HomeMy WebLinkAbout14- Development Department L i VELOPMENT DEPARTM11T
OF THE CITY OF SAN BERNARDINO
REQUEST FOR COMMISSION/COUNCIL ACTION
FROM: KENNETH J. HENDERSON SUBJECT: PRECONSTRUCTION
Executive Director COST ESTIMATION
SERVICES - STATE
DATE: December 15, 1993 CONSOLIDATED
O F F I C E S A N D
CALTRANS BUILDING
--------------------------------------------------------------------------------------------------------------------------------------------------
Svnopsis of Previous Commission/Council/Committee Actionts):
On August 2, 1993, the Community Development Commission established the State Consolidated Offices and
Caltrans Building Request for Qualifications Review Committee to begin the process of selecting qualified
professional consulting services.
-------------------------------------------------------------------------------------------------------------------------------------------------
Recommended Motion(s):
(Community Develoument Commission)
MOTION: That the Community Development Commission authorize the Executive Director to draft and
execute a contract with Swinerton & Walberg in an amount not to exceed $70,000 for
preconstruction cost estimation and value engineering services for the design of the State
Consolidated Offices and Caltrans Building on the Government Center site; further, that the
Agency's adopted budget be increased by$70,000 for such services and that the Executive Director
be authorized to execute such other documents as are required to carry out the terms of said
contract.
l
Administrator KENNETH J. HEN&RsoN
Executive Director
-------------------------------------------------------------------------------------------------------------------------------------------------
Contact Person(s): Kenneth J Henderson/David J Norman Phone: 5081
Project Area(s): Central City North Ward(s): One 1
Supporting Data Attached: Staff Report
FUNDING REQUIREMENTS: Amount: $ 70.000 Source: Bond Proceeds
Budget Authority: Requested
---------------------------------------------------------------------------------------------------------------------------------------------------
Commission/Council Notes:
--------------------------------------------------------------------------------------------------------------------------
TCS:DJN:nml:costestm.cdc COMMISSION MEETING AGENDA
MEETING DATE: 12/20/1993
Agenda Item Number: _
r
DE 1EL0PMENT DEPART1, _ : NT
STAFF REPORT
--------------------------------------------------------------------------------------------------------------------------
Preconstruction Cost Estimation Services - State Consolidated
Offices and Caltrans Building
This report seeks Community Development Commission authorization for the Executive Director
to execute a contract not to exceed $70,000 with Swinerton & Walberg for preconstruction cost
estimation and value engineering services for the design of the State Consolidated Offices and
Caltrans Building on the Government Center.
BACKGROUND INFORMATION
The development of the Government Center Towers and parking garage requires the services of
an experienced construction firm which can provide cost estimation and value engineering
services. The primary purpose of these services is to verify the architect's estimates of
construction costs and perform value engineering studies on various components of the building's
systems. In connection with these services, the cost estimator will also perform scheduling tasks
which will help the project team stay on track.
The State Consolidated Offices and Caltrans Building Qualifications Review Committee met on
December 7, 1993 for the purpose of selecting the most qualified preconstruction cost estimating
firm among those who submitted qualifications (see Attachment "A"). Among the twelve firms
which submitted qualifications, the firm of Swinerton & Walberg was selected by the Committee
as the most qualified for this project. Swinerton & Walberg, a Los Angeles firm, has extensive
experience in the construction of high rise office buildings and parking garages and is well suited
for the position of preconstruction cost estimator. It should be noted that no firm submitting
qualifications met the Committee's definition of a local firm.
The Qualifications Committee declined to interview a short list of firms, and decided to forward
to staff the top three firms for negotiation of a contract, beginning with Swinerton & Walberg.
Staff has negotiated a contract, and finds Swinerton & Walberg's proposed fee to fall within
accepted industry standards.
It should be noted that the cost of this contract, as well as other professional consulting contracts
and the cost of construction of the site will be reimbursed to the Agency by the State as part of
its lease of the buildings and the parking garage.
--------------------------------------------------------------------------------------------------------------------------
TCS:DJN:nml:costestm.cdc COMMISSION MEETING AGENDA
MEETING DATE: 12/20/1993
Agenda Item Number: '
DEVELOPMENT DEPAi,.MENT STAFF REPORT
Preconstruction Cost Estimation Services - State Consolidated Offices and Caltrans Building
December 14, 1993
Page 2
--------------------------------------------------------------------------------------------------------------------------
RECOMMENDATION
It is, therefore, the recommendation of staff that the Executive Director be authorized to draft and
execute a contract for an amount not to exceed $70,000 with Swinerton & Walberg for
preconstruction cost estimation and value engineering services for the design of the State
Consolidated Offices and Caltrans Building on the Government Center site.
d
Staff recommends adoption of the form motion.
vikt.4" —
KENNETH J. kENDERSON, Executive Director
Development Department
--------------------------------------------------------------------------------------------------------------------------
TCS:DJN:nrn1:costestm.cdc COMMISSION MEETING AGENDA
MEETING DATE: 12/20/1993
Agenda Item Number: 'C
REQUEST FOR QUALIFICATIONS REVIEW COMMITTEE
STATE CONSOLIDATED OFFICES & CALTRANS BUILDING
Minutes
December 7, 1993, 1:00 p.m.
A meeting of the State Consolidated Offices and Caltrans Building Request for Qualifications
Review Committee was called to order at 1:00 p.m. on Tuesday, December 7, 1993 in the
Board Room of the Economic Development Agency, 201 North "E" Street, Third Floor, San
Bernardino, California, by Chairman and Councilmember Edward V. Negrete.
MEMBERS PRESENT
The Honorable Edward V. Negrete
The Honorable Norine Miller
Roger Hardgrave
Richard Mayo
Susan Morales
Jim Robbins
MEMBERS ABSENT
Judy Cady
MEMBERS SUBSTITUTED
Donald Gingrich was substituted for Judy Cady as approved by the Committee on its meeting
of November 30, 1993.
STAFF PRESENT
David J. Norman, Development Specialist, Economic Development Agency
David Padrutt, Project Administrator, The Staubach Company
SELECTION OF PRE--,CONSTRUCTION COST ESTIMATING FIRM
Mr. Padrutt led the discussion and spoke about the type of work the firm would do. Mr.
Padrutt also spoke about his experience with different firms and the type of compensation that
would be involved.
Chairman Negrete questioned whether the cost estimating firm would have an advantage when
it came to the bidding for the construction of this job. Mr. Norman replied that in the case of
the police station construction the cost estimating firm was in fact the high bidder and there
was no advantage to being the cost estimator in that situation. Mr. Padrutt and Mr. Mayo
affirmed Mr. Norman's assessment that there is no inherent advantage given to the pre-
construction cost estimator for the construction bid.
ATTACHMENT "A"
; �l
Mr. Negrete instructed Mr. Norman to note for the record that no advantage in bidding for the
construction of the Superblock site is given to the firm who is awarded the contract for
preconstruction services cost estimator.
RATING OF FIRMS
The Committee decided to develop a short list by consensus for the purpose of rating a
limited number of firms. Through this process the firms of McCormick Construction,
Swinerton & Walberg, Nielson Construction, Turner Construction, Koll Construction and
Vanir Construction Management were selected for rating by the Committee.
A motion was made by Ms. Morales and seconded by Mr. Mayo that the firms of
McCormick Construction, Swinerton & Walberg, Nielson Construction, Turner Construction,
Koll Construction and Vanir Construction Management be rated by the Committee. The
Committee voted unanimously to rate the aforementioned firms.
The Committee performed two different numerical ratings for each of the short listed firms.
The first rating was a strict numerical rating based on the cumulative total of all seven voting
Committee members. The cumulative totals of the firms are presented in descending order:
Firm Total
Swinerton & Walberg 97
Turner Construction 91
Koll Construction 89
Nielson Construction 80
McCormick Construction 78
Vanir Construction Management 71
As is the Committee's practice, the Committee took the raw scores from these seven members
and threw out the lowest and highest of the seven scores to eliminate any skewing from either
end. These scores essentially confirmed the previous scores, and they are presented in
descending order:
Firm Total
Swinerton & Walberg 73
Turner Construction 69
Koll Construction 66
Nielson Construction 57
McCormick Construction 55
Vanir Construction Management 52
A motion was made by Chairman Negrete and seconded by Mr. Hardgrave that the three top
rated firms be given to staff to begin the process of negotiations beginning with the top rated
firm. The Committee voted unanimously to accept the motion.
ADJOURNMENT
The meeting adjourned at 2:45 p.m.
Respectfully submitted,
D VID J. NORMAN, Development Specialist
Development Department
Reviewed and approved:
EDWARD V. NEGRETE, Councilman, Ward I
City of San Bernardino
minutes.127