HomeMy WebLinkAbout23- Development Services CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION From: Michael E. Hays Subject: Authorization to execute Contract Change Order No. 13 to Avila Construction and to transfer$135,000 from Account No. 126-369-5504-7007 Dept: Development Service ;� (Pepper/Linden) to Account No. 126-369-5504-7050 U IM�L ("E"/Kendall) Date: April 13, 1999 File No: 1.7050 MCC Date: 4/19/99 Synopsis of Previous Council Action: 5/04/98 Approval of plans and authorization to advertise for bids. 8/17/98 Award of contract in the amount of$303,933.30. 2/15/98 Approval of contract Change Order No. 12 to increase the contract in an amount not to exceed $45,000 for additional grinding and paving of the roadway, and compensation for delays. Recommended Motion: Motion 1. Authorize the Director of Development Services to execute Contract Change Order No. 13 to the contract with Avila Construction, Inc., in the amount of$45,556.50 (bringing the final total contract cost to $464,150.90) for reconstruction work related to the intersection of Kendall and`B" Street as outlined in the attached staff report; and Motion 2. Authorize the Director of Finance to amend the FY 1998-99 Capital Projects Budget and transfer$135,000 from account number 126-369-5504-7007 (Pepper/Linden-Kendall to Northpark) to account number 126-369-5504- 7050 ("E" Street/Kendall from 36"to "H" Streets). l � l� Michael E. H s Contact person: Steven Enna, Construction Engineer Phone: 384-5225 Supporting data attached: Staff Report Change Order Ward(s): 4, 5 & 7 FUNDING REQUIREMENTS: Amount: $135,000 Source: (Acct. No.) 126-369-5504-7050 Acct. Description) "E"/Kendall 36`x'to "H" Streets—widen and pave Finance:'& -�'46 , �. Council Notes: Agenda Item No.: _ CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT SUBJECT: Authorization to 1.) execute Contract Change Order No. 13 to Avila Construction in the amount of$45,556.60, bringing the total contract cost to $464,150.90, and 2.) amend FY 1998-99 Budget and transfer $135,000 from account number 126-369-5504-7007 (Pe�per/Linden/Kendall Drive to Northpark Blvd.) to account number 126-369-5504-7050 ("E" /Kendall- 36` to "H" Streets). BACKGROUND On August 17, 1998, the City Council awarded a contract in the amount of $303,993.30 to Avila Construction, Inc. for reconstruction roadwork at the intersection of Kendall Drive and "E" Streets. During Construction, various unanticipated problems were identified which resulted in major revisions to the contract plans, and additional work on the project. For example, the Soils Engineer determined that additional work was necessary to stabilize the slopes at the location where block walls were to be constructed and portions of the curb and gutter had to be removed and replaced due to inconsistencies in the existing elevations. Additionally, the roadway was widened to increase the width at the southerly end of the project. These CCO's (Contract Change Orders) numbered one (1) through eleven (11), combined with increases in contract bid quantities, resulted in an increase of$69,601.10 to the original contract of$303,993.30 for a total of$373,594.40. Most recently, on February 15, 1999, the Council approved CCO No. 12 in the amount of $45,000 to correct problems related to the dip in the road at the intersection of Kendall Drive and "E" Street. This work involved grinding the existing pavement, placement of additional concrete pavement, and installation of a cross gutter. Staff originally estimated that the additional work related to change order No. 12 would cost from $80,000 to $97,000; however, upon review by the former City Engineer, this estimate was changed to $45,000. Upon completion of the work, the actual cost of the work totaled $90,556.60 which was closer to staff's original estimate. Included in the $90,556.60 is compensation of $12,859.20 to Avila Construction for delays in completing their work. The contractor could not begin work on the change orders discussed above until staff resolved the design issues that were not originally anticipated. A 13th Contract Change Order is needed in the amount of $45,556.60. This amount, combined with the $45,000 already approved on CCO 12 will fairly compensate the contractor, Avila Construction, Inc. in the amount of$90,556.60 for all final costs related to work performed on this project. FINANCIAL IMPACT: Originally, $400,000 was budgeted for this project in FY 1995-96. A budget increase of $45,000 was approved by the Mayor and Council on February 15,1999, bring the total budget for this project to $445,000. The actual total cost of the project (including contact cost, staff time, and contingencies) is $578,750, which is $135,000 more than budgeted. The primary reason for the budget overage is due to increased contract costs and increased engineering and inspection staff time that were not accurately incorporated into previous estimates. Outlined below is a comparison of budget to actual costs: ADJUSTED (OVER)/UNDER BUDGET ACTUAL BUDGET CONTRACT $348,933 $464,151 (115,218) STAFF TIME (Engm. &Inspect.) 35,000 89,749 (54,749) CONTINGENCIES 61,067 26,100 34,967 TOTAL $445,000 580,000 (135,000) A budget transfer of$135,000 is needed to cover the additional costs associated with this contract. $135,000 can be transferred from account number 126-369-5504-7007 (Pepper/Linden-Kendall to Northpark), as the total amount allocated for this project will not be required this fiscal year. Funds for the Pepper/Linden-Kendall to Northpark project will be re-budgeted during the FY 1999-2000 budget preparation process. RECOMMENDATION That the Mayor and Common Council authorize : 1) the Director of Development Services to execute Contract Change Order No. 13 to the contract with Avila Construction, Inc. in the amount of $45,556.50 (bringing the final total contract cost to $464,150.90) for reconstruction work related to the intersection of Kendall and "E" Street as outlined in the attached staff report, and 2.) authorize the Director of Finance to amend the FY 1998- 99 Capital Projects Budget and transfer $135,000 from account number 126-369-5504-7007 (Pepper/Linden- Kendall to Northpark) to account number 126-369-5504-7050 ("E" Street/Kendall from 36`h to "H" Sts.). 2NAR C I T Y O F an bernardino D E V E L O P M E N T S E R V I C E S D E P A R T M E N T M I C H A E L E H A Y S D I R E C T O R CONTRACT CHANGE ORDER NO. THIRTEEN File No. 1.7050 DATE: 4/7/99 PROJECT: STREET IMPROVEMENTS AT "E" STREET/KENDALL DRIVE FROM 36TH STREET TO "H" STREET. TO: AVILA CONSTRUCTION P. 0. Box 6291 San Bernardino, Ca. 92412 GENTLEMEN: You are hereby compensated for performing the additional work, as directed by the Resident Engineer, as follows: Reconstruct the roadway, placement of additional asphalt concrete pavement, the installation of a cross gutter, and compensation for delays as a result of re-design of the roadwav, at an increase from S 45,000.00 to S 90,556.50, for an additional S45,556.50. Total Cost Added to the Contract ................................... S 45,556.50 Previous Contract Price ............................................... S 419,387.15 Amended Cost Price ................................................... S 464,150.90 Additional time to complete Contract due to Change Order .... 0 Working Days CONTRACTOR CITY" OF SAN BERNARDINO Accepted Recommended By: BY: MICHAEL HAYS DATE Title: Director of Development Services Date: (909) 384 - 5357 • FAX 384 . 50801 PUBLIC WORKS FAX : 384 - 5155