HomeMy WebLinkAbout21- Public Works File No. 15.04-114
CITY OF SAN BERNf IDINO - REQUEST Fr' -1 COUNCIL ACTION
From: ROGER G. HARDGRAVE, Director Subject: Authorization to Execute Agreement
Granting an easement across Casa
Dept: Public Works /Engineering Ramona and Ramona Senior Complex
Properties --- Construction of the
Date: February 13, 1995 Mt. Vernon Ave. Storm Drain.
Synopsis of Previous Council action:
06-21-90 -- Mt. Vernon Avenue Corridor Redevelopment Plan adopted
08-09-93 -- Allocation of $1.8 Million in bond proceeds approved for the Mt. Vernon
Avenue Corridor Redevelopment Plan
09-07-93 -- Authorization to prepare plans for construction of Mt. Vernon Avenue Storm
Drain granted.
09-07-93 -- Resolution No. 93-464 adopted authorizing execution of an Agreement with
BSI Consultants for engineering design services.
01-09-95 -- Plans approved and authorization granted to advertise for Bids and
supplemental funding approved.
Recommended motion:
1
Adopt Resolution
DMiP' . •�'F�'7CE;
FEE 95 4 ' OE
cc: Shauna Clark, City Administrator Signature
Jim Penman, City Attorney
Contact person: _ Les Fogassy Phone: 5334
Supporting data attached: Staff Report, Maps & Resolution Ward: 1
FUNDING REQUIREMENTS: Amount: None
Source: (Acct. No.) N/A
(Acct. Description) N/A
Finance:
Council Notes:
75-0262 Agenda Item No. OW
CITY OF SAN BERNf IDINO - REQUEST FO'l COUNCIL ACTION
STAFF REPORT
The plans prepared by BSI Consultants, Inc. , for construction of the Mt. Vernon
Avenue Storm Drain, show the alignment traversing the easterly 20-25 feet of Casa
Ramona and the Ramona Senior Complex. An easement will be required to allow the
construction, operation and maintenance of this storm drain across these parcels.
The proposed Agreement states that Casa Ramona and Ramona Senior Complex will
grant the necessary easements, at no cost, and the City will replace any and all
improvements removed to facilitate construction of the storm drain. These
improvements will consist of planting about four (4) 24 inch box trees, to
replace those removed, and reinstalling the playground equipment items that will
be in conflict with the storm drain construction.
We recommend that the Agreement be approved.
75-0264
s1
PI V
H.W. Corner Lot 9 3
Nofhing Fd•or Set. Fd. 1" L.P. to
Pd. roll D.Itp toot 5*n 0ern'ordinod Par it of
uo tog• •• t btb 5treat G.y F a. 4017/ "5;+,NEE �oo�,
/t221.LG' — N s7'y4'oG"i I
P.,togged city of i
� yon DGrnordino
I`•. PGr City titer,
5e ched for VT.? per C 9.F D. 4011/1+ 74
Tr• 5410, M•b.4(,/IV
Nofhing Found RAft)M4 24�
�C-14 loe
N P�rcel No. � P,ea�bo D,e�a�s
N 1.75 Acre! uef N E �EKT
r
O
—C�lt LinG Lot y , Oloo:- 2; -
R.
N ages*;t7 C 34!..•39, .
% 4 NO
V o -
�3 -N� V i ne., OtrGbt
+i fd +' I.r. ts''�ad city of
Par"I NO. 2 a Orn ftrnvi in# per City
e.7 ) Acre* Net f. tits
O - q
o O Q p
p V
N '
i
No ScaLs S
c -
F�. 4"I.P•° per M•6 mco+ n
Fd. 1" I.e. No Tog, for 67.w.Gor I.o} No Tag
1
I: 5 per Tr. 3420, M. i3. t6pe). I
s
21 w E , 5+4--+C'
'�D4.67 `�
H.W. Comor Lof 9 3
Nothing Fd• or yet• Fj. t' L.P., tnga City off'
pd, rifil 0.14 Colt yon bernfrD�no per Gity t•1eg,
We too. •• & b" 51fCGt ` G•y F b. 4017/ 1-1,'7 4% W.E Gor.t,
j' — Pd. 1' 1.e'togged city of i
90m bernprdino per City tier,
9smhed for 1"1.1°• per r' 1 r-b-P O. 40f-7/1T,74.
Tf D420, M-0--%/!7
r
Nothing Found
t 1.05 Acre* uet
.W --Ckot Line, Lot g, 0100t 2.
R.0 D• , M.S. T/t.
J
%S
o SA
0
/►�C)AO Na V i he, yfir�,st
Paraa I No. a f,» bdrnsr m percitx
° 2.9+J Acre* Net tie+
O13 Of
- 4
O �
V
ReOAh55D IDAWA604t
'' KO SC06L S
pew u
N �
We Tog
N. 1" v,, No Tog, for g.W. Gor. Lo} •
I: 5 per Tr. 3420, M. 0. tG/19.
1 � 171.4
7th StrCGt rd• 1' i.r. teed city ofd
San 5ernsr ino per 0 1+v