Loading...
HomeMy WebLinkAbout05.M- Public Works 5.M RESOLUTION (ID # 4419) DOC ID: 4419 C CITY OF SAN BERNARDINO — REQUEST FOR COUNCIL ACTION Capital Improvement Program (CIP) From: Chris Alanis M/CC Meeting Date: 05/16/2016 Prepared by: Fawna Velci, (909) 384- 5140 Dept: Public Works Ward(s): 2 Subject: Resolution of the Mayor and Common Council of the City of San Bernardino Awarding a Contract in the Amount of $423,604.92 to Martinez Concrete, Inc., Per Plan No. 13036 (SS-B) for Construction of Ada Access Ramp & Sidewalk Improvements. (#4419) Current Business Registration Certificate: No Financial Impact: $470,150 is available in account 129-160-7202-5504 for this project. $35,316 is reimbursable funding from Omnitrans per agreement 2016-60A. Motion: Adopt the Resolution. Synopsis of Previous Council Action: 03/21/16 Resolution No. 2016-060 was approved adopting Funding Agreement 2016- 60A with Omnitrans for the design and construction of 12 transit locations using Transportation Development Act (TDA) Article 3 funding. Background: On June 22nd , 2015 the Mayor and Common Council approved Resolution 2015-130 adopting the City's final budget document for Fiscal Year 2015/2016. The budget included CIP Project SS-B for "Accessibility Improvements at Various Locations" Project. The approved budget for the project was $503,876. As part of the City's ongoing ADA accessibility improvements, this project entails the reconstruction of damaged sidewalks, drive approaches, wheelchair ramps, x-gutters, installation of hand railing etc. at locations in the downtown area. The project also includes access improvements to 12 various transit stop locations which will be constructed using reimbursable TDA Article 3 funding from Omnitrans. The Project was advertised for public bidding on February 9th, 2016 in the San Bernardino County Sun Newspaper, F. W. Dodge, Construction Bid Board, High Desert Plan Room, San Diego Daily Transcript, Sub-Hub Online Plan Room, Reed Construction Data, Bid America Online, Construction Bid Source, Bid Ocean, the City's web sites, and the San Bernardino Area Chamber of Commerce. Sealed bids were received and opened on March 29"d, 2016 and the results are Updated: 5/9/2016 by Georgeann "Gigi" Hanna C I Packet Pg.446 4419 tabulated below: Table 1: Name of Bidder City Amount of Basic Bid Martinez Concrete, Inc. Azusa, CA $ 423,604.92 IVL Contractors, Inc. Rialto, CA $ 443,230.75 Kalban Inc. Santa Clarita, CA $ 512,000.00 Beador Construction Co., Inc.. Corona, CA $ 541,660.00 EBS General Engineering, Inc. Corona, CA $ 645,841.75 Engineer's Estimate $ 440,396.00 Based on review of the sealed competitive bids received, staff has determined Martinez Concrete, Inc. of Azusa, CA. to be the lowest responsive and responsible bidder, with a bid in the amount of $423,604.92. Staff recommends that Martinez Concrete, Inc. be awarded the contract. The detailed estimated project costs are as follows: Table 2: Construction Cost (Basic Bid/Purchase Order) $ 423,604.92 Construction Contingency (Approx. 10% ❑) $ 42,395.08 Estimated Contract Project Cost $ 466,000.00 Administration, and Inspection (approx. 8% ❑) $ 37,000.00 Estimated Total Project Cost $ 503,000.00 Recommendation: Staff recommends that the Mayor and Common Council: 1. Award a construction contract for this work to Martinez Concrete Inc. 2. Authorize the City Manager to approve change orders not to exceed 10% of original bid amount. City Attorney Review: Yes Supporting Documents: Resolution ADA Project Award (DOC) Contract Agreement(PDF) Bid Opening Report for ADA Project SS-B (PDF) Bid Documents for ADA and Sidewalk Downtown Route 2015 - SS-B - 13036 (PDF) Plan 13036 including Bus Locations SS-B (PDF) Updated: 5/9/2016 by Georgeann "Gigi" Hanna C Packet Pg.447 5.M.a RESOLUTION NO. 2 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AWARDING A CONTRACT IN THE AMOUNT OF $423,604.92 TO 3 MARTINEZ CONCRETE, INC., PER PLAN NO. 13036 (SS-B) FOR CONSTRUCTION 4 OF ADA ACCESS RAMP& SIDEWALK IMPROVEMENTS. 5 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: 6 7 SECTION 1. Martinez Concrete,Inc., 920 W. Foothill Blvd Azusa, California 91702 is U 8 the lowest responsive responsible bidder for the Construction of ADA Ramp& Sidewalk o a. 9 Improvements,Downtown Route(SS-B) 2015,per Plan No. 13036 (SS-B). A contract is Q 10 0 awarded to said bidder in a total amount of$423,604.92 with a contingency amount of -0 11 3 12 $42,395.08 but such contract shall be effective only upon being fully executed by both parties. a am 13 All other bids, therefore, are hereby rejected. The City Manager is hereby authorized and 14 directed to execute said contract on behalf of the City. The City Manager is hereby authorized 15 and directed to execute said contingency not to exceed$42,395.08 on behalf of the City. A copy a 16 CL 17 of the contract is on file in the office of the City Clerk and incorporated herein by reference as o 18 though fully set forth at length. o 19 SECTION 2. This contract and any amendment or modifications thereto shall not take CD 20 effect or become operative until fully signed and executed by the parties and no party shall be 21 E obligated hereunder until the time of such full execution. No oral agreements, amendments, 22 23 modifications or waivers are intended or authorized and shall not be implied from any act or 24 course of conduct of any party. 25 SECTION 3. The authorization to execute this contract is rescinded if the parties to the 26 contract fail to execute it and return the fully executed contract to the Office of the City Clerk 27 28 within sixty(60) days of passage of this Resolution. 1 Packet Pg. 448 5.M.a 1 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AWARDING A CONTRACT IN THE AMOUNT OF $423,604.92 TO 2 MARTINEZ CONCRETE, INC., PER PLAN NO. 13036 (SS-B) FOR CONSTRUCTION 3 OF ADA ACCESS RAMP& SIDEWALK IMPROVEMENTS. 4 I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor and 5 Common Council of the City of San Bernardino at a meeting thereof, held on the 6 day of , 2016,by the following vote, to wit: 7 w 8 Council Members: AYES NAYS ABSTAIN ABSENT 0 L 9 MARQUEZ q 0 Q 10 BARRIOS o E L 11 VALDIVIA a 12 rn SHORETT 13 14 NICKEL 3 Q 15 RICHARD a� 16 MULVIHILL aL Q 17 Q c 18 Georgeann Hanna, City Clerk 0 r 19 0 The foregoing Resolution is hereby approved this day of , 2016. 20 21 E 22 R. Carey Davis, Mayor Y City of San Bernardino a 23 Approved as to form: Gary D. Saenz, City Attorney 24 25 By: 26 27 28 2 Packet Pg.449 AGREEMENT CITY OF SAN BERNARDINO THIS AGREEMENT is made and concluded this day of , 20_, between the City of San Bernardino(owner and hereinafter"CITY"),and (hereinafter "CONTRACTOR"). 1. For and in consideration of the payments and agreements hereinafter mentioned,to be made and performed by the CITY, and under the conditions expressed in the bond as deposited with the CITY, receipt of which is hereby acknowledged,the CONTRACTOR agrees with the CITY, at the CONTRACTOR's own proper cost and expense in the Special Provisions to be furnished by the CITY, to furnish all materials, tools and equipment and perform all the work necessary to complete in good workmanlike and substantial manner the d 0 a. CONSTRUCTION OF ADA ACCESS RAMP & SIDEWALK a IMPROVEMENTS, DOWNTOWN ROUTE o ( SS-13 ) 2015 3 Q in strict conformity with Plans and Special Provisions No. 13036, and also in accordance with Standard Specifications for Public Works Construction, 2015 Edition, on file in the Office of the City Engineer, Public Works Department,City of San Bernardino,which said Plans and Special Provisions and Standard Specifications E are hereby especially referred to and by such reference made a part hereof. L 2. CONTRACTOR agrees to receive and accept the prices as set forth in the Bid Schedule as full a compensation for furnishing all materials and doing all the work contemplated and embraced in this agreement; L also for all loss or damage arising out of the nature of the work aforesaid or from any unforeseen difficulties or o obstructions which may arise or be encountered in the prosecution of the work and for all risks of every U description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work,and for well and faithfully completing the work and the whole thereof,in the manner and E according to the Plans and Special Provisions,and requirements of the Engineer under them. Q 3. The CONTRACTOR herein covenants by and for himself or herself, his or her heirs, executors, administrators,and assigns, and all persons claiming under or through them,that there shall be no discrimination against or segregation of, any person or group of persons on the basis of race, color,national origin,religion,sex, marital status, or ancestry in the performance of this contract, nor shall the CONTRACTOR or any person claiming under or through him or her, establish or permit any such practice or practices of discrimination or segregation with reference to the selection of subcontractors, vendees, or employees in the performance of this contract. Failure by the CONTRACTOR to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy, as recipient deems appropriate. Packet Pg..450 AGREEMENT: CONSTRUCTION OF ADA ACCESS RAMP & SIDEWALK IMPROVEMENTS,DOWNTOWN ROUTE ( SS-B ) 2015 4. CITY hereby promises and agrees with the said CONTRACTOR to employ, and does hereby employ the said CONTRACTOR to provide the materials and to do the work according to the terms and conditions herein contained and referred to, for the prices aforesaid, and hereby contracts to pay the same at the time, in the manner, and upon the conditions above set forth; and the same parties for themselves, their heirs, executors, administrators,and assigns,do hereby agree to the full performance of the covenants herein contained. 5. It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and the bid of said CONTRACTOR,then this instrument shall control and nothing herein shall be considered as an acceptance of said terms of said bid conflicting herewith. IN WITNESS WHEREOF, the parties of these presents have executed this contract in four (4) counterparts, each of which shall be deemed an original in the year and day first above mentioned. 'o L a Q CONTRACTOR CITY OF SAN BERNARDINO ° a NAME OF FIRM: BY: a MARK SCOTT City manager BY: c a� E d a� TITLE: ATTEST: a MAILING ADDRESS: r 0 U GEORGEANN HANNA City Clerk E 0 a PHONE NO.:L_) APPROVED AS TO FORM: ATTEST: GARY D. SAENZ, City Attorney Secretary NOTE: Secretary of the Owner should attest. If Contractor is a corporation,Secretary should attest. Packet Pg.451 Z5ti 'Bd IOMOBd I A � t t N 3 cd H N V cn Q w � H o w u pq a z , 0 Q z p W zz v pq zap T z � Ocn o ` o co nAua M I W V nc\J M 0 O D � a > CD U p., p cry O o 0 pq oa � a N azpw00 w z w o � U FL; � w wz w w *4 1§' � a O Vw'S pq g 9 9 19 CL ti 0 °? ID CD 8 8 8 8 8 8 8 8 02 cn (n 00 F3 9 of R UF, 6 Re F 0 U 0 w 03 0 A z 09 X R D 4z a z w 6 H LU C3 N(it 0 IL CL w leg ON g E 2 (a ui 0 z z 0 0 CL ZO or 10 CL m¢R Ir Lj z 3 c z pi 0 a u 0 18 900 K � 0 ; 'o 0 UL) 0 L) z 2 0 IL 2 R M 0 w z z Sz IJ u Z 44 w 2 w � V �5 55 1 LU 2 1 Im ? - 0 z U,. z 9 Z9 IL 0 w 8 w 8 a: 8 8) ?.-M a -0 .0 IL D- 0 L) r.) A z z� I a r N M Y w b h m— -1;!1!gI imam, ZZ 0. z ci 0 0 0 W CL ID s g 0 Q2 3o v Sj �2 IL CL 4 g, 58, 03 s N 9 co .. LX > N w !b 15 5 LLb Im 0. IL CL ul uj 0 z LU :3 I y w 0 :3 0 E2 0 5-3 M IL F F y Q < F am U L)V) W z iL Z 0 z 0 U) 0 Im Li z 0 2 u 2� - Ci so'.. E:,K:,-.q,.�� U)���2 U, 0 W IL 0 °uf so w .......... F5.M.d BID FORM TO THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO The undersigned declares that he has carefully examined the work site, the notice inviting sealed bids, the bid instructions, the plans, and the special provisions, and hereby proposes to furnish all materials, equipment,tools, labor, and incidentals necessary to complete the 0- a 0 CONSTRUCTION OF ADA ACCESS RAMP&SIDEWALK a IMPROVEMENTS, DOWNTOWN ROUTE(SS-B) 2015 in strict conformity with the Standard Specifications for Public Works Construction 2015 Edition,the Bid a and Contract Documents, and Plans and Special Provisions No. 13036, of the Public Works a) Department for the City of San Bernardino. Undersigned proposes and agrees if this bid is accepted, that he will contract with the City of San Bernardino, in the form of the copy of the contract annexed hereto, to provide all necessary machinery, tools, apparatus and other means of maintenance, and to o do all the work and furnish all the materials specified in the contract, in the manner and time therein ;' prescribed, and that he will take in full payment therefor the amounts contained in the attached bid m schedule. Ch The undersigned agrees to commence the work described herein within 10 working days from the r date of the "Notice to Proceed", and to complete the work within 60 working days from the date of N said notice. 0 The undersigned further agrees that in case of default in executing the contract, or furnishing necessary bonds, all within the specified time, the proceeds of the Bidder's; Guaranty accompanying o this bid shall be paid to the City of San Bernardino as liquidated damages. 3 O Signature of Bidder: Date: _ It 4 U) _ Printed Name: ROSEeM MA(k-T►jf z- Title: :5E,-r. ,rnrgs. a 0 a BIDDER' INITIALED ACKNOWLEDGEMENT OF ADDEN UMS: y w E ADDENDUM NO. 1 DATE: 3 6 _ 0 0 ADDENDUM NO. 2 2M DATE: '3/A Z". m ADDENDUM NO. 3 DATE: s U fC s-+ a B-1 Packet Pg. 455 BID SCHEDULE CONSTRUCTION OF ADA ACCESS RAMP&SIDEWALK IMPROVEMENTS, DOWNTOWN ROUTE PLANS AND SPECIAL PROVISIONS NO. 13036 CIP No. (SS-B)2015 Name of Bidder: t�AteN Q2 r G".,..s ITEM DESCRIPTION OF ITEMS UNIT ESTIMATED UNIT TOTAL($) NO. QUANTITY PRICE $ 1 MOBILIZATION LS 1 28, o0o 28,000 o- 2 TRAFFIC CONTROL LS 1 i' Q -Lao v- 3 CLEARING AND GRUBBING UNCLASSIFIED LS 1 -°�, EXCAVATION&UNCLASSIFIED FILL 6`I, Loa 3 a 4 CONSTRUCT PCC CURB RAMP INCLUDING EA 10 RETAINING CURB PER SPPWC 111-5 7's'00 Soo � 000 � 5 MODIFY EXIST.PCC CURB RAMP PER SPPWC 111- m 5 INCLUDING GRINDING LIP/INSTALL EA 9 O6 0 DETECTABLE WARNING PER PLAN � tO° r 6 m RELOCATE SIGN PER CITY STD 504 EA 2 c{S o q oo 7 CONSTRUCT PCC COMMERCIAL DRIVEWAY APPROACH TYPE I PER CITY STD 204 AND THE SF 5,500 SPECIAL PROVISIONS d 8 CONSTRUCT PCC COMMERCIAL DRIVEWAY BY- 0 PASS PER CITY STD 204 TYPE I AND THE SPECIAL SF 266 6 70 = o PROVISIONS 3 9 CONSTRUCT PCC SIDEWALK PER CITY STD 202 SF 9,630 y �s so AND THE SPECIAL PROVISIONS 3q,964 o 10 CONSTRUCT PCC SIDEWALK BY-PASS INCLUDING a RETAINING CURB AS REQUIRED PER CITY STD 202 SF 46 AND THE SPECIAL PROVISIONS aD 11 CONSTRUCT PCC CURB TYPE"A"PER CITY STD LF 53 �9 4r ?` co 200 AND THE SPECIAL PROVISIONS I,n5"7 .- c� 12 CONSTRUCT PCC CURB&GUTTER TYPE"B"PER o LF 62 CITY STD 200 AND THE SPECIAL PROVISIONS Z2 '- 136,. al 13 CONSTRUCT PCC CROSS GUTTER/SPANDREL PER es , CITY STD 201 AND THE SPECIAL PROVISIONS SF 700 Io c 14 GRIND PCC SIDEWALK SURFACES INACCORDANCE WITH CALDAG FIG CD-88 LF 273 11 H. bM 15 0 ADJUSTMENT CITY PB/COVERS TO GRADE EA 28 y 20 1 k, 760 v m 16 INSTALL METAL HAND RAILING,TYPE"A"PER SPPWC STD PLAN 606-4 LF 16 t 8o 2, $8o s 17 TREE REMOVAL EA 3 10 boo 44, 800 w a B-2 ADDENDUM NO.TWO PLANS AND SPECIAL PR UNIONS hl' '1� Packet Pg. 456 BID SCHEDULE CONSTRUCTION OF ADA ACCESS RAMP&SIDEWALK IMPROVEMENTS, DOWNTOWN ROUTE PLANS AND SPECIAL PROVISIONS NO.13036 CIP No. (SS-B)2015 Name of Bidder: MArt Z f Q Sf�6T= U ITEM DESCRIPTION UNIT ESTIMATED UNIT PRICE TOTAL($) o NO. QUANTITY $ a 18 RESET TREE FRAME AND GRATING EA 8 1 {,206 Q 19 STREET STRUCTURAL REPAIR per CITY STD 310 SF 500 5.— H,i25 0 20 ASPHALT CONCRETE TN 47 21 CRUSHED AGGREGATE BASE TN 39 RESTORATION LANDSCAPE, IRRIGATION and 22 LANDSCAPE CURB LS 1 '-1,200 `1,Zoo M 0 M r 23 BALLARD REMOVAL EA 4 2 so I,000 00 ch 24 SURVEYING per the SPECIAL PROVISIONS LS 1 4,ior> I,, Sao N CONSTRUCT AC COMMERCIAL DRIVEWAY BY- r 0 25 PASS PER CITY STD 204 TYPE I AND THE SPECIAL SF 520 -7 r 3, Y N PROVISIONS 3 26 CONSTRUCT AC SIDEWALK BY-PASS INCLUDING �0 RETAINING CURB AS REQUIRED PER CITY STD 202 SF 138 so_ AND THE SPECIAL PROVISIONS I 03 0 27 CONSTRUCT PCC LOCAL DEPRESSION PER CITY EA 1 boo boo 0 STD 407 AND THE SPECIAL PROVISIONS o 28 CONSTRUCT PCC BUS PAD SECTION PER SPPWC $F 244 z 3 79 3 PLAN 131-2 AND THE SPECIAL PROVISIONS 9 c co Q a 0 w c m E 0 0 -a TOTAL BID SCHEDULE $ °£ (W6r m ' j E U a S-3a ADDENDUM NO.TWO PLANS AND SPECIAL PROVISIONS Wn 1301 Packet Pg.457 ADDITIVE BID SCHEDULE CONSTRUCTION OF ADA ACCESS RAMP&SIDEWALK IMPROVEMENTS, DOWNTOWN ROUTE PLANS AND SPECIAL PROVISIONS NO. 13036 CIP No. (SS-B)2015 Name of Bidder, _ r''ggjZ cL czr4cger- U ITEM DESCRIPTION OF ITEMS UNIT ESTIMATED UNIT TOTAL($) o NO. QUANTITY PRICES a 1 MOBILIZATION LS 1 <000 G,oao a 2 TRAFFIC CONTROL LS 1 "- 7,Soo 2,Soo 0 3 CLEARING AND GRUBBING UNCLASSIFIED LS 1 3 EXCAVATION& UNCLASSIFIED FILL -z 4,000 Z.v,000 Q 4 CONSTRUCT PCC CURB RAMP INCLUDING EA 7 RETAINING CURB PER SPPWC 111-5 2,700 IS c�po 5 Cl CONSTRUCT PCC SIDEWALK PER CITY STD 202, �? SF 852 THE PLANS AND THE SPECIAL PROVISIONS - m 6 1 CONSTRUCT PCC PEDESTRIAN PAD PER CITY STD qv g, N 202,THE PLANS AND THE SPECIAL PROVISIONS SF 1467 S' 9,`ss = LO T- 7 CONSTRUCT PCC SIDEWALK PER CITY STD 202, yo cm THE PLANS AND THE SPECIAL PROVISIONS SF 1814 S._ 10, 8 CONSTRUCT PCC CROSS GUTTER/SPANDREL PER SF 130 � CITY STD 201 AND THE SPECIAL PROVISIONS 17 z"2-10 3 0 9 CONSTRUCT PCC 6"CURB TYPE"A"PER CITY STD c 200,THE PLANS AND THE SPECIAL PROVISIONS LF 48 36 i,7zg o 10 ° CONSTRUCT PCC CURB TYPE"A"PER CITY STD 200,THE PLANS AND THE SPECIAL PROVISIONS LF Zr' d 11 CONSTRUCT PCC CURB&GUTTER TYPE"B"PER N CITY STD 200,THE PLANS AND THE SPECIAL LF 85 31 PROVISIONS 12 CONSTRUCT PCC CURB&26"GUTTER TYPE"B" o PER CITY STD 200,THE PLANS AND THE SPECIAL LF 5 PROVISIONS ,o 13 CONSTRUCT PCC CURB&36"CUTTER TYPE"B" PER CITY STD 200,THE PLANS AND THE SPECIAL LF 187 2S y.., / (D PROVISIONS ' " �� ' E 14 CONSTRUCT PCC CURB&60"GUTTER TYPE"B" c PER CITY STD 200 ,THE PLANS AND THE SPECIAL LF 10 S ?So v PROVISIONS 15 CONSTRUCT PCC DRIVEWAY PER CITY STD 203, cc 6o m THE PLANS AND THE SPECIAL PROVISIONS SF 381 E 16 REMOVE AND CONSTRUCT 3"THICK ASPHALT s OVER COMPACTED NATIVE PER THE PLANS AND SF 150 67 1, SPECIAL PROVISIONS Q B-3b ADDENDUM NO.TWO PLANS AND SPECIAL.PRO Packet Pg.458 5.M.d ADDITIVE BID SCHEDULE CONSTRUCTION OF ADA ACCESS RAMP&SIDEWALK IMPROVEMENTS, DOWNTOWN ROUTE PLANS AND SPECIAL PROVISIONS NO. 13036 CIP No. (SS-B)2015 Name of Bidder: MAR,,s2- �JNLRFi' T U ITEM DESCRIPTION UNIT ESTIMATED UNIT PRICE TOTAL($) a NO. QUANTITY $ a REMOVE AND CONSTRUCT 4"THICK ASPHALT a 17 OVER 6"AGGREGATE BASE PER THE PLANS AND SF 451 1-7 zs ,/-, ,r 0 SPECIAL PROVISIONS a REMOVE AND CONSTRUCT 6"THICK ASPHALT 18 OVER 8"AGGREGATE BASE PER THE PLANS AND SF 350 -22. '1)'7oo a SPECIAL PROVISIONS REMOVE AND CONSTRUCT 6"THICK ASPHALT r' 19 OVER 12"AGGREGATE BASE PER THE PLANS AND SF 1120 Z 4 ZS Z-1 6a SPECIAL PROVISIONS (D 20 RESET EXISTING BUS EQUIPMENT EA 6 323 1,9So M LO m TOTAL BID"ADDITIVE"SCHEDULE J.`� llel4�1 C14 B 3 O c 3 0 c 3 O 0 Y_ fC d .a co M C fC a a L O c E U O O m c d E s U l4 r a B-3c ADDENDUM NO.TWO PLANS AND SPECIAL PR QVISIONS NO Packet Pg.459 5.M.d SUMMARY OF BID SCHEDULES CONSTRUCTION OF ADA ACCESS RAMP&SIDEWALK IMPROVEMENTS, DOWNTOWN ROUTE PLANS AND SPECIAL PROVISIONS NO. 13036 CIP No. (SS-B)2015 , 0 L a. BIDDER: M Aar-CN E 2 Cor4cA a rE Q (Contractor Name) a 4- 0 TOTAL BID SCHEDULE $ - (FIGURES) q r a TOTAL ADDITIVE BID SCHEDULE $ .{ "(FIGURES) M kOi M m GRAND TOTAL BID*S - (FIGURES) r o w 3 O *Grand Total Bid is equal to the total of Bid Schedule,plus Additive Bid Schedule, 3 O c 3 BID NOTES: o Y_ tC The unit price must be shown in figures, for all work items. All blank spaces appearing above must be filled CD in. In case of discrepancy in Bid Amounts, "UNIT" prices shall govern over extended "TOTAL" N amounts. -a c CITY reserves the right to award a Contract to the lowest responsible bidder for the GRAND TOTAL BID o (the combined total of Bid Schedule, plus Additive Bid Schedule). THE CITY ALSO RESERVES THE a RIGHT TO AWARD BID SCHEDULE WITHOUT ADDITIVE BID SCHEDULE. Submitted bids - shall include complete bid amounts for each bid item of each Bid Schedule to be considered valid bids. d E The total bid price for the entire Contract work shall include the cost of labor, materials, equipment, parts, o implements,supplies, and all applicable sales taxes and fees necessary to complete the Project,as based on the City Engineer's estimate of quantities of work. m The total price shall be extended for each item of work and the total of all items inserted in the space provided. Bidders shall complete and submit entire BID DOCUMENTS section as their Bid to the CITY. Failure to do so will result in the Bid being non-responsive. y a B-3d ADDENDUM NO.TWO PLANS AND SPECIAL PRQUISIONS NO 1 026 Packet Pg. 460 5.M.d Any situation not specifically provided for will be determined at the discretion of the City of San Bernardino (CITY), and that discretion will be exercised in the manner deemed by the CITY to best protect the public interest in the prompt and economical completion of the work. The decision of the CITY respecting the amount of a Bid,or the existence or treatment of an irregularity in a Bid,shall be final. BIDDER declares that this Bid is based upon careful examination of the work site, Bid and Contract Documents. d 'o L Estimated quantities are for the purpose of comparison only, and payments will be made on a basis of actual a measurement of work completed except for Lump Sum(LS)and Final(F)pay quantities. 0 Codes: Units of Measurement: 0 3 (F) Final Pay Quantity EA Each a (S) Specialty Bid Item LS Lump Sum (D) Deletable Work Item SF Square Foot SY Square Yard M ELT Extra Long Ton M LF Linear Feet IN Ton 00 LO (D) Deletable work item; only to be incorporated in the work as provided via written direction from the N Engineer. w (S)Specialty Bid Item—are bid items that are considered part of the total base bid but are not considered part of the 0 Contractor's obligation to perform at least fifty percent(50%)of the work as specified in Section 2-3.2,"Additions 3 Responsibility,"of the Standard Specifications. o 3 (F)Final Pay Quantity-are bid items as described in Section 6-1.07 of these Special Provisions, o M 3 m a c c� Q 0 Q L O W N r C CD E V O O m C O E s Q B-3e ADDENDUM NO.TWO PLANS AND SPECIAL PR Ina Packet Pg.461 �•� BINDER'-1NF0 RMTlON Business Name: MaaT ,,, z tave4wre .0 Business Address: q zo w Foo�►a��c oc.�o a a 0 A7osA c a 0 L M 3 Phone Number. a CD T Fax Number: c 1 3 f y -974S- M E-mail: M T Contractor's License Number: 3 gi 4-r i CO Business Entity: (for example,corporation, N partnership, sole proprietorship) O DBE Certification No. tr c if applicable) 0 w 3 0 0 3 a� C c� Q 0 d L 0 LO c a� E 0 0 0 m c a� E s ca Q B-4 Packet Pg.462 5.M.d SUBCONTRACTOR DESIGNATION CONSTRUCTION OF ADA ACCESS RAMP&SIDEWALK IMPROVEMENTS, DOWNTOWN ROUTE PLANS AND SPECIAL PROVISIONS NO.13036 CIP No. (SS-B)2015 Name of Bidder: N oaTzNr 2 oc:!c ezf Y U In accordance with Public Contract Code Sections 4100-4114, the prime contractor shall designate the o subcontractors who will perform work In excess of one-half of 1 percent of the prime Contractor's total bid or °- $10,000,whichever is greater, o a Subcontractors shall be properly licensed for the type of work listed. Only one subcontractor shall be listed for 0 each Item of work. -P 3 In accordance with Public Contract Code Section 4106, if a prime contractor fails to specify a subcontractor or if a a prime contractor specifies more than one subcontractor for the same portion of work, the prime contractor shall perform that portion himself or herself. If after award of contract, the prime contractor subcontracts, except as provided for in Sections 4107 or 4109, any such portion of the work, the prime contractor shall be subject to the penalties named In Section 4111. M 0 M r Subcontractor's Subcontractor's License Number Work Item Subcontract °0 Business Name Business Address and Class Amount $$ oorJ�+`S N,u.�owoet to Feri Ll 2,98o N O L.A F.APr 57A0. LANnsGcaPfi WC e4-&Jnt 0 1•u�c Iry �2�i?74 lugs ti, 800 J)OA Y_ fII CAic L.Ario 3 suavev S�nvsy �,6 OYtAq6e 1,f00 Cl) c a 0 a 0 c v � 0 0 m u c a� E v 2 a B-5 Packet Pg. 463 S.M.d WORKERS' COMPENSATION INSURANCE CERTIFICATION 1 am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation.or to undertake self-insurance in accordance with a` provisions of that code, and I will comply with such provisions before commencing the performance of Q the work of this contract, o a 0 L 3 d Signature of Bidder: _ Date: 3 t M O M Printed Name: RozegT MYAIS r"Sz.. Title: Ice- /rRfas_ 00 U) u� 0 0 Business Name: MARL-T ucz Zw4c grrF_ N d w 0 3 0 c 3 O 0 w c Q 0 Q L 4- N C E U O m C d E s Q B-6 Packet Pg.464 5.M.d (This affidavit shall be executed by all bidders at the time of bid submittal. Failure to execute the affidavit on this page will result in rejection of bid.) NON-COLLUSION AFFIDAVIT To the Department of Public Works,City of San Bernardino,State of California: The undersigned in submitting a bid for performing the following work by contract, being duly sworn, deposes and says: a Q 0 That he or she is of the party making the foregoing bid,that the bid is not made in the interest of, or on o behalf of,any undisclosed person,partnership,company, association,organization, or corporation;that the o bid is genuine and not collusive or sham;that the bidder has not directly or indirectly induced or solicited 3 any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, Q connived,or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; communication,or conference with anyone to fix any overhead,profit, or cost element of the bid IT price, or of that of any other bidder, or to secure any advantage against the public body awarding the v contract on anyone interested in the proposed contract; or take any action in restraint of free competitive o bidding in connection with such contract;that all statements contained in the bid are true;and further,that the bidder has not,directly or indirectly,submitted his or her bid price or any breakdown thereof, or data m relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization,bid depository,or to any member or agent thereof to effectuate a collusive or sham bid. LO T O N Firm Name o 0 Signature of Bidder 0 Rca4FP-T- Mwr�Yr,.rez 5RC. 17RMJ. Printed Name and Title 3 a� c W c tr'��n . cc Business Address o a L 0 P'Zu3e@ �A Place of Residence w E Subscribed and sworn to(or affirmed)before me this day of ,20 the above proved to me on the basis of satisfactory evidence to be the person who appeared before me. 0 Signed m Notary Public in and for the County of E State of California. My Commission expires on Q Year B-7 Packet Pg.465 California Acknowledgment Form S.Md A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached,and not the truthfulness,accurac ,or validity of that document. State of California County of Los Angeles } SS. d 0 ti On March 7 2016 before me, Pamela Jo Hunt Cortez, Notary Public o (here insert name and title ot the officer) Q personally appeared Robert Martinez o who proved to me on the basis of satisfactory evidence to be the person(l,whose name( is/MA subscribed to the within instrument and acknowledged to me that he/ 1(W executed the same in his/D&A)W au- a thorized capacityW and that by hisll6T+ UW signaturepWon the instrument the person(Q, or the entity upon behalf of which the person(4 acted, executed the instrument. v I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing c paragraph is true and correct. m Seal IT ESS my hand and official seal. * O'a MM CQIIT1sZ to z Corm.$2095689 tn N NOTARY PUBLIC-CALtFOAMA 4t d Los Atoms Cora Signature o otary � tit Cowl Esp.JAN.A 20!!! 0 c 3 0 3 0 0 Y_ Ca Optional Information To help prevent fraud,it is recommended that you provide information about the attached document below. 0 ***This is not required under California State notary public law.*** O Document Title: Non Collusion Affidavit #of Pages: Notes a `0 City of San B rnardino-ADA ArrPre Ramp R Sidawalk " N C d E U O a m a.: c m E a Packet Pg.466 5.M.d l3ID I3OND FQRM Bond No.: CDGB104597 tote undersigned, Martinez Concrete Inc. as Principal,and ••••••• State National Insurance Company,Inc.Administered By:Contractor Managing General Insurance Agency,Inc, as SuretY, "to hereby and fn*j bewt+i wtto the_ f'tv..of Sat► Statd of CACW�W, hereinafter referred to as 110migee, in the � Mal awn of tan a pen Perserrt ) of fire fetal aMOM4.of the bid of the PriNeipsl submitted to the Obligee for the work 0- deaerihW below, far #0 PWment of which swrr we MWAY OrAy sad asverally bind ourselves, our Imirs, executors ¢ admisiorUston,aucaesaon alit awipa. o 4- THE CONDITION OF T1*S OK"TIM IS SUCH, THAT: a L WHEREAS, the Prkelpal Iran swbtrtitted to Obligee,a certain Did,gtit" ed hereto aed hemby made a part hereof to ender ¢ into a eontraat in writing,for the Construction of ACA Access Ramp & S w&& Improvements, Downtown Route (SS- 13) 2015 }glans and Sjmc3ad Provisions No. 13036 (Copy here i�lt s3rrrct liN�desc ' co riskn of hwhodkatl lecdoem ar it It ev,at theProporelt) M P for whirl bids are to be opend on March 22, 2016 m (kuert date of qxartrrg) NOW, TIEREFORF, P a. If staid Bid shall be rsjected,or in the altem ilte, N b. If said laid shall be accepted and the Princi;aal AM,eaawuw a owiirat Q in the Form of contract attached hereto(properly compered in secalrrce with said DW) and shall furnish a bond for his faithful performance of acid vsrrtract, 3 and shall in all other respects perform the agreement craNad by Art ascepo see of a*Sy, o c then this obligation shall be void;ot ins,the MGM ahwil rsNliaie in forwr acrd 0 ie�iat;k ►wedarNared aNd o agreed that the liability of the Surety for any wA all olaiere hanwrrdsr shall(, ill m sysAt,ey[Qpd&g p aeraMlrt a{ , 0 obligation as heroin#* 3 a� The Surety,for value received,hereby Stipulates asst!meet that the obligations of said Surety and its bowl#411 be is No N way impaired or affected by any extension of the flute within which be Oblipe may such Foal;and saw Swroy- -a hereby waive notice of any such extension. ¢ Sislrsd, this 21 St duty of March , 2tI 16 a L IN WITHMS Wld-UOF, Use Pr' o meiPal earl llre S Urays lrrtrouMte ast Mrait holds allld awls.alld ttgrdt of 0rarr corpotallilm Wrote coved their corporMe scab to be Immo sllirtiwl and that pttl;saprla to be a*"by offers prvpar oftsc%%, a the day add year first mentioned, State National Insurance Company,Inc.Administered E By: U M Concrete, Inc. ,) Contractor Managing General Insurance Agency, Inc.' P►spa _­(SEAL) 0 m Fir sknamm SWrr .- E E ��i✓ " Gr�i Stephanie Hope Shear,Attorney-in-Fact «9 PTi;'#Etd�]t�Nlrre Arrrii �i B Pri(Wd Now PW 7 ¢ '20335 Ventura Blvd.,Suite 426 Woodland Hills CA 91364 NOTE Nearizeflon of Princitrat and Surety signatures and Power of Attorney of the Surety shall accompany obis form, 8-8 Packet Pg.467 5.M.d Bond No:CDGB104597 State National Insurance Company,Inc.Administered by: Premium: $0.00 CONTRACTOR MANAGING GENERAL INS_U !CE AGENCY,INC POWER OF ATTORNEY KNOW BY ALL THESE PRESENTS That STATE NATIONAL INSURANCE COMPANY, INC. a corporation organized and existing under the laws of the State of Texas,having its principal office in Bedford,Texas does hereby constitute and appoint Ste hanie Ko a Shear � (individually,jointly,or seteralty) O CL its true and lawful agent and attorneys)-in-fact to execute,seal and deliver for and on its behalf as surety,any and all bonds in an amount not to exceed: D ree Nliliion and t10/t00 D Ilara 3 000 Q 0 and undertakings,contracts of indemnity and other writings obligatory in the nature thereof,which are or may be allowed,required or permitted by -0 law,statute,rule,regulation,contract or otherwise. Q The acknowledgement and execution of bond by said Attorney-in-Fact,shell be as binding upon STATE NATIONAL INSURANCE COMPANY, INC.as fully and amply,to all intents and purposes,as if the same had been duly executed and acknowledged by its regularly elected officers at the principal office. RESOLVED that the signature and date of any authorized officer and the seal of the Company may be affixed by facsimile or other electronic image M to any Power of Attorney or certification thereof authorizing the execution and delivery of any bond,undertaking,contracts of indemnity and other CD writings obligatory in the nature thereof, and such signature, date,and seal when so used shall have the same force and effect as though manually r affixed. m r This Power of Attorney shall remain in full force and effect until revoked by STATE NATIONAL INSURANCE COMPANY,INC.in a signed N writing delivered to the foregoingAttomey-in-Fact. to IN WITNESS WHEREOF,STATE NATIONAL INSURANCE COMPANY,INC.has N caused this instrument to be signed and its corporate seal to be affared by its authorized m officer,this 7th day of August,2015, O STATE NATIONAL INSURANCE COMPANY,INC. 3 rl cr-eS�� 0 Terry L.Ledbetter, rear tat Trace tier,Secretary p STATE OF TEXAS County of Tarrant � 3 On this 7th day of August,2015 before me cam the individuals who executed the preceding instrument,to me personally known,&W being by me d rn duly sworn,said that each ofthe herein described and authorized officer of STATE NATIONAL INSURANCE COMPANY,INC.,that the seal affixed � to said instrument is the Corporate Seal of said Company, that the Corporate Seal and each signature were duly affixed by order of the Board of c Directors of said Company, Q IN WITNESS WHEREOF,I have hereunto set my hand at Bedford,Texas the day and year above written. Q 0 4- DEANA HOWELL O Notary Public,State of Texas �IrVIAJA-- E [Notary Stampl `\: My Commission Expires Signature January 07, 2018 ofNotary U nu O I,the undersigned,Secret m g cry of STATE NATIONAL INSURANCE COMPANY,INC.,do hereby certify that the above and foregaing is a true and correct copy of a Power of Attorney executed by STATE NATIONAL INSURANCE COMPANY,INC.,whia'r is still in full fbrco acid effect. 0 mlirch w IN WITNESS WHEREOF,I have thereunto systematically set my hand and attested the seal of said Company this 21$t day of_ 2016 0 rtt a Trace Ledbetter,Secretary Packet Pg. 468 CAiai OM"AI L-- M A"1111111MWEDGMENT CIVIL CODE$1189 0 A notary Wblic or other officer completing this certificate verifies only the identity of the individual who signed the a. doewmemt to which this certificate is attached,and not the truthfulness,acowracy,or validity of that document. `t 0 Q State of California ) o County of LOS ANGELES ) 3 On MAR 2 1 2016 Ise me, SHIRLEY GK;GLES, NOTARY PUBLIC a Da" Hem Insert Name and Title of the Officer a' personally appeared STMM4 IE HOPE SKEAR v Name(s)of Signer(s) M 0 M i r who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are m subscribed to the within instrument and acknowledged to me that he/she/they executed the same in N his/her/their authorized capacity(ies),and that by his/her/their signature(s)on the instrument the person(s), N or the entity upon behalf of which the person(s)acted, executed the instrument. ,n 1 certify under PENALTY OF PERJURY under the laws ° N of the State of California that the foregoing paragraph a; is true and correct. 0 WITNES my hand and offici eal. SHIRLEY GIGGLES ' p Commission# 1987675 x Signatu a ze - Notary Public-California z 3 Z '> M~ Los Angeles County -A Signa of ublic o FA Comm.Expires Sep 7,2016 x 3 m in Place Notary Sea/,Above c Though this section is optional, completing this information can deter alfwation of the document or Q 0 Moudutont reattachment of this forr»to an unintended document. Q Description of Mead Daermewo Title or Type of Document: Document date: Number of Pelges: qq,,,,,, &gnsr(s) Other Than Named Above: CD CaP �byUpw" U Signer's Name: Signer's Name: p° ❑Corporate Officer — Title(s): El Corporate Officer — Title(s): v ❑Partner — ❑Limited ❑General ❑Partner — ❑Limited ❑General m ❑ Individual ❑Attorney in Fact ❑Individual ❑Attorney in Fact c ❑Trustee ❑Guardian or Conservator ❑Trustee ❑Guardian or Conservator s E 11 Other: ❑ Other Signer is Representing: Signer Is Representing: Y a 02014 National Notary AnxiaAon•www-NatienMetry.org- 1-OW-US NOTARY(1-N0-976-6827) Item 05907 Packet Pg. 469 California Acknowledgment Form A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached,and not the truthfulness accuracy,or validity of that document. State of California SS. County of Los Angeles w a� 0 L a On March 22..2016 before me, Pamela Jo Hunt Cortez, Notary Public a sere insert name and title f the o cer) 0 personally appeared Robert Martinez a 0 who proved to me on the basis of saitissfactery evidence to be the person(*whose name(.4 is/#*subscribed to the within instrument and acknow kKiged to me that helOMUW t executed the same in his/VAKMM au- a thorized capacityW and OW by his lW signatur*Wn the instrument the personal, or the entity upon behalf of which the person(4 acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. M Seal m W TNESS my hand and offic'al se 1. �.....r..W..�..�. Mf4A JO HUNT C07U r �, NOTAN flU�ltC*GNt�M4tMlIR� N JUMitlt ceNwn — Signature otgotary w cwa tn.JAN 2�t# o _ 3 0 r 3 O 0 Y_ fC 3 00mial I>r1f6mbon To help prevent fraud,it is recommended that you provide information about the attached document below. Cl) '*'This is not required under California State notary public law.*** tB Document Title: Bid Bond Notes #of Pages: a L 0 itv of San Mrnardinn-ronSIruction cif ADA Acress RaMla A ei walk Im rr2 nmements Domintnwn Rn!te,(SS_ N w _ d E V O m a-i C d E t t) _ rp a Packet Pg.470 CERTIFIED DBE DESIGNATION Name of Bidder: Ntacr �Nz cap U U The bidder shall use this form to designate certified DBE subcontractors that will be used on the a project. The bidder shalt submit with its bid copies of all quotes received from certified DBE Q subcontractors. o Q w O _ -0 L CO Subcontractor's Subcontractor's License Number Work item Subcontract Business Name Certified DBE ID No, and Class _ _ Amount $ a as M O f � i m N to r LO O N d 7 O C O Y U C fC Q Q L O N E U O O m C O E M U cv r .r a B-a Packet Pg.471 ' •` 5.M.d GOOD FAITH EFFORT DOCUMENTATION Name of Bidder: M gg, NQ2- tn..cRErE If a bidder does not meet the DBE participation goal, the bidder shall demonstrate that a good faith effort was made to meet the goal. Failure to meet the participation goal combined with a failure to demonstrate a good faith effort will result in rejection of the bid. o a a The bidder shall document its good faith effort by submitting this completed form and all suaporting documentation. a 0 1. Did the Bidder attend the Pre-Bid Meeting? yes no X _ a 2, List the work items that were offered to certified DBE subcontractors. The percentage of work offered should exceed the goal percentage. Work Item Offered Percentage of Total Bid o �,lE(yf2, � re2Vq Z`-1 r _ _ m 2. N 5�2vEy 3 � 3. r 1Jnw oaqr�- l ° N 4. a Trt rz Z o �. Total Percentage Offered —; 30 3 Should exceed 7.5 percent) o 3. Use the Caltrans DBE certification database (hftp://www.dot.ce.gov/hg/bep/find 0 o to identify subcontractors who are seeking work in the San Bernardino area that is similar to the work items listed above. At least ten days prior to the bid opening, solicit bids from the identified subcontractors. Solicitations should include a general description of the project, a specific description of the work that is offered, and information regarding how to obtain copies of the bid and contract documents. Submit copies of all solicitations with the bid (foxes or emails are acceptable). Include the DBE Firm ID Number on each solicitation,or Include o a separate listing of subcontractor names and DBE Firm ID numbers. a L 0 4- 4. At least four days prior to bid opening,follow up with identified subcontractors who have neither submitted a bid nor provided correspondence expressing a lack of intent to submit a bid. W Submit copies of all follow up correspondence(faxes or smalls are acceptable). 0 5. Provide copies of all correspondence received from certified DBE subcontractors. �o (include all bids received and correspondence expressing a lack of intent to submit a m bid). E 6. Provide a written explanation for all rejected bids received from DBE subcontractors. 7. Provide any additional Information demonstrating a good faith effort to most the DBE participation goals. B-10 Packet Pg.472 w 5.M.d EXPERIENCE STATEMENT Name of Bidder: Mwa,Ti4e 2 cor.,cp The bidder shall be thoroughly competent and capable of performing the Work set forth in the bid and contract documents. Provide complete information on similar projects completed in the last five years. U v O L a Project Title: Mw�NO + ta,�or .N Sw1moy. _ Q 0 Public Agency!Owner: CL-Ty of co,aoNA o L Work Performed by Bidder: pc-c. po io- aahovo,s , A c- PA-,hi c. d Contract Amount: 4 1570 ?2g Completion Date: I coM O Public Agency/Owner Contact Information: m Name: OAVLAy (.urae�As Title: PM Phone Number (�s► 73°I - �g61 Ni LO 0 Project Title: X 02 c ti P-xraayock c+ora tmA2ov v Y Public Agency/Owner: CXW of cycaess _ 3 Work Performed by Bidder: Ac. P4,�rN`y nemo Ac s f Pic Pain-. 0 O O co Contract Amount: 4 iaz ttlr Completion Date: szr 2ofs- v Public Agency/Owner Contact Information: _ Cz Name: rircv- t-AN&jcAt-Avm-z Title: p,,A Phone Number: (714 zzei.c,�Lq a - o a L 0 Project Title: Pzn rcr Lk,?rna coNcarz - _ v Public Agency I Owner: cwAaFcE t 3m&N-r V"Tor4 11s prrTnr« _ 0 Work Performed by Bidder: Rem-NdALS Pcc PovrL 'm v E Contract Amount: ZS134_'3zG Completion Date: pt,G 2o,r Public Agency/Owner Contact Information: a Name: Nrr-e Title: PM Phone Number (qo4)qgg-ssot B-11 Packet Pg. 473 313/2016 Pri nt S.M.d Subject: Weekly Bid Flash DBE Ad Affidavit -Construction of ADA Access Ramps & Sidewalk Improvements, Downtown Route From: The Weekly Bid Flash (support@theweeklybidflash.com) To: Iflores_martinezc @yahoo.com; Date: Thursday, March 3, 2016 11:54 AM 0 L a. 0 Proof of Publishing Affidavit o To Whom It May Concern: 4 rn Be it known that this is a sworn affidavit that Martinez Concrete did place an advertisement we published on 3/3/2016 in our nationwide publications, Construction Star, Inc. and The Weekly Bid Flash, seeking Certified Disadvantaged subcontractors and/or material suppliers for the project Construction of o ADA Access Ramps & Sidewalk Improvements, Downtown Route. m A copy of the advertisement is below: `h LO Date Of Advertisement Placement:3/3/2016 11:54:46 AM o N d Martinez Concrete An Equal Opportunity Employer, is requesting quotations from all qualified DBE 0 sub-contractors and material suppliers for the following project: 0 Construction of ADA Access Ramps&Sidewalk Improvements,Downtown Route o Y City/Location:San Bernardino County:San Bernardino Owner:City/of San Bernardino 0 Bid Date:Tuesday 3/812016 at 2:00 PM o a We are requesting bids for the following trades and/or supplies: .0 Clear and grub,Sidewalk Grinding,Utility adjustments,tree removals,Survey,Landscape,AC paving c NAILS Classifications E E Sector 23--Construction Highway,Street,and Bridge Construction �° a CSI Classifications m DIVISION 2-SITE WORK c GUARDRAILS LANDSCAPING SITE PREPARATION E t Bid documents can be viewed at or obtained from: Plans online at http://www.cl.san-bemardino.ca.us/civicax/filebank/blobdioad.aspx?blobid=20019 ¢ Martinez Concrete 920 W.Foothill Blvd. Azusa,CA 91702 Phone: (626)334-2979 Fax: Packet Pg.474 abot�:Wank 3/3/2016 Print Louis Flores lflores—martinezc@yahoo.com Published on 3/3/2016 12:00:00 PM (41� by The Weekly Bid Flash and The Construction Star Trade and Focus Publications located at www.theweeklybidflash.com and www.constarl.com Phone:1.800.479.5314 Fax: 1.619.688.0585 This solicitation Ad will run until the bid date 0 L a a 0 a Our publication is a listed approved source by the State of CA , Dept. of General Services, Office of o Small Business Certification& Resources, in its Resource Packet. 3 a Since, 1989 our firm has been proud to help businesses reach Certified Disadvantaged firms statewide. T If you should need any further information, please do not hesitate to contact us at 800-479-5314. M O Thank you again! r m Construction Bidboard Inc. N 11622 El Camino Real, Suite 100 San Diego, CA 92130 0 www.theweeklybidflash.com 800-479-5314 0 ,= 3 —� o 3 0 0 Y_ l0 3 m a c 0 Q 0 Q L 0 N C d E U 0 m d E S U lC r a. Q abaAblank Packet Pg.475 wi3z� y �. m _ 3 • 'zmw b S m °� 3° 3 6 �" 'Jr F d e a � a;� � W� crospe $� a' s, w W z. ql NE • �, � �gsa � o€000<�=�8 €€ow�� =mssasn a 00000000 ® © ©© E © ® � ® L ° s = 8� i OV1 o Tr . ----------- - 3 -------------------fir` 1,,.�; J , M g . � u W - 1 WW 3 a W E 3 I � f , I, _ - =_==__ _- ____:----------------- - � �� ��'� ��� = -_--------- B ------ -------------- -r' - , �/� ------a-aaM1�q ------- , - ---- - V 1 vvv¢®vn¢� p oa�n�pRRl➢aaanaamy i I _�________________l / O ; Uypap pppapppppppa !�! h FJ<�� U I; Os °ga a U. £_ E m Fe Asp • .1N a w # ao e W os= o ng:„ ng Tz5gW gKs fl. y s _€ao b 0=5„ 89 Rol I v Fo °c <G z. °.ice $ ='a w °z �W 7 $z gj =� ' w fpm°$ C �€ W zo PE $� °,� 8�iq om g CBwE � U �_ a C b� € $ �ii m� o Ell. w 2 � o � o o a ass= zg€g fQ� F08 fps pa� � z ^a gee ax g � cwt° ea4 pis ag a€ a � o ap= g. X.a==a §2 9_ Xaw N aHs 15-3 M d b 4 . .. . .. '4 '4 - e s r p kl I,xS'_ I I a 11 1 I I iww a[�A = I �o okW21��c1 � I _ I ,✓, 04o c aa I 1 it i it { I iA -- + I I I 1133a1S 1anoo $� `�( it ail + f •i I I I •FYI' I �t, + =I :A i � I % g ik-' I + a " I� I j r it 6 m it :t t it it e .I it it it it it I S+ I I �M�: I � I • 1 �S � I I • • $' • 0'��€6 • _ '� _I I S 13381s aNz it i iz&i p®� it i " 31, 0 z M MI oz Q d• a Z i -I 1338151 ONZ OIL—--__ 9 tt 133815 3 Sim Ii C I .v gB in - a rn Z O�30 I 1 � " o I I � " ® �a --- y b °a c 5 0 + t -- d A ————— — ----------- E� \ > Us;wm I 11 _ i LS awu f elil i / u LL 00 a „ | � � | | | | � | | / it it igoddl | it it i it Lj (wlaevavww�^Y�¢uYl afc.wyean•+e 0�®M>n HOC. id�awyxyr 3 � w g z ,a a -- _ _ j• 133M15 HIS y e --- O O e CJ 'Al_1 I i i I PI I I I 133U15 UNZ --------7L 7 I N N U Otw1 tl[ HII IOIT� � 3o M �I 3s az M �al •\ CM @8 jJ Hill P\ ewe`; \ 14"� \ 4 MM88 Er \ /t w M ` u 7 aw %moll tH . It ---------- , I I, � I �!9 .�I o< ------------------ 91 II I h ! ! I i j ,I ;44 = t3 I Pff kill non j, d' ! °I � ! of ..� � _ I s'o� l�I s��� ULLU 'p.1n loafl- •�F., ! v, �! ii W E I„.Iw,.a.,00�..s...l a ss.�».�„<e o ««�W�a�•,w�>�. a � 133ais I 3 y It $h 1 I; C.. I ;D I of I - yyIpp Y - I W — N N I I el S I' w"c86 Er 1 •..I I sI �3II i e � J — 9 I e I c I min 81 i r. t 215 If Iry • ,.: IN RIM 11NOW ISM UM 21. Mow- n �1 5.M.e Kendall Dr at University Street Stop 5458 Grind Roots U _ N -- Reset Bus o U. Equipment a Q 0 a AC Bus Pad "- 0 40'-0"x 9'-0" PCC Ped Pad 3 x 5'-5" a �t m Ch m 0 w c� U O J N O m c 3 U PCC Curb and _. c Gutter PCC Sidewalk o 85' 85'-0" x 4'-0" c R a c d E t c� Q Packet Pg. 486 5 M. Del Rosa Ave at Date Street Stop 6174 U 2- L a a o Q w O -a3 L y� 3 r PCC Ped Pad 20'-0"x 5'-0" m LIMiT N 1 U! Ar >_ V O J in CO m C _7 V C CC � M O M r C !C a c E c� a., PCC Sidewalk Q 37'-0"x 6'-0" Packet Pg.487 5.M.e Stn Street at Medical Center Drive WB Stop 0051 w U d O L a Q 0 Q O PCC Ped Pad Cu 3 25'-0"x 6'-6" Q v m U) to O r- t6 O J N CO C_ V C tD M O M r C fCf CL c d s c� r Q Packet Pg. 488 it 5.M.e Waterman Ave at 5t" Street Stop 5262 PCC Ped Pad 0 20'-0" x 5'-0" a 0 0 �a 3 Q M Ch U) Reset Bus N c Equipment ° U 0 J N 7 CO PCC Sidewalk 65'-0" x 6'-0" ' U C M O M r C CO CL .i C d E s U 4 Packet Pg. 489 Sierra Way at 16th Street Stop 5385 w Reset Bus d equipment o L a Q 0 Grind Roots Q 0 L 3 Q PCC Sidewalk PCC Curb �' 50'-0"x 5'-0" 30' CO Ch U) f N 0 0 A R 0 N 7 CO C V C O M O M r C PCC Ped Pad ii 20'-0"x 7'-2" c d s c� w Q Packet Pg.490, Kendall Dr at "H" Street Stop 5549 CD AC Bus Pad 40'- - 4 �° o 0"x 10'-0" 8"ac/12"base a o w 0 L cu 3 rn Adjust to grade water m meter cn N O V O J N m C V C to M O M r C N 0. C PCC Ped Pad 20'-0"x 4'-0" Y a Packet Pg.491" 5.M.e Stn Street at Western Ave WB Stop 5742 w PCC 8"Curb _. and 36"Gutter S- S- 0- PCC Sidewalk 90, Q 15'-0" x 5'-0" #� y . r„ w O L AC Repair a 7'-0" x 50'-0" Grind Tree -46 ae/8"base Roots m Ch N C 2 O J AC Bus Pad N 40'-0"x 9'-0" m of 8"ac/12"base = U C PCC Ped M M Grind Roots = E r Q Packet Pg.492 5.M.e Sierra Way at 16th Street Stop 5449 Grind Roots PCC Curb Reset Bus m 30' equipment IL a 0 a w 0 PCC Ped Pad Q 20'-0"x 7'-2" a� v m d� U) U7 r- 0 O J N 7 m Grind Roots c U C M O M r PCC Sidewalk c 50'-0"x 5'-0" a c d E c� a Packet Pg.493 Sierra Way at 30th Street Stop 5389 d O L- a. Adjust to PCC Ped Pad Q grade Water 20'-0"x 11'-4" Meter 3 Q rn a rr m cn N O U O J N 7 m _ 7 v PCC Sidewalk 20'-0"x 5'-0" 0 M r _ R a m E U Y a S.M.e Kendall Dr at "48 Street Stop 5557 U N O L a d PCC Sidewalk o Min- 124" x AD" vw . '_ PCC Ped Pad �. Q 200" x 50" rn v v Cn N _ 0 w U O J N 7 m _ O U PCC Sidewalk c W 14' x 4'-0" o M r _ c0 a u a� E a MFPacket Pg. 495 S.M.e Sierra Way t 19t" Y Street Stop 5386 w U A) O IL PCC Ped Pad Q 15'-0"x 11'-3" c L R 3 Q v � v m Ch U) N c 0 U 0 J N 7 m G U M p M PCC Sidewalk = 15'-0"x 4'-0" a c m E U c0 t+ a Packet Pg. 496 Highland Ave at Leroy Street g Y A.C. a Pavement `t 0 3"over native 0 Avg 3 Curb and Gutter Q (26"gutter)5 lin ft , T- With last 30" PCC Sidewalk transition to 0" C.F. 4'-0"x 6'-6" N Cn c 0 ca 0 J Join to existing N Driveway m a� PCC Handicap Ramp per SPPWC 111-5 Type 1 w/ Curb and Gutter ret curb (60" gutter) 10 lin ft o M r C d. C PCC Apron per °i E City Std 201 c� —14'-0" Q Packet Pg.497 S.M.e N sxi lc t ^S s z -f fi r^m i 3 k j ILI ;n D. Q Q C 111. Q f C< u.� a .F � MW Ch m CO E N m O N m i c> 7 G cs L 2 uj lb M cis CL A N n a x �. Ile i t �• I Packet Pg. 498