44 3-3.2.2 3-3.2.3 45
elects to keep it at the Work site, at no expense
to the Agency. 1) Labor . . . . . . . . . . . . . . . . . . . . . . 20
2) Materials . . . . . . . . . . . . . . . . . . . 15
I All equipment shah be t chic to the Engi- 3) Equipment Rental . . . . . . . . . . . . 15
neer, in good workinb c;n h , , and suitable for 4) Other Items and Expenditures . . . 15
the purpose for which i Lo be r, ;d. 1%4anufac-
1 turer's ratings and ul�prov�a n:c.�ficarions shall To the sum of the costs and markups provided
be used to classify equipment and it shall be pow- for in this subsection, 1 percent shall be added as
ered by a unit of at bast the nunimuin rating rec- compensation for bonding.
ommended by the manufacturer. (b) Work by Subcontractor. When all or any part
The reported rental time for equipment already at of the extra work is performed by a Subcontrac-
°`i the Work site shall be the duration of its use on tor, the markup established in 3-3.2.3(a) shall be
,( applied to the Subcontractor's actual cost of such
the extra work. This time begin; x1hen equipment work. A markup of 10 percent on the first $5,000
is first put into actual operation un the extra work, of the subcontracted portion of the extra work
plus the time required to move it from its previous
site and back, or to a closer �itc. and a markup of 5 percent on work added in ex-
cess of$5,000 of the subcontracted portion of the
(d) Other Items. The Agency in ay .uthofizo other extra work may be added by the Contractor.
items which may be required ur. the extra work, 3-3.3 Daily Reports by Contractor. When the price for
including labor, s,rvreys, r t ria?, and equip- the extra work cannot be agreed upon,the Contractor shall
ment. These items crust b�
11 1' in their na- submit a daily report to the Engineer on forms approved
ture from those required for tlie':�'ork,and be of a by the Agency. Included are applicable delivery tickets,
type not ordinarily available from the Contractor listing all labor, materials, and equipment involved for that
or Subcontractors. (lay, and other services and expenditures when authorized.
- Invoices covering all such items in detail shall be Failure to submit the daily report by the close of the next
submitted with the request for payment. working day may waive any rights for that day. An attempt
shall be made to reconcile the report daily, and it shall be
g (e) Invoices. Vendors' invoices for material, equip- signed by the Engineer and the Contractor. In the event of
1 ment rental and other expenditures shall be sub- disagreement,pertinent notes shall be entered by each party
milted with the request for payment. If the re- to explain points which cannot be resolved immediately.
gquest for payment is not substantiated by invoices Each party shall retain a signed copy of the report. Reports
or other documentation, the Agency may estab- by Subcontractors or others shall be submitted through the
fish the cost of the item involved at the lowest Contractor.
price which was current at the time of the report. The report shall:
1) Show names of workers,classifications,an
3-3.2.3 Markup. worked. d hours
(a) Work by Contractor. The following percentages 2) Describe and list quantities of materials used.
shall be added to the Contractor's costs and shall
3) Show type of equipment, size,identification nom-
constitute the markup for all overhead and profits: her, and hours of operation,including loading and