Loading...
HomeMy WebLinkAbout1980-189 RESOLUTION NO. &_ j,P p 1 A RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AUTHORIZING THE EXECUTION OF CONSULTANT AGREEMENT 2 FOR PROFESSIONAL ENGINEERING SERVICES, BETWEEN SAID CITY AND BERRYMAN AND STEPHENSOd, INC. 3 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF 4 SAN BERNARDINO AS FOLLOWS: 5 SECTION 1 . The Mayor of the City of San Bernardino is hereby 6 authorized and directed to execute on behalf of said City Consultant 7 Agreement for Professional Engineering Services for eight (8) traffic 8 signal projects, between said City and Berryman and Stephenson, Inc. , 9 a copy of which is attached hereto marked Exhibit "A" and incorporated 10 herein by reference as fully as though set forth at length herein. 11 I HEREBY CERTIFY that the foregoing resolution was duly adopted 12 by the Mayor and Common Council of the City of San Bernardino at a,-- 13 h meeting thereof, held on the ? day of 14 1980, by the following vote, to-wit: 15 AYES: Councilmen: r 17 NOES: 18 ABSENT: ._ 19 20 SHALfNA LARK, City Clerk 21 The foregoing resolution is hereby approved this d of 22 1980. I 23 / y o e of San B nardlno 24 Approved as to form: 25 � C_- 26 City Attorney 27 28 No. 503380 _- d CONSULTANT AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES THIS AGREEMENT, made this n day of 19 o'D , by and between the City o San Bernardino, nice al corporation in the State of California , hereinafter referred to as CITY, and Berryman & Stephenson, Inc. , a California corporation, hereinafter referred to as ENGINEER. WITNESSETH: WHEREAS, CITY desires to engage ENGINEER to render certain professional engineering services in connection with the design and preparation of construction plans , technical specifications , and cost estimates for the installation or modernization of traffic signals at eight locations ; and WHEREAS, ENGINEER is qualified under the laws of the State of California and has the necessary skills to' render said professional engineering services . NOW, THEREFORE, it is agreed by and between CITY and ENGINEER as follows : A. Descriptions and Locations of Traffic Signal Projects 1 . Del Rosa Ave/Highland Ave - Modernize existing traffic signal , install 8-phase fully actuated controller with pedestrian movements , consider widening Del Rosa Ave to provide a right-turn lane for southbound. Funding will be Federal-Aid Urban. 2 . Mill St/Mount Vernon Ave - Moderrii2e; existing traffic signal , install multi-phase fully actuated controller with pedestrian movements , evaluate need for left-turn phases , widen Mill St . approaches to 66 feet between curbs . Funding will be Federal-Aid Hazard Elimination. 3. Orange Show Rd/"E" St - Modertx7``existing traffic signal , install 8-phase fully actuated controller with pedestrian movements , stripe fight-turn lane on "E" St. for southbound and provide right-turn arrows for southbound and eastbound. Widen "E". St. for southbound right-turn lane. Funding will be Federal-Aid Urban. 4. Fifth St/Mount Vernon Ave - Modernize existing traffic signal , install multi-phase fully actuated controller with pedestrian movements , consider left-turn phases and interconnect along Mount Vernon Ave, obtain Caltrans design approval . Funding will be Federal-Aid Urban. 5 . Baseline St/Waterman Ave - Modernize existing traffic signal , install 8-phase fully actuated controller with pedestrian movements , stripe right-turn lanes on Waterman Avenue and provide right-turn arrows . Funding will be local-agency. 6 . Baseline St/Windsor Dr-Myrtle Dr - Install a new traffic signal with multi-phase fully actuated controller and pedestrian movements . Funding will be Federal-Aid Urban. Exhibit "A" -l- 7 . Del Rosa Ave/Pumalo St - Install a new traffic signal with 2-phase fully actuated controller and pedestrian movements . Consider interconnect along Del Rosa Ave. Some street improvements and right of way may be needed. Obtain County of San Bernardino design approval . Funding will be Federal-Aid Urban. 8 . Foothill B1/Macy St (South) - Install a new traffic signal with 2-phase fully actuated controller and pedestrian movements . Some street improvements may be needed. Obtain Caltrans design approval . Funding will be Federal-Aid Urban. $. Description of ENGINEER' s Services ENGINEER shall provide professional engineering services for the eight traffic signal projects as follows : 1 . Preparation, of this Consultant Agreement in conformance with the requirements set forth in the California Department of Transportation, Local Programs Manual , Volume I , Section 11 , "Engagetrierit oF Congultants". 2. Analysis and recommendations for special signal phasing, interconnect , approach widening, street improvements , and right of way acquisitions , 3. Recommendations for the revi8lob of traffic signs and pavement markings to supplemeht the traffic signal improvements . %4, 4 . Topographical surveys for street widening improvements . S . Design and preparation of construction plans , technical specifications , and cost estimates for the traffic signal and street improvements outlined in the project descriptions . 6 . Preparation of construction Area traffic control (detour) plans meeting the requirements for Federally funded projects . 7 . Submittal of preliminary designs to the CITY for approval of concepts by all participating jurisdictions prior to preparation of final plans . ENGINEER' s representatives will attend conferences to discuss design concepts at the request of the CITY. 8 . Furnishing of one set of final construction plans , technical specifications , and cost estimates . 9 . Consultation and interpretation of the plans and specifications during bidding and construction, including the review of shop drawings for traffic signal equipment . The ENGINEER' s services do not include subsurface or soils investigations ; construction administration, inspection, or staking; preparation of "as-built" plans ; or determination and setting of traffic signal timing or coordination strategies . -2- C. Obligations of CITY to ENGINEER CITY support at no cost to the ENGINEER shall be as follows : 1 . Furnishing of as-built plans of record for existing improvements and substructures , and any other pertinent information which may be available from City files . 2 . Furnishing of sample plans and specifications illustrating the standard practices of the City. 3 . Furnishing of standard drawings and specifications unique to the City. 4 . Submittal of plans to utilities for verification of substructures and facilities . 5 . Coordination with participating jurisdictions for approval of concepts . 6 . Formal submittal of plans and specifications to the California Department of Transportation for approval as required for Federally funded projects . 7 . Acquisition and certification of rights of way, and preparation of environmental documents , if any. 8 . Printing of final plans and specifications for bidding purposes . h, Design Standards ENGINEER shall adhere to the following design standards for services provided under this agreement : 1 . Design details shall conform to the California Department of Transportation, Standard Specifications dated January, 1978 , and Standari Pl ans dated March, 1977 , and also to the standard prac ices of the City of San Bernardino. 2 . All documents for the Federally funded improvements shall be prepared in conformance with the requirements of the Federal Highway Administration. 3 . The construction plans are to be prepared in ink on mylar furnished by the ENGINEER with the CITY title block. Separate plans shall be prepared as follows : a. Each traffic signal at a scale of 1"=201 . Minor striping and signing revisions to be included on the traffic signal plans . b . Each area. of major striping and signing work at a scale of 1"-401 . C. Each area of significant street improvement work requiring plan and profile at a plan scale of 1"=40 ' . -3- d. Each construction area traffic control plan at a scale of 111=401 . e. A title sheet or sheets , depending upon the number of separate contracts to be advertised. 4 . The technical specifications shall be submitted in completed form for inclusion by the City into final form conttact documents . S . The construction cost estimates shall be itemized. E. Time for Completion The first order of work shall be the submittal of this Consultant Agreement to the California Department of Transportation for approval . ENGINEER shall complete all design work as described in Sections B-2 through B-8 above within five (5) months from said approval of the Consultant Agreement . The project at Baseline St . / Waterman Ave . described in A-5 abbVe shall be completed within two months of said approvdlt In the event of unavoidable delays , the time for completion may be extended by mutual consent of both parties . The anticipated project schedule Is ds follows : Project Seh-edule Project Phases Calendar Months 1980 3 4 5 6 7 8 9 Ptepdre Consultant Agreement Caltrans Review of Agreement txecUte Consultant Contract ■ Prepare Preliminary Designs Concept Review Period Prepare Final Designs Caltrans Review Period Prepare Final Documents F. Fees and Payments ENGINEER shall provide all services required under this agreement for a Cost Plus Net Fee Amount not to exceed twenty-three-thousand-one-hundred dollars ($23 ,100) . The ENGINEER'S Breakdown of time and costs used to develop this fee are shown in Appendix A to this agreement. Appendix B shows a breakdown of the fee by project loca- tion. Appendix C is the computation of the ENGINEER'S overhead. CITY shall pay ENGINEER for services performed hereunder on a monthly basis within thirty (30) days of receipt of ENGINEER' S invoice for the portion of the work accomplished. -4 G. Changes in Work Adjustment of the :fee shall be negotiated when ENGINEER establishes , and CITY, California Department of Transportation, and Federal Highway Administration agree, that there has been or is to be a significant change in: 1 . Scope, complexity, or character of the services to be performed; 2 . Conditions under which the work is required to be performed; or 3 . Duration of work if a change from the time period specified in this Agreement for completion of the work warrants such adjustment. 1-1. Termination of Agreement This agreement may be terminated by either party upon tendering thirty (30) days written Notice to the other party. Said Notice shall be deemed given when delivered to the other or placed in a mail boxy postage prepaid, and addressed to the following : Mr. 0. Max Sloan, Vice Presidhrit Berryman & Stephenson, Inc, 1906 S. Commercenter East ) Suite 204 San Bernardino , CA 92408 and Mr. C. Glenn Wilson Director of Public Works/City Engineer City of San Bernardino 300 North "D" Street San Bernardino, CA 92418 In the event of termination of this agreement , the CITY shall be liable to ENGINEER only for costs incurred to the termination date plus a pro-rate share of the fixed net fee amount . I . Assignment and Transfer. ENGINEER shall not assign or transfer any of the obligation for services under this agreement without express consent of CI'T'Y. J. Responsibility for Liability ENGINEER shall save harmless CITY, California Department of Transportation, and Federal Highway Administration from all claims and liability due to negligent acts of the ENGINEER,, his agents , or employees . K. Compliance with Cavil. Rights Regulations During the performance of this contract , ENGINEER agrees as follows : 1 . Equal Employment Opportunity In connection with the execution of this contract, ENGINEER shall not discriminate against any employee or applicant for employment because of race , religion, color, sex, or national origin. Such actions shall include, but not be limited to, the following : employment , upgrading, demotion, or transfer; recruitment advertising ; layoff or termination ; rate of pay, or other forms of compensation; and selection for training , including apprenticeship . -5- 2 . Nondiscrimination Civil Rights Act of 1964 ENGINEER, with regard to the work performed by it after award and prior to completion of the contract work, shall comply with the regulations of the California Department of Transportation relative to nondiscrimination in Federally Assisted programs of said Department (49CFR21) . 3 . Solicitations for Subcontracts , Including Procurements of Materials and Equipment In all solicitation, either by competitive bidding or negotiation, made by ENGINEER for work to be performed under a subcontract, including procurement of mdterials or leases of equipment, each potential subcontrdctor , supplier, or lessor shall be notified by ENGINEER of ENGINEER' s obligations under this contract and the Regulations relative to nondiscrimination on the grounds of race , religion, color, sex, or national origin. 4 . Information and Reports ENGINEER shall provide all information and reports required by the California Department of Transportation or Federal Highway Administration Regulations , or orders and instructions issued pursuant thereto , and will permit access to its books , records , accounts , other sources of information, and its facilities as may be determined by CITY, California Department of Transportation or by Federal Highway Administration to be pertinent to ascertain compliance with such Regulations , orders , and instructions . Where any information required of an ENGINEER is in the exclusive possession of another who fails or refuses to furnish this information, ENGINEER shall so certify to CITY, California Department of Transportation or Federal Highway Administration as appropriate, and shall set forth what efforts it has made to obtain the information. S . Sanctions for Noncompliance In the event of the ENGINEER' s noncompliance with the nondiscrimination provisions of this contract , CITY shall impose such contract sanctions as CITY, California Department of Transportation or Federal Highway Administration may determine to be appropriate, including , but riot limited to : a. Withholding of payments to ENGINEER under the contrast until ENGINEER complies ; and/or b . Cancellation, termination, or suspension of the contract , in whole or in part. 6. Incorporation of Provisions The ENGINEER shall include the provisions of paragraphs (1) through (6) of this section in every subcontract , including procurements of materials and leases of equipment , unless exempt by Federal regulations , or directives issued pursuant thereto. The ENGINEER shall take such action with respect to any subcontract or procurement as the California Department of Transportation or the Federal Highway Administration may direct as a means of enforcing such provisions including sanctions for noncompliance: Provided, however, that , in the event the ENGINEER becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of such direction, the ENGINEER may request the California Department of Transportation to enter into such litigations to protect the interests of the State, and, in addition, the ENGINEER may request the United States to enter into such litigation to protect the interests of the United States . -6- L. Covenant Against Contingent Fees ENGINEER warrants that he has not employed or retained any company or person to solicit or secure this contract, and that he has not paid or agreed to pay any company or person any fee, commission, percentage , brokerage fee, gifts , or any other consideration, contingent upon or resulting from the award or making of this contract. For breach of violation of this warranty, CITY, California Department of Transportation or Federal Highway Administration shall have the right to annul this contract without liability or, in its discretion, to deduct from the contract price or consideration, or otherwise recover the full amount of such fee , commission, percentage , brokerage fee, gift , or contingent fee. M. Records and Audits ENGINEER shall maintain complete and accurate records with respect to costs incurred under this Agreement , including the records supporting cost proposals used to enter into a contract with the CITY. All such records shall be maintained on a generally accepted accounting basis and shall be clearly identifiable . ENGINEER shall make available to the representative of CITY, California Department of Transportation and pederal. Highway Administration, or their appointees $ during normal business hours , all of such books and records , and the right to examine and audit the sdme, and to make transcripts therefrom as necessary, and the ENGINEER shall allow inspection of all work data, documents , proceedings , and activities related to the Agreement for a period of four (4) years from the date of final payment under this Agreement. ENGINEER shall maintain records to show actual time and allowable costs with respect to each task set forth in the Appendix A as required by California Department of Transportation and Federal Highway Administration. ENGINEER shall permit the authorized representatives of CITY, the U. S. Department of Transportation and Controller General of the United States to inspect and audit all data and records of ENGINEER relating to his performance under this Agreement . N. Arbitration of Disputes Any controversy or claim arising out of or relating to the provisions of this Agreement , or the breach thereof, shall be settled by arbitration at the election of either party in accordance with the Rules of the American Arbitration Association at Los Angeles , California, and judgement upon the award rendered by the Arbitrators may be entered in any count having jurisdiction thereof. 0. Ownership of Documents All original tracings of plans , and the original copy of specifications , shall be delivered to the CITY by ENGINEER, and they shall become the property of CITY. Field survey notes , sketches , charts , computations , and other data prepared by ENGINEER shall be turned over to the CITY if so requested. P. Cost Principals The ENGINEER' s costs , direct and indirect , eligible for Federal participation shall be those allowable under the provisions of Federal Procurement Regulations , Principles and Procedures for Use in Cost-Reimbursement Type Supply and Research Contracts with Commercial Organizations , Title 41 , Subpart 1- 15 Code of Federal Regulations . - 7- IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be sigw:d by their proper corporate officers and have caused their proper corporate real to be hereto affixed the day and year first above written. CITY OF SAN BERNARDINO Date 4, 11D ATTEST: Approved as to Form: ity C er k City tt ney BERRYMAN & STEPHENSON, INC. By Vice Presi ent Date L112 �Z'PO By 6&J-OW�j Cc cr tar - reasure CALIFORNIA DEPARTMENT OF TRANSPORTATION c By Date O Ti e �„oCr�.LSS` �v: A -8- CERTIFICATION OF CONSULTANT I hereby certify that I am the Vice President and duly authorized representative of the firm of BERRYMAN AND STEPHENSON, INC . , whose address is 1906 S. Commercenter East , Suite 204 , San Bernardino , California, and that neither 1 nor the above firm I here represent has : (a) Employed or retained for a commission, percentage, brokerage fee, contingent fee , or other consideration, any firm or person (other than a bona fide employee working solely for me or the above consultant) to solicit or secure this agreement ; (b) Agreed, as an express or implied condition for obtaining this contract , to employ or retain the services of any firm or person in connection with carrying out the agreement , or (c) Paid, or agreed to pay, to any firm organization or person (other than a bona fide employee working solely for me or the above consultant) any fee , contribution, donation or considera- tion of any kind for , or in connection with procuring or carrying bUt the agreement ; except as here expressly stated (if any) : None I acknowledge that this certificate is to be furnished to the City of San Bernardino , State of California and the Federal Highway Administration, U. S . Department of Transportation, in connection with this agreement involving participation of Federal. aid highway funds , and is subject to applicable State and Federal laws , both criminal and civil . C f 2 Date � �� 44 5'U ice 'President CERTIFICATION OF CITY OF SAN DERNARDINO I hereby certify that I am the Mayer of the City of Seri Bernardino and that the consulting firm of BERRYMAN AND STEPHENSON, INC . or its representative has not been required, directly or indirectly, as an express or implied condition in connection with obtaining or carrying out this agreement to : (a) Employ or retain, or agree to employ or retain , any firm or person, or (b) Pay, or agree to pay, to any firm, person, or organization, any tee, contribution, donation., or consideration of any kind; expect as here expressly stated (if any) : None I acknowledge that this certificate is to be furnished to the State of California , the Federal Highway Administration and U. S . Department of Transportation in connection with this agreement involving participation of Federal and highway funds , and is subject to applicable State and Federal laws , both criminal and civil . �y Date - "M o , an er r i.no U f `r APPENDIX A COST PLUS NET FEE AMOUNT SCHEDULE FOR EIGHT TRAFFIC SIGNAL PROJECTS CITY OF SAN BERNARDINO March 12 , 1980 � DIRECT SALARIES HOURS RATE AMOUNT A. Design Engineering Project Director 30 $24 . 60 $ 738 Project Engineer 160 15 . 58 2 ,493 Senior Designer 230 13. 27 3, 053 Draftsman 136 10 . 10 1 , 374 Clerk Typist 12 7 . 36 89 Sub-Total $ 7 , 747 $ , Design Surveying Licensed Land Surveyor 2 $15 . 58 $ 32 Party Chief 20 12 . 70 254 Senior Chainman 20 10 . 70 214 Rear Chainman 20 7 . 50 150 Sub-Total $ 650 C . Bidding and Construction Consultation Project Engineer 3 $1.5 . 58 $ 47 Senior Designer 5 13 . 27 67 Sub-Total $ 114 TOTAL DIRECT SALARIES $ 8 , 511 2 . SPECIALIZED SERVICES (direct expenses) A. Reproductions $ 162 3. SUMMARY A. Direct Salaries $ 8 ,511 B . Overhead and Benefits at 145% ,,_3 C : Sub-Total D. Fixed Net Fee at 10% 2 ,086 162 E. Specialized Services F . 'Total, Cost Plus Net Fee Amount $23,100 APPENDIX B ESTIMATE OF PEES BY PROJECT LOCATION FOR EIGHT TRAFFIC SIGNAL PROJECTS CITY OF SAN BERNARDINO March 12 , 1980 ESTIMATED PROJECT LOCATIONS FEES Del Rosa Ave/Highland Ave $4 ,100 - Separate plans for signal , street work, striping, and construction traffic control - Topographical survey required u . Mill St/Mount Vernon Ave $4 , 400 -Separate plans for signal , street work, striping , and construction traffic control - Topographical. survey required 3. Orange Show Rd/"E" St . $4 ,100 - Separate plans for signal , street work , striping, and construction. traffic control - Topographical survey required 4 . Vifth St/Mount Vernon Ave $2 ,000 Interconnect included on signal plan - Construction traffic control covered by specifications - Specific Caltrans approval required 5. Baseline St/Waterman Ave $1 , 700 Striping included on signal plan 6 . Baseline St/Windsor Dr-Myrtle Dr $2 ,200 - Minor street work included on signal plan - Right of way analysis required - Construction traffic control covered by specifications 7 . Del Rosa Ave/Pumalo St . $2 ,400 - Interconnect and minor street work included on signal plan. - Construction traffic control covered by specifications - Right of way analysis required - Specific County approval required 8 . Foothill BI/Macy St . South $2 , 200 - Minor street work included on signal plan - Construction traffic control covered by specifications - Specific Caltrans approval required TOTAL ESTIMATE FEE $23 ,100 APPENDIX C ENGINEER' S OVERHEAD ANALYSIS BERRYMAN €, STEPHENSON, INC . Fiscal Year Ending March 31 , 1978 ti Percent Direct Labor 100 Overhead Indirect Salaries 49 Payroll Related Costs (taxes , sick leave, 32 vacation, etc. ) Professional & Consultant Fees 15 Communications 4 Occupancy 9 Supplies 7 $usiriess Insurance 3 External Relations 6 Reproduction & Photography 2 Travel & Subsistence 1 Auto Expense 11 Depreciation & Amortization 2 Miscellaneous 2 Library $ Data Processing 1 Taxes & Licenses 1 Overhead Total 145