Loading...
HomeMy WebLinkAbout19- Public Works CITY OF SAN BERNA DINO C-/ REQUEST FC COUNCIL ACTION File No. 1.7001 Authorization to Execute Standard From: ROGER G. HARDGRAVE Subject: Contract with County of San Bernardino -- Construction of Dept: Public Works Box Culvert on Foothill Drive at Little Sand Creek Date: 3-21-95 Synopsis of Previous Council action: None. Recommended motion: 1 . That the transfer of $76 , 200 , from Account No. 126-000-3405 , "Unappropriated Reserve, " to Account No. 242-362-5504-7001 , "Box Culvert on Foothill Drive @ Little Sand Creek, " be approved. AND 2 . Adopt resolution. cc: Shauna Clark Jim Penman Barbara Pachon Signature Contact person: Roger G. Hardqrave Phone: 5025 Staff Report, Contract Supporting data attached: & Resolution Ward: 4 FUNDING REQUIREMENTS: Amount: $76 , 200 (Street Construction Fund) Source: (Acct. No.) 242-362-5504-7001 (Acct. Description)Box Culvert on Foothill Drive at Little Sand Creek Finance: Council Notes: Listed under 1998/99 Fiscal Year in the proposed 1994/95 - 1998/1999 Capital Improvement Program 75-0262 Agenda Item No.�� r CITY OF SAN BERNAADINO — REQUEST FtoR COUNCIL ACTION STAFF REPORT Construction of a box culvert on Foothill Drive, at Little Sand Creek, was included in the adopted 1993/94 - 1997/98 Capital Improvement Program, under the 1993/94 Fiscal Year. Funding was listed as Federal-Aid STP Funds, but none were actually made available. The box culvert on Foothill Drive is listed under the Fiscal Year, in the proposed 1994/94 - 1998/99 Capital Improve- ment Program. The San Bernardino County Flood Control District has a project to improve their Lemon Debris Basin on Little Sand Creek, south of Foothill Drive. Certain improvements will have to be constructed in order to convey storm water from the dip across Foothill Drive into Lemon Basin. The District has proposed that a box culvert be constructed to replace the existing dip on Foothill Drive. Con- struction of a box culvert will obviate the need to construct the improvements to convey water into Lemon Basin. Under the District' s proposal , the construction cost will be borne equally by the County and City. All costs for preliminary and construc- tion engineering are being financed by the County. The District has prepared a rough estimate of $152 ,400 for the construction cost, which will place the City' s share at $76 , 200 . We feel that this proposal is advantageous to the City, and recommend that it be accepted. A Cooperative Agreement has been prepared by the County, to stipulate the duties and responsibilities of each party. The proposed Agreement provides, in general, that the County . will proceed to construct the box culvert, as a part of their larger Lemon Basin Project, and bill the City for 1/2 of the construc- tion cost after the project is completed. It is recommended that the transfer of $76 , 200 , from the Unappropriated Reserve in the Gas Tax Fund (126) , to Account No. 242-362-5504-7701 , "Box Culvert on Foothill Drive @ Little Sand Creek, " be approved; in order to provide sufficient funding for the City' s share of the project cost. 3-21-95