HomeMy WebLinkAbout10- Public Works File No. 14.40-102
CI T Y DF SAN BERK. ._RDINO - REQUEST I -,-R COUNCIL ACTION
From: ROGER G. HARDGRAVE, Director Subject: Authorization to Proceed:
Quail Canyon Sewer Construction
Dept: Public Works/Engineering Assessment District
Date: March 25, 1993
Synopsis of Previous Council action:
None
Recommended motion:
That the City Engineer and City Clerk are authorized to proceed with initiating
proceedings for the establishment of an assessment district under the provisions of
Chapter 12.90 of the San Bernardino Municipal Code and that the City Engineer is
directed to prepare an Engineer's Report for the proposed Construction of Sewer and
appurtenant facilities in Quail Canyon Court, Quail Hollow Road and in certain
easements dedicated to the City of San Bernardino for sewer in the Quail Can on area.
cc: Shauna Clark, City Administrator
Barbara Pachon, Director of Finance Signature
Les Fogassy 5334
Contact person: Phone:
Supporting data attached: Staff Report, Map Ward: 4
FUNDING REQUIREMENTS: Amount: $75,000 (Sewer line construction fund )
Source: (Acct. No.) - a�.S=000-3070
Acct. Description) Sewer Const tion and -- to be
reimbursed through assessments
Finance:
Council Notes:
75-0262 Agenda Item No.
CITY OF SAN BERN. .RDINO - REQUEST V AR COUNCIL ACTION
STAFF REPORT
A petition has been received by this office requesting the formation of an assessment
district for the construction of a sewer main in the Quail Canyon Area, from property
owners in the area. The assessment will include the construction of sewers and
appurtenant facilities, administrative costs and the cost for the acquisition of
easements. The signatures affixed to the referenced petition have been checked and
found to represent the owners of 100 percent of the area of the properties liable to
be assessed for the proposed construction. Included in the district are those
properties from which easements will be required, but will be nil assessed.
It is proposed that the construction costs will be paid for out of the sewer
construction fund which will then be reimbursed through assessments over a period of
10 years.
Since the proposed district was requested by 100% of the owners, it is recommended
that authorization to proceed be granted.
75-0264
Po►: John Floncock Survey, M. a 2142 27C
�5J
�Bow` ' 4.6Z 4C MIL
9 - Cooei p N B`
0
e-�
2 C ? `^ 4741 ` 1.96 7aC.
1 0 6 j10 2�4 '
d,
Par-I ►
Ne SGp I,t Abet Y 6 AiLJ JJ� �
fly ti ••ii O %are �.r �? 6 . �3
Par-2 u 0
a C ��. 5 1.11 Ac
t s -
q 1.17 3 ¢ 57
n'• t
9 C 4.6 AC)
to 10
o w
o
i y
1 s 41 a, 45 0 3.9
1.46 AC I 1 Al
,� IT-- I�AC t f1.545AQI6s
2.16 AC
39 e G ,\ � G 12
37 +' • Q
n 43 x C of
PFAOPO.Sat) (1.01?A
0 33
c 34
.3 4.
3 �)
33 . 4 \ \
.23 AC
is 1q
4,
J P 1.96 AC. , 19
7 21
mb
41,_cVUE
. .- Ul
t3 i Q
• _
_
22 Parcel Map 6 53,P.M.71/[ r AC 8-29 N
1
�'—
2f `