HomeMy WebLinkAbout09- Development Department D E V E L O P M E N T DE P A R T M E N T
OF THE CITY OF SAN BERNARDINO
REQUEST FOR COMMISSION/COUNCIL ACTION
From: Shauna Clark Subject: Edgehill Village
City Administrator Reinstallation of
Greenbelt
Date: March 22 , 1994
-----------------------------------------------------------------------------
Synopsis of Previous Commission/Council/Committee Action(s) :
8/16/93: Mayor referred matter to City Admn. & Fire Dept. Financial
assistance recommended - matter referred to the Community
Development Housing Committee.
1/18/94 : Housing Committee referred matter to Community Development
Commission.
-----------------------------------------------------------------------------
Recommended Motion(s) :
(Community Development Commission)
That the Community Development Commission approve a grant in the approximate
amount of $19, 500. 00 utilizing 20% set aside funds for the installation of
approximately 62 , 000 square feet of irrigation and drought tolerant
landscaping at Edgehill Village, 1400-1500 Edgehill Road.
That the Community Development Commission instruct the City Administrator's
Office to prepare an agreement between the Commission and Edgehill Management
Association, allowing for the installation of the greenbelt and collection
and/or liening of the property should the maintenance association fail to
maintain the property.
` That the Community Development Commission instruct the City Administrator's
Office to authorize the Parks and Recreation Department to oversee the repair
r and installation of the greenbelt.
Shauna Clark, City Ad n' trator
---------------------------------------------- -- - - -----
-- -- ----- ---- ---
Contact Person(s) : Jeannd Fitzpatrick Phone: ext. 5122
Project Area (s) : Ward(s) : 5
Supporting Data Attached: Staff Report and Landscape Estimates
FUNDING REQUIREMENTS: Amount: $ 19 , 500. 00 Source: 20% set aside funds
Budget Authority:
-----------------------------------------------------------------------------
Commission/Council Notes:
-----------------------------------------------------------------------------
KJH: COMMISSION MEETING AGENDA
Meeting Date: C,
Agenda Item Number: �_
D E V E L O P M E N T D E P A R T M E N T
OF THE CITY OF SAN BERNARDINO
STAFF REPORT
-----------------------------------------------------------------------------
Background
The Edgehill condominium project, consisting of 276 units, was constructed in
1979. This project was one component of the master planned community
surrounding Shandin Hills Golf Course.
The original conditions of approval required the installation of a 30 foot
wide greenbelt (approximately 62 , 000 square feet) behind the garages to act
as a fire buffer between the structures and a hillside of native vegetation.
Due to a series of circumstances, the greenbelt was not maintained. The Fire
Department issued a warning notice to Edgehill Management in June 1993 .
After some brush fires occurred on Little Mountain, it had become apparent
that Edgehill Management had not corrected the violation. A citation was
issued requesting reinstatement of the greenbelt utilizing approved type
plants and repair of the existing irrigation system.
Subsequent to the issuance of the citation, Edgehill Management appealed to
the City Council for leniency on the repairs due to lack of funds. The
atter was referred to the City Administrator's Office.
The Fire Department and the City Administrator's Office have met with
Edgehill Management in an attempt to offer some alternatives to the full
landscaping and irrigation costs of replacing the original greenbelt. After
two meetings with Edgehill Management, City representatives met with the
Homeowners' Association President and again with the management company.
They are emphatic that they cannot absorb the costs of installing a new
greenbelt nor the increased association dues. They claim that given the
value of the units, present dues of $147 per month are not affordable now and
that owners are abandoning units because they cannot sell . The association
dues for many units are delinquent.
Initially, the project was restricted to owner-occupied, but over time the
rules either were not followed or were liberalized. Due to the inability to
sell units, many have been converted to rentals. Today, 145 units are rented
(53%) .
cont. next page
-----------------------------------------------------------------------------
COMMISSION MEETING AGENDA
Meeting Date:
C
Agenda Item Number:
D E V E L O P M E N T D E P A R T M E N T
OF THE CITY OF SAN BERNARDINO
STAFF REPORT
-----------------------------------------------------------------------------
Recommendation
Pursuant to municipal code regulations, this area must be reinstated as a
fire buffer zone; however, because the homeowners' association insists on the
inability to absorb the costs of installing a greenbelt, we are requesting
financial assistance for this landscape project through the use of 20% set
aside funds.
Bid Estimates
The Parks and Recreation Department has received estimates for the proposed
project based upon the following:
1) Removal of weeds, trimming of trees and shrubs to a distance of
fifty (50) feet from the condominium garages.
2) Refurbishment of the irrigation system.
3) Hydroseeding of fire retardant ground cover mixed with annual wild
flowers on the cleared area.
A total of three landscape contractors inspected the property; however, only
two of the contractors submitted written estimates. The estimates average
approximately $18 , 500. 00 . Attached for your review are copies of the bid
estimates and the memo submitted by the Parks and Recreation Department.
The recommended grant amount also includes an additional expenditure in the
amount of $1, 000. 00 which is the estimated cost for the Parks and Recreation
Department to oversee the installation of the greenbelt.
----------------------------------------------------------------------------
COMMISSION MEETING AGENDA
Meeting Date:
Agenda Item Number:
CITY OF SAN BERNARDINO
PARKS, RECREATION & COMMUNITY SERVICES
INTEROFFICE MEMORANDUM
TO: JEANNE FITZPATRICK, ADMINISTRATIVE ANALYST
FROM: ED YELTON, SUPERINTENDENT OF PARKS
SUBJECT: EDGEHILL CONDOMINIUM SLOPE RELANDSCAPING
DATE: March 15, 1994
COPIES:
-----------------------------------------------------------------
As requested by City Administrator, Shauna Clark, an on-site
inspection of the Edgehill Condominium Landscaping was conducted to
determine the extent of refurbishment needed. The inspection was
conducted by three landscape contractors, Jim Rock of Rock
Enterprises; Excel Landscape and Golden West Landscape. The items
covered were the removal of weeds, trimming of trees and shrubs to
a distance of fifty (50) feet from the condominium garages,
refurbishment of the irrigation system and the hydroseeding of fire
retardant ground cover mixed with annual wild flowers on the
cleared area. The fifty (50) foot landscape area and the plant
material was coordinated with Paul Allaire of the San Bernardino
Fire Department.
Excel Landscape and Golden West Landscape, submitted proposals
(copies attached) for refurbishment of the slope areas surrounding
the condominium project. Jim Rock of Rock Enterprises did not
submit a proposal nor did he return phone calls. The proposals
were for completing cleanup, hydroseeding and irrigation system
repairs. Excel Landscape proposed to do the work for $ 18, 222 .
Golden West Landscape proposed to do the same work for $ 18,795.
Irrigation repairs do not include replacement of valves, wiring or
irrigation controllers, items which could not be checked during the
walk through. If any of these items are found to be inoperable,
there will be additional costs of approximately $ 4 , 000.
If you require further information and/or clarification, please
contact me at 384-5130.
ED YE TT
SUPERINTENDENT OF PARKS
ED/amt
Enclosures (2)
L
CD 40%Pre-Consumer Content•10%Post-Consumer Content o
� 1 age No. of Pages
EXCEL LANDSCAPE
4134 Indus Way (M0301 )
RIVERSIDE, CALIFORNIA 92503
(909) 735-9650
Attn: Ed Yalton
PROPOSAL SUBMITTED TO PHONE DATE
City of San Bernardino 1 3/8/94
STREET JOB NAME
300 North "D" Street Irrigation & Hydroseeding
CITY, STATE AND ZIP CODE JOB LOCATION
San Bernardino, Ca. 92418 1400 - 1500 Edge Hill
ARCHITECT DATE OF PLANS JOB PHONE
We hereby submit specifications and estimates for:
General__clean up and hydroseeding slope behind condos
30 ' from garages $5, 9 55 .00 -
Option I 50_' from garages 3_,600._00 (Additional)
Irrigation
( Includes onl lateral lines 8,670 .00
and heads, no valves )
Wr prA}ti1SP hereby to furnish material and labor — complete in accordance with above specifications, for the sum of:
See Above dollars ($ ).
Payment to be made as follows:
All material is guaranteed to be as specified. All work to be completed in a workmanlike
manner according to standard practices.Any alteration or deviation from above specifica- Authorized
tions involving extra costs will be executed only upon written orders,and will become an Signature
extra charge over and above the estimate.All agreements contingent upon strikes,accidents
—delays beyond our control.Owner to carry fire,tornado and other necessary insurance. Note:This proposal may 30
workers are fully covered by Workmen's Compensation Insurance. withdrawn by us if not accepted withl days.
Arr�eptaurr of f ropood—The above prices, specifications
and conditions are satisfactory and are hereby accepted. You are authorized Signature
to do the work as specified.Payment will be made as outlined above.
Signature
Date of Acceptance: L
,`F-1"I IIA Groton.Mass.01771.To Ord.PHONE TOLL FREE 1+800-225-6380
GOLDEN WEST
LANDSCAPE CONTRACTOR Pf-kOP®SAL
State Lic. #C27597117
5428 Rosewood St. Page No. of 3 pages
MONTCLAIR, CALIFORNIA 91763
JOB NAM F-NO
(714) 624-6680 SLOT.i:j Ai 01'11',L) C 01 1 L
LOCKFION
I JA
To:
-j L Ti:
PHONE DATE
7
PI'LOF'OSAL 1
We hereby submit specifications and estimates for:
Cii T10�? -1-
EP 11IG 3�ij P-6 "G.
�.o 0 --TI
> -Ji) ii-i(J-"L�D `P
)L 3 A L 1 A.�i
!�S L
Li N--
I%I J,0'0 11 (J Lb-,,3 '-L'O
A-7
A L L,, L T, 7
I., J
T -L
0 Y. o,
T T,-:j -.
I --'020-)AL !�-L L UkJ G C()N y; U�l o
50" 1- -:-I Y 01. 7,
ou�) C 01., 0- 7 C 1;-) 1., rc
L.A -r7 7 7 1
C,C 0-
10
L 0111. 1C
T-
i 0,]i.. ....
VALV V -Z
2. . . T 01
- 1 t"'X U Aj, ) YDi -S B D 0
j --7
> 6 01-1 0-W: $16791`-D rllG-,-:-'
DT
V.
U1, OT :'1 2 C) T-I'li
hAl_,,T'z D,C)i
WE PROPOSE hereby to furnish material and labor—complete in accordance with these specifications,for the sum of:
dollars(S 187 9
payable as follows:
i E -'0- C' ;0 ILL 13- �y
i'll OT 2 J-11A
-,G
C 0-
All material is guaranteed to be as specified.All work to be completed in a workmanlike mariner Authorized Aj C 1-4
I w0hing Signature
ii(t(irdiiig to staildard practices.Aii�alteration or deviation from above specifications it �6-
extra It(osI,will be executed oril�,upon written orders,and will become an extra charge over 7
d ahme the estimate.All agreelo(,jits contingent upon strikes.accidents or delays beyond NOTE:This proposal may be withdrawn
ontioi.Owner to carry lire,toi-irado,arici other necessary insurance.Our workers are fully may within
,ed be%Voi kincii s Compensation insurance. by us if not accepted
ACCEPTANCE OF PROPOSAL—The prices,specifications and conditions are satisfactory and are hereby accepted.You are authorized to do
the work as specified.Payment will be made as outlined above.
Signature Date Signature Date
c---_--.,F 2 was 1,c Gr.!,,,','nss 0!471 TOOrc,,PH2%E-O-PREP 833225 63L