HomeMy WebLinkAbout22- Public Works CITY OF SAN BERN[ ZDINO - REQUEST F' R COUNCIL ACTION File No. 1.895 Approval of Contract Change Order From: ROGER G. HARDGRAVE Subject: No. TWO - Rehabilitation of Pave- Dept: on Arrowhead Avenue, from Dept: Public Works Mill St. to 3rd St. , per Plan No. 8815 -- 1-19-94 Date: MATICH CORPORATION Synopsis of Previous Council action: July, 1991 - Allocation of $500 , 000. 00 in 1991/92 Street Construc- tion Fund budget approved. 02-16-91 - Transfer of $500 , 000 . 00 to Street Resurfacing - Various locations approved and $500 , 000 allocated from Subordinate Tax Allocation Bond Issue of 1991 . 02-17-92 - Resolution No. 92-55 adopted authorizing execution of an agreement with L.A. Wainscott for professional services . 0.2-15-93 - Resolution No. 93-43 adopted authorizing execution of Program Supplement No. 77 . 04-19-93 - Plans approved and authorization granted to advertise for bids . (Cont. on second page. ) Recommended motion: That Change Order No. TWO to the contract with Matich Corporation, for rehabilitation of Arrowhead Avenue, from Mill St. to 3rd St. , be approved; to authorize the Contractor to install an additional 48 cubic yards of concrete under. Item ".Miscellanous Concrete" on a time and materials basis, at an estimated increase of $11 , 935. 79 in the contract price, from $641 , 913 . 00 to $653, 848 . 79 . cc: Shauna Clark 614 a e Contact person: Gene R. Klatt Phone: 5125 Supporting data attached: Report, CCO #2 Ward: 1 FUNDING REQUIREMENTS: Amount: $11 , 935 . 79 (Street Construction Fund) Source: (Acct. No.) 242-362-57895 Acct. Description) Arrowhead Avenue Rehabs' ' tation, Mill St. to Third St. Finance: Council Notes: 75-0262 Agenda Item No. �� PUBLIC WORKS File No. 1 . 895 SYNOPSIS OF PREVIOUS COUNCIL ACTION Continued- 08-02-93 - Resolution No. 93-289 adopted awarding a contract to the Matich Corporation for the lowest responsible bid of $626 , 413 . 00 . 12•-20-93 - Contract Change Order No. 1 approved to authorize the Contractor to stabilize the unsuitable material , at an increase in the contract price of $15 , 500 . 00 . 1-19-94 CITY OF SAN BERN/ MINO - REQUEST Fr I COUNCIL ACTION STAFF REPORT During the construction of the miscellaneous concrete for the rehabilitation of Arrowhead Avenue, the actual quantities placed exceeded the estimated quantities in the contract by over 125% , or in excess of 90 cubic yards. The additional 48 cubic yards of concrete placed was performed by the contractor on a time and material basis , as provided in the standard specifica- tions . In reviewing the estimated quantities for miscellaneous concrete, curb and gutter, sidewalks and handicap ramps, it was determined that the estimated quantities in the Bid Schedule did not accurately reflect the amount of work shown on the plans. The quantity of concrete required for the 460 lineal feet of curb and gutter was estimated per the standard plans , with an 18-inch wide gutter. However, the actual width of the existing gutter on Arrowhead Avenue was 30 inches . The estimated bid calculations for the placement of 20 handicap ramps on Arrowhead Avenue was incorrect, since it appears that the estimate did not include the replacement of the existing concrete apron. Also, there were additional areas of sidewalk that needed to be replaced, that had not been indicated on the plans. This resulted in a total of 138 cubic yards of concrete actually placed in lieu of the 72 cubic yards estimated in the contract documents . The work involved in placing the extra 48 cubic yards was performed on a time and material basis, as provided in Section 4- 103, "changes" in the State of California Standard Specifica- tions. The total estimated project cost included an amount of $106 ,587 for contingencies, which can be used to finance the additional cost for this change order. Federal-Aid Surface Transportation Funds (STP) have been approved to finance approximately 88% of the total project cost, including any required extra work. Caltrans oversees Federal-Aid funded projects to insure compliance with all applicable federal requirements. Their representative has reviewed this extra work, and determined that it is eligible for Federal-Aid funds . Since the contractor is entitled, by terms of the contract, to be compensated for any extra work required in the construction of the project, we recommend that Change Order No. 2 be approved. 1-19-94 5-0264 CONTRACT CHANGE ORDER NO. 2 REV NO. SUPPL. NO. ROAD PAVEMENT REHABILITATION-ARROWHEAD AVE SHEET 1 OF 1 FED NO. DBL-5033 (005) CONTRACT NO. 8815 TO: MATICH CORPORATION You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the State Highway Engineer Description of work to be done, estimate of quantities, and prices to be paid. Segregate between additional work at contract price, agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. The last percentage shown is not accumulated increase of decrease from the original quantity in the Engineers Estimate. EXTRA WORK AT FORCE ACCOUNT: Placement of additional Curb & Gutter, Sidewalk and Handicap Ramps, as provided under the Contract Bid Item No. 31, Miscellaneous Concrete, as directed by the Resident Engineer, on a time and material basis, for a total of 48 cubic yards of additional concrete, at a total cost of $11,935.79. ESTIMATED COST DECREASE $ INCREASE $ 11,935.79 By reason of this order the time of completion will be adjusted as follows: 10 - working days Submitted by: Resident Engineer, Date: E Approval Recommended: Date: Approved: City Engineer Date: We the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all material, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. Accepted Date: Contractor: By: Title: If the contractor does not sign acceptance of this order, his attention is 3irected to the requirements of the specifications as to proceeding with the work and filing a written protest within the time therein specified.