HomeMy WebLinkAbout14- Public Works CITY OF SAN BERK. .RDINO - REQUEST L )R COUNCIL ACTION File No. 1.382 Contract Change Order No. 1 - From: ROGER G. HARDGRAVE Subject: Traffic Signal Modifications and Interconnect on Mt. Vernon Ave. , Dept: Public Works/Engineering from 5th to Base Line Street, per Plan No. 8135 -- Date: 2-16-93 DBX, INC. Synopsis of Previous Council action: June, 1986 - Allocation of $64 , 000 in 1986/87 Street Construction Fund Budget approved. 11-04-91 -- Plans approved and authorization granted to advertise for bids . 06-01-92 -- Resolution No. 92-186 adopted authorizing execution of Program Supplement No. 70 . 09-08-92 -- Resolution No. 92-368 adopted awarding a contract for the low bid price of $125 , 000 . 09-21-92 -- Resolution No. 92-384 adopted, authorizing execution of an Agreement with Gary Brauer for construction in- spection services. 02-15-93 -- Resolution No. 93- 30 adopted authorizing execution of Program Supplement No. 74 . Recommended motion: That Change Order No. ONE to the contract with DBX, Inc. , for the Traffic Signal Modifications and Interconnect on Mt. Vernon Avenue, from 5th Street to Base Line Street, in accordance with Plan No. 8135 , be approved; to authorize the Contractor to install addition- al traffic signalization equipment at the intersection of Mt. Vernon Avenue and 6th Street, at an estimated increase in the contract price of $15 , 000 . 00; from $125 , 000 . 00 to $140 , 000 . 00 . cc: Shauna Clark Z) Signature Contact person: Gene R. Klatt Phone: 5125 Supporting data attached: Staff Report, CCO #1 Ward: 1 & 6 FUNDING REQUIREMENTS: Amount: $15 , 000 . 00 (Street Construction Fund) Source: (Acct. No.) 242-362-57382 Acct. Description) InterconneoV Traf na - Mt. Vernon Ave. , 5th St. to Base Line Street Finance: ".Z, I/ Council Notes: 75-0262 Agenda Item No. / CITY OF SAN BERN " 'IDINO - REQUEST F R COUNCIL ACTION STAFF REPORT During the installation of the Traffic Signal interconnect system at Mt. Vernon Avenue and 6th Street, two of the existing traffic signal poles were found to be badly deteriorated, and in need of replacement. Caltrans personnel were present and con- curred with the City as to the need to replace the two poles . The City suggested that since the contractor was performing work at the intersection, that all four poles be removed and replaced, which would completely modernize the signal equipment at this intersection. The delivery date of the new traffic signal poles would have delayed the project by several months . Therefore, it was suggested that the contractor could use materials already in stock at the City Yard, and replace the material that was used. This extra work will be performed on a time and material basis. It is estimated that the total cost will be approximately $15 , 000 . 00 . The total estimated project cost, based upon the actual low bid price, contained an amount of $22 , 000 for contingencies, which can be used to finance the cost of this change order. All costs incurred for Change Order No. One will be provided from Federal-Aid Urban Funds . We recommend that Contract Change Order No. 1 be approved. 2-16-93 75-0264 CONTRACT CHANGE ORDER NO. 1 REV NO. SUPPL. NO. ROAD Traffic Signal Interconnect-Mt. Vernon SHEET 1 OF 1 FED NO. FTPLG-5033 (3) CONTRACT NO. 8135 TO: DBX, INC. You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the State Highway Engineer Description of work to be done, estimate of quantities, and prices to be paid. Segregate between additional work at contract price, agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time The last percentage shown is not accumulated increase of decrease from the original quantity in the Engineers Estimate. EXTRA WORK AT AN AGREED PRICE: Remove and replace the existing traffic signal poles and accessories at the intersection of 6th and Mt. Vernon Avenue, as directed by the Resident Engineer, at the estimated cost of $15, 000. 00 ESTIMATED COST DECREASE $ INCREASE $ 8,558.55 By reason of this order the time of completion will be adjusted as follows: 20 working days Submitted by: Resident Engineer, Date: Approval Recommended: Date: Approved: City Engineer Date: We the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all material, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. Accepted Date: Contractor: By: Title: If the contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the work and filing a written protest within the time therein specified.