Loading...
HomeMy WebLinkAbout16- Public Works CITY OF SAN BERN,' IDINO - REQUEST F R COUNCIL ACTION File No. 13.1R1 From: ROGER G. HARDGRAVE Subject: Authorization to Install 4-Way Stop - Intersection of Cajon Dept: Public Works Boulevard and Palm Avenue/Insti- tution Road Date: 1-26-94 Synopsis of Previous Council action: None. Recommended motion: Adopt resolution. cc: Shauna Clark Jim Penman Dan Robbins Sign re Contact person: Anwar Wagdy Phone: 5 213 Staff Report, Map Supporting data attached: and Resolution Ward: 6 FUNDING REQUIREMENTS:' Amount: $2 , 500 (General Fund) Source: (Acct. No.) 001-307-53232 Acct. Description) Signing & Striping Material Finance: -�— -ouncil Notes: 75-0262 Agenda Item No. CITY OF SAN BERN/ IDINO - REQUEST F( Z COUNCIL ACTION STAFF REPORT A request was received from the Fire Department for an evaluation of the adequacy of the existing traffic control measures at the intersection of Cajon Boulevard and Palm Avenue/Institution Road. This request was made because of the calls thev have received to respond to traffic accidents in this area. An evaluation of this intersection was accordingly done by our Traffic Engineering Section. This intersection is presently controlled by stop signs on the Palm Avenue/Institution Road approaches. The evaluation revealed that a four-way stop is warranted. Due to the isolated nature of this intersection, and the high speed approaches, it was deemed necessary to supplement the stop signs with flashing red beacons on all four approaches. One street light is presently provided at this inter- section. The evaluation found that additional lighting should be provided. Therefore, a request will be submitted to Edison for an additional street light to be installed on an existing wood utility pole. The recommendation for a four-way stop, supplemented by flashing beacons, was reviewed by the Traffic Safety Advisory Committee at their meeting of 11-10-93. After reviewing the evaluation prepared by the Traffic Engineering Section, the Committee adopted a motion that the recommendation be approved. We recommend that the four-way stop be approved. 1-26-94 -0264 c� NORTH IK S 0 �o. �� I RESOLUTION NO. i 2 RESOLUTION OF THE CITY OF SAN BERNARDINO AMENDING RESOLUTION NO. 655 ENTITLED, IN PART, "A RESOLUTION. 3 DESIGNATING CERTAIN STREETS OR PORTIONS THEREOF AS THROUGH HIGHWAYS. . . ; " AND AUTHORIZING THE INSTALLATION OF A FOUR-WAY 4 STOP AT THE INTERSECTION OF CAJON BOULEVARD AND PALM AVENUE/INSTITUTION ROAD. 5 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE 6 CITY OF SAN BERNARDINO, AS FOLLOWS: 7 SECTION 1 : Resolution No. 655 , which designates certain 8 streets or portions thereof as through highways, Section 1 , is 9 amended by adding Subsection 13 . 7A PALM AVENUE (VERDEMONT) , to 10 read as follows: 11 "13. 7A PALM AVENUE (VERDEMONT) 12 From and including Cajon Boulevard to and including 13 Verdemont Drive. " 14 15 SECTION 2: Resolution No. 655, which designates certain 16 streets or portions thereof as through highways, Section 1, is 17 amended by adding Subsection 8 . 5 INSTITUTION ROAD, to read as 18 follows: 19 "8 .5 INSTITUTION ROAD 20 At its intersection with Cajon Boulevard. " 21 22 23 24 25 26 27 28 1-26-94 tcc.0U 11Lt,JU1jUTIUI14 ODD '1'U 1-WTk1UK11'r' 1''UUK-WA1 b'1'Ue A'1' '1'tit, INTERSECTION OF CAJON BOULEVARn AND PALM AVENUE/ INSTIT ION ROAD. 1 I HEREBY CERTIFY that the foregoing resolution was duly 2 adopted by the Mayor and Common Council of the City of San 3 Bernardino at a meeting thereof, held on the 4 day of 1994 , by the following vote, to-wit: 5 Council Members : AYES NAYS ABSTAIN ABSENT 6 NEGRETE 7 CURLIN 8 HERNANDEZ 9 OBERHELMAN 10 DEVLIN 11 POPE-LUDLAM 12 MILLER 13 14 15 Rachel Clark, City Clerk 16 The foregoing resolution is hereby approved this 17 day of 1994 . 18 Tom Minor, Mayor Approved as to form 19 Cite of San Bernardino 20 and legal content: 21 James F. Penman City Attorney 22 r 23 By 24 25 26 27 28 2 -