Loading...
HomeMy WebLinkAbout21- Public Works CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION From: Michael E. Hays, Acting Subject: Rejection of bids and authorization to re-advertise Director for bids - installation of handicapped ramps in various locations per Plan No. 9793A Dept: Public Works/Engineering File No. 7.37-107 ORIGINAL Date: June 4, 1998 MCC Date: June 15, 1998 Synopsis of Previous Council Action: July 1997 Project accepted for Community Development Block Grant Funding by Mayor and Common Council. 4/20/98 Approval of plans and authorization to advertise for bids on Phase I of the Handicapped Ramps Project. 5/04/98 Approval of plans and authorization to advertise for bids on Phase II per Plan No. 9792. Recommended Motion: That all bids for the installation of handicapped ramps Phase I, per Plan No. 9793, be rejected and that the Acting Director of Public Works be authorized to advertise for bids per Plan No. 9793A. cg�-�AJ Michael E Hays Contact person: Gene R. Klatt Phone: 384-5125 Supporting data attached: Staff Report, Report of Bids Ward(s): All FUNDING REQUIREMENTS: Amount: $25.000 Source: 001-301-5952-5037 Acct.Description)CDBG Handicapped Access/Cuda cuts various locations Finance: `- Council Notes: Agenda Item No. 00— r CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT SUBJECT: Rejection of bids and authorization to re-advertise for bids - installation of handicapped ramps in various locations per Plan No. 9793A BACKGROUND: The installation of handicapped ramps along various streets has been programmed for several years. This project proposes ramps for Phase I from the $50,000 allocation of CDBG funds. Bids were received and opened on May 26, 1998. There were a total of 4 bids which ranged from $19,000 to$60,000 for the basic bid. The Engineer's Estimate for this work was $25,000; however, the low bidder has withdrawn their bid based on clerical errors. They have submitted backup information to support their claim that a clerical error resulted in their bid being $22,144.18 less than it should have been, which makes their actual bid $41,144.18. All bids exceed the Engineer's Estimate and are nearly double the price for similar work bid less than 6 weeks ago. In contacting the bidders and other contractors, no satisfactory reason could be found for the cost differential. However, it was noted that 8 bidders participated in a similar project and only 4 bidders participated in this project. The basic bid provided for the construction of 40 handicapped ramps at various locations. Phase I with additive alternatives, such as the construction of 10 additional handicap ramps in anticipation of bids similar to those previously received, took the total bid to a range of $47,994.18 to $75,800. It is proposed that the plans be modified to reflect only a basic bid without additive alternates and the project be re-advertised for bids. FINANCIAL IMPACT: Funding for this project is found in the Community Development Block Grant Projects Fund in an amount of$50,000. Phase I allocated approximately $25,000 of the total, leaving $25,000 for Phase II, which has been authorized for bids. RECOMMENDATION: Staff recommends rejection of all bids, modification of the plans and specifications to eliminate the additive alternates, and approval of the revised plan. It is requested that the Acting Director of Public Works be authorized to begin advertising for bids on this project.