrowhead Avenue Signal Upgrade 269,416.70$ 250,000.00$ $250,000.00SS13-005 BASELINE STREET Pavement Rehabilitation between Lugo Street and Waterman Avenue50,112.00$ 48,000.00$ $48,000.00SS13-022 BASELINE STREET Pavement Rehabilitation between Del Rosa Drive and Knob Hill Rd (COOP)20,426.00$ 20,000.00$ $20,000.00SS13-034 GARNER AVENUE Pavement Rehabilitation between Baseline Street and 14th Street46,114.00$ 45,000.00$ $45,000.00SS13-035PICO AVENUE Pavement Rehabilitation between 9th Street and Olive Street 25,495.00$ 25,000.00$ $25,000.00SS13-037 SHERIDAN ROAD Pavement Rehabilitation between Lakewood Drive and State Street67,230.00$ 66,000.00$ $66,000.00SS13-039 EVANS STREET Pavement Rehabilitation between Western Avenue and Medical Center60,764.00$ 60,000.00$ $60,000.00SS14-007 TIPPECANOE AVENUE Pavement Rehabilitation between Harry Sheppard Drive to 3rd St25,784.00$ 22,000.00$ $22,000.00SS14-008 MILL STREET Pavement Rehabilitation between Waterman Avenue to Doolittle Street 18,862.00$ 18,000.00$ $18,000.00SS14-009 40TH STREET Pavement Rehabilitation between Harrison Street to Mountain Avenue500,667.00$ 500,000.00$ $500,000.00SS14-013 WILSON STREET Pavement Rehabilitation between 9th Street to Baseline Street 103,640.00$ 103,000.00$ $103,000.00SS14-014 28TH STREET Pavement Rehabilitation between Waterman Avenue to Valencia Avenue6,245.00$ 5,000.00$ $5,000.00SS14-015 28TH STREET Pavement Rehabilitation between "H" Street to Arrowhead Avenue110,294.00$ 108,000.00$ $108,000.00SS14-016 28TH STREET Pavement Rehabilitation between Arrowhead Avenue to Waterman Avenue 134,834.00$ 134,000.00$ $134,000.00SS14-017ARROWHEAD AVENUE Pavement Rehabilitation between 7th Street to 9th Street112,581.00$ 112,000.00$ $112,000.00SS14-018 9TH STREET Pavement Rehabilitation between Tippecanoe Avenue to Del Rosa Drive 17,736.00$ 17,000.00$ $17,000.00SS14-019 SIERRA WAY Pavement Rehabilitation between 9th Street to Baseline Street 209,774.00$ 209,000.00$ $209,000.00SS14-020 DEL ROSA AVENUE Pavement Rehabilitation between Del Rosa Drive to Highland24,952.00$ 24,000.00$ $24,000.00SS14-022 HARRISON STREET Pavement Rehabilitation between Lynwood Drive to 40th Street62,625.00$ 63,000.00$ $63,000.00SS14-024 G STREET Pavement Rehabilitation between 4th Street to 6th Street 20,626.00$ 20,000.00$ $20,000.00SS14-025 8TH STREET Pavement Rehabilitation between Medical Center Drive to Mt Vernon409,888.00$ 407,000.00$ $407,000.00SS14-026 WESTERN AVENUE Pavement Rehabilitation between Union Street to 9th Street333,489.00$ 33,000.00$ $33,000.00SS14-030 UNION STREET Pavement Rehabilitation between Mt Vernon Avenue to Western Avenue76,665.00$ 76,000.00$ $76,000.00SS14-033 WINDSOR DRIVE Pavement Rehabilitation between Park Drive to Morgan Road 80,700.00$ 80,700.00$ $80,700.00SS14-035 29TH STREET Pavement Rehabilitation between Waterman Avenue to Valencia Avenue44,889.00$ 44,000.00$ $44,000.00SS14-040 SPRUCE STREET Pavement Rehabilitation between Pice Avenue to Mt Vernon Avenue 25,464.00$ 25,000.00$ $25,000.00SS14-041 EUCALYPTUS AVENUE Pavement Rehabilitation between Santolinas Street to Park Vista11,691.00$ 11,000.00$ $11,000.00SS15-002 STERLING AVE Pavement Rehab. (co-op County of San Bernardino) between Pacific & Highland500,000.00$ 300,000.00$ 200,000.00$ $500,000.00SS15-003 J STREET Pavement Rehabilitation between 8th Street and 11th Street 122,430.00$ 122,000.00$ $122,000.00SS15-005 CALIFORNIA STREET Pavement Rehabilitation between Highland Avenue and Porter250,000.00$ 250,000.00$ $250,000.00SS15-006 TIPECANOE AVENUE Pavement Rehabilitation between Vine Street to 9th Street88,600.00$ 88,600.00$ $88,600.00SS15-007 AIRPORT DRIVE Pavement Rehabilitation between Commercenter East to Commercenter7,547.00$ 7,000.00$ $7,000.00SS15-008 IRVINGTON AVENUE Pavement Rehabilitation between Chestnut Avenue to Palm Avenue56,000.00$ 56,000.00$ $56,000.00SS15-009 BASELINE STREET Pavement Rehabilitation between Canyon Road to Conejo Drive 109,900.00$ 109,900.00$ $109,900.00SS15-011 RIALTO AVENUE Pavement Rehabilitation between Meridian Avenue and Pepper Avenue11,519.00$ 11,000.00$ $11,000.00SS15-012 BRIER DRIVE Pavement Rehabilitation between Gifford Avenue and Tippecanoe Avenue17,328.00$ 16,000.00$ $16,000.00SS15-017 "I" Street Pavement Rehabilitation between 14th St and Evens St30,973.00$ 30,000.00$ $30,000.00SS15-019 HIGHLAND AVENUE Pavement Rehabilitation between "H" Street and "G" Street 90,600.00$ 90,600.00$ $90,600.00SS15-020 MAGNOLIA DRIVE Pavement between 48th Street to Reservoir Street28,400.00$ 28,400.00$ $28,400.00SS15-021 PARK DRIVE Pavement Rehabilitatton between Morgan Road to Loyola Drive 38,400.00$ 38,400.00$ $38,400.00SS15-022 HIGHLAND AVENUE Pavement Rehabilitation between Sterling Avenue to Guthrie Avenue177,400.00$ 177,400.00$ $177,400.00SS15-048 HIGHLAND AVENUE Pavement Rehabilitation between SR 259 (State Route 259 or Crosstown Freeway) and H Street21,000.00$ 21,000.00$ $21,000.00SS16-020 CO-OP With the City of Highland for BASELINE STREET Rehabilitation from Del Rosa to Cole Ave (MSRC)277,400.00$ 277,400.00$ $277,400.00SS16-021 CO-OP With City of Highland for 14TH STREET Crosswalk Ramps no parking signs (SR2S)6,300.00$ 6,300.00$ $6,300.00SS16-022 CO-OP With City of Highland for BASELINE STREET, sidewalk closures (Article 3)10,600.00$ 10,600.00$ $10,600.00SS16-023 CO-OP with Ctiy of Highland Baseline and 5th St Signal Coordination upgrade (MSRC)5,900.00$ 5,900.00$ $5,900.00SS16-024 CO-OP With City of Highland for 5 corridors project, signal coordination upgrade and MSRC25,600.00$ 25,600.00$ $25,600.00SS16-025 CO-OP With City of Highland PALM AVENUE and PACIFIC STREET Improvements (ATP)43,280.00$ 43,280.00$ $43,280.00SS16-027 SBX- "E" STREET from 1Oth Street to Highland Avenue25,000.00$ 25,000.00$ $25,000.00SS17-001 ATP Cycle 2- Safe Routes to Schools Project at 3 Locations190,000.00$ 190,000.00$ $190,000.00F STREET Pavement Rehabilitation between Sequoia Street to Hill Drive 61,500.00$ 61,500.00$ $61,500.00H STREET Pavement Rehabilitation between 48th Street to Northpark Blvd 135,000.00$ 135,000.00$ $135,000.00MEASURE I LOCAL STREET PASS-THROUGH FUNDS FIVE YEAR CAPITAL IMPROVEMENT PLANPlease do not change, alter or modify this template. Use plus signs along left side of worksheet to add rows rather than manually inserting rows to ensure formulas are carried through.Estimated Total Project CostFY 2016/2017 FY 2017/2018 FY 2018/2019 FY 2019/2020 FY 2020/2021MEASURE I ESTIMATE: FY 2018/2019 FY 2019/2020 FY 2020/2021Total Local Street Measure I ProgrammedNamed Projects:$4,071,753.55FY 2017/2018CITY OF SAN BERNARDINO$3,838,018.24$3,726,231.30$3,953,158.78$3,617,700.29Nexus Project? FY 2016/2017Revised June 5, 2014
Exhibit AK STREET Pavement Rehabilitation between Baseline Street to 14th Street67,100.00$ 67,100.00$ $67,100.0017TH STREET Pavement Rehabilitation between Medical Center Drive to Western Avenue79,400.00$ 79,400.00$ $79,400.0023RD STREET Pavement Scrub Slurry between "D" Street and "E" Street13,500.00$ 13,500.00$ $13,500.0024TH STREET Pavement Scrub Slurry between "D" Street and "E" Street19,600.00$ 19,600.00$ $19,600.0027TH STREET Pavement Scrub Slury from D Street to E Street16,900.00$ 16,900.00$ $16,900.0028TH STREET Pavement Rehabilitation between Waterman Avenue and Fremontia85,000.00$ 85,000.00$ $85,000.0033RD STEREET Pavement Rehabilitation between "H" Street to "E" Street 101,900.00$ 101,900.00$ $101,900.0034TH STREET Pavement Rehabilitation between Mountain View Avenue to Sierra Way 57,100.00$ 57,100.00$ $57,100.0039TH STREET Pavement Rehabilitation between Modesto Drive to Del Rosa Avenue 121,500.00$ 121,500.00$ $121,500.005TH STREET Pavement Rehabilitation between Lankershim Avenue to Leslie Street 673,361.00$ 673,361.00$ $673,361.00ARDEN AVENUE Pavement Rehabilitation between Pacific Avenue to 20th Street 173,400.00$ 173,400.00$ $173,400.00ARROWHAD AVENUE Pavement Rehabilitation between 16th Street to Highland Avenue 218,100.00$ 218,100.00$ $218,100.00ARROWHEAD AVENUE Pavement Rehabilitation between 5th Street to 7th Street 136,700.00$ 136,700.00$ $136,700.00ARROWHEAD AVENUE Pavement Rehabilitation between 9th Street to Baseline Street 166,000.00$ 166,000.00$ $166,000.00ARROWHEAD AVENUE Pavement Rehabilitation between Baseline Street to 16th Street 212,600.00$ 212,600.00$ $212,600.00BAILEY AVENUE Pavement RehabiUIBtion between Kendall Drive to Gray Pine Court 73,900.00$ 73,900.00$ $73,900.00BASELINE STREET Pavement RehablhtalJOn between "K" Street to 1-215 Freeway 133,900.00$ 133,900.00$ $133,900.00BASELINE STREET Pavement Rehabilitation belween "H" Street to "E" Street 270,300.00$ 270,300.00$ $270,300.00CAJON BLVD Pavement Rehabilitation between Institution Road and City Limits (Shelter 119,600.00$ 119,600.00$ $119,600.00CALIFORNIA STREET Pavement Rehabilitation between 30th Street to Cajon Blvd 170,400.00$ 170,400.00$ $170,400.00CAMILIA DRIVE Pavement rehabilitation from Yucca Drive to Ralston Avenue 83,500.00$ 83,519.00$ $83,519.00CENTRAL AVENUE Pavement Rehabiliation between SR210 (State Route 210) to Highland 91,700.00$ 91,700.00$ $91,700.00CENTRAL AVENUE Pavement Rehabilitation between Pacific Street to SR210 (SR 210) 78,400.00$ 78,400.00$ $78,400.00COMMERCIAL ROAD Pavement Rehabilitation between Waterman Avenue and Steele 81,800.00$ 81,800.00$ $81,800.00CRESTVIEW AVENUE Pavement Rehabilitallon between Gilbert Street to 18th Street 91,800.00$ 91,800.00$ $91,800.00DEL ROSA AVENUE Pavement Rehabilitations between SR-210 to Date Street 24,000.00$ 24,000.00$ $24,000.00GIFFORD AVENUE Pavement Rehabilitation between Hardt Street to Brier Drive 38,300.00$ 38,300.00$ $38,300.00GRAND AVENUE Pavement Rehabilitation between ColleQe Avenue to Varsity Avenue 41,700.00$ 41,700.00$ $41,700.00HARDT STREET Pavement Rehabilitation between Gifford Street and Tippecanoe Avenue 364,300.00$ 364,300.00$ $364,300.00HIGHLAND AVENUE Widening at Del Rosa Channel 715,400.00$ 265,400.00$ 63,800.00$ 300,000.00$ 86,200.00$ $715,400.00HUNTS LANE Pavement Rehabilitation between Harwick Drive to Commercial Drive 180,000.00$ 180,000.00$ $180,000.00LITTLE LEAGUE DRIVE Pavement Rehabilitation between Meyers Road to end of St N/O Ohio146,200.00$ 146,200.00$ $146,200.00LYNWOOD DRIVE Pavement Rehabilitation between City Limits (Merito) to Sterling 82,700.00$ 82,700.00$ $82,700.00MARSHALL BLVD Pavement Rehabilitation between Arden Avenue to Belvedere Street 1,010,000.00$ 1,010,000.00$ $1,010,000.00MAYFIELD AVENUE Pavement Rehabilitation between Northpark Blvd and 59th Street 401,500.00$ 401,500.00$ $401,500.00MIRA MONTE DRIVE Pavement Rehabilitation between Oakwood Drive to 30th Street 71,000.00$ 71,000.00$ $71,000.00PACIFIC STREET Pavement Rehabilitation between City Limits (Olive) and Central 18,200.00$ 18,200.00$ $18,200.00PERSHING AVENUE and EDGERTON DRIVE Pavement Rehabilitation from Thompson 42,200.00$ 42,200.00$ $42,200.00PIEDMONT DRIVE Pavement Rehabilitation between Palm Avenue to Piedmont Avenue 103,700.00$ 103,700.00$ $103,700.00PUMALO STREET Pavement Rehabilitation between Del Rosa Avenue to Date Place 101,100.00$ 101,100.00$ $101,100.00PUMALO STREET Pavement Rehabilitation between Golden Avenue to Date Place 176,400.00$ 176,400.00$ $176,400.00RIALTO AVE Pavement Rehabilitation between Meridian Avenue to Pennsylvania Avenue566,800.00$ 566,800.00$ $566,800.00SEPULVEDA AVENUE Pavement Rehabilitation between 40th Street to Sierra Way145,600.00$ 145,600.00$ $145,600.00SIERRA WAY Pavement Rehabilitation between Highland Avenue to 28th Street140,500.00$ 140,500.00$ $140,500.00UNIVERSITY PARKWAY Pavement Rehabilitation between Hallmark Parkway to 1-21569,500.00$ 69,500.00$ $69,500.00Street Safety Improvements at Various Locations (Annual) 400,000.00$ 100,000.00$ 100,000.00$ 100,000.00$ 100,000.00$ $400,000.00VALENCIA AVENUE Pavement Rehabilitation between Highland Avenue to 29th Street288,500.00$ 288,500.00$ $288,500.00WATERMAN AVENUE Pavement Rehabilitation from Mill St to Central Ave313,100.00$ 313,100.00$ $313,100.00WATERMAN AVENUE Pavement Rehabilitation from Vanderbilt Way to Dumas St435,400.00$ 435,400.00$ $435,400.00WESTERN AVENUE Pavement Rehabilitation from Kendall Dr to 48th St141,200.00$ 141,200.00$ $141,200.00Widen and Extend Mt View Avenue from Santa Ana River to I-10 Freeway (IVDA)30,000.00$ 30,000.00$ $30,000.002,500,000.00$ 500,000.00$ 500,000.00$ 500,000.00$ 500,000.00$ 500,000.00$ $2,500,000.00750,000.00$ 150,000.00$ 150,000.00$ 150,000.00$ 150,000.00$ 150,000.00$ $750,000.00272,506.33$ 250,000.00$ $250,000.00$0.00$0.00$0.00Project Count: 136 Named Projects Total:26,605,469.88$ -$ 6,955,443.00$ -$ 5,316,300.00$ -$ 3,912,867.00$ -$ 3,628,733.00$ -$ 5,494,936.00$ $25,308,279.00Total Carryover + Estimate:25,308,279$ $25,308,279.00(%) Named Projects:2,500,000.00$ 500,000.00$ 500,000.00$ 500,000.00$ 500,000.00$ 500,000.00$ $2,500,000.00750,000.00$ 150,000.00$ 150,000.00$ 150,000.00$ 150,000.00$ 150,000.00$ $750,000.00$0.00$0.00$0.00$0.00$0.00$0.00Categorical Projects Total: 3,250,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ $3,250,000.00(%) Categorical Projects (cannot exceed 50%):18% 17% 17% 16% 16%Total Programmed: 28,558,279.00$ Total Carryover Programmed: -$ SS-B Construct Accessibility Improvements at Various Locations (Annual)TC12-001 9th Street and Sierra Way Signal Upgrade(*) = Carryover funds may not be used on Catergorical Projects.Categorical Projects Total *:SS-B Construct Accessibility Improvements at Various Locations - CitywideAdministration135%192%$5,494,936.00143% 102% 92%$6,955,443.00 $5,316,300.00 $3,912,867.00 $3,628,733.00SS-N CIP Administrative ServicesRevised June 5, 2014
Exhibit AIn Accordance with Measure I Strategic Plan Policy 40003:Total Estimated Programmed: 28,558,279.00$ 1. If Measure I allocated to project is ≥ $100,000, then list individually in Named Projects section.Check: 28,558,279.00$ 2. There is a 50% limit on total categorical projects. 150% of Estimated Measure I plus carryover: 39,369,541.73$ 3. There is a 150% constraint on total planned expenditures to Measure I estimated revenue.Does programing amount exceed 150% limit: No4. Expenditures of Measure I Local Street funds must be detailed in the Five Year Capital Improvement Plan and adopted by resolution of the governing body.5. Revised Capital Improvement Plans are due to SANBAG by the end of the fiscal year along with the resolution.RESOLUTION NUMBER:RESOLUTION APPROVAL DATE:CONTACT PERSON & TITLE:CONTACT PHONE:CONTACT EMAIL:2016-___11/07/2016Saba Engineer, Principal Engineer909-394-5284engineer_sa@sbcity.orgRevised June 5, 2014
Exhibit B
CITY OF SAN BERNARDI NO
MEASURE I FI VE-YEAR CAPITAL I M PROVEM ENT PROGRAM
EXPENDITURE STRATEGY
2016-2021
The City of San Bernardino will continue to place emphasis on both its regional and
sub-regional arterial roadway system. At least fifty percent of the City's Measure I
allocation will be earmarked for specific capital projects that are geared toward
improving traffic flow and motorist convenience. Failing pavement surfaces will be
rehabilitated and traffic striping modified as needed to accommodate increased traffic
demand; and intersection capacity will be improved with new and modified traffic
signals.
In addition to the above capital projects program, San Bernardino will continue to
allocate up to fifty percent of its annual Measure I funds towards public works
maintenance activities. Maintenance work will continue to include the City's traffic
signal systems, sidewalk and curb repair, and pavement repair and overlay on the local
street system.