Loading...
HomeMy WebLinkAbout26- Public Works -CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION File No. 1 . 7034 From: ROGER G. HARDGRAVE Subject: Approval of Contract Change Order No. 1 - Installation of Traffic Public Works Signals at Northpark Boulevard & Dept: Coyote Drive, per Plan No. 9419 - Date: 6-13-96 HOVEY ELECTRIC, INC. Synopsis of Previous Council action: 10-16-95 - Transfer of $45 ,000 to provide funds for City' s share approved. 11-20-95 - Resolution No. 95-392 adopted authorizing execution of Standard Agreement Contract No. W957032 with San Bernardino State. University. 03-04-96 - Plans approved and authorization granted to advertise for bids. 05-06-96 - Authorization to initiate proceedings for installation of fill-in sidewalk on Northpark Boulevard continued to 5-20-96 . 05-20-96 - Authorization to initiate proceedings tabled. Recommended motion: 1. That the transfer of $6,575, from Acct.#126-000-3405, "Undesignated Reserve, " to Acct. #126-369-5504-7034, "Traffic Signals - Northpark Blvd. & Coyote Dr. , " be approved. AND 2. That Change Order No. 1 to the contract for the installation of Traffic Signals at Northpark Blvd. & Coyote Dr. , in accordance with Plan No. 9419, be approved; to compensate the Contractor for 540 L.F. of sidewalk along Northpark Blvd. , at an estimated increase to the contract price of $11 ,375.00, from $126,856.50 to $138 ,231.50. cc: Shauna Clark Signature Contact person: Gene R. Klatt Phone: 5125 Supporting data attached: Staff Report & CCO #1 Ward: 5 FUNDING REQUIREMENTS: Amount: $11 , 375 (Gas Tax Fund & Property Owner) Source: (Acct. No.) 126-369-5504-7034 Acct. Description) Traffic ignals- Northpark Blvd. & Coyote Drive v Finance: ---� Council Notes: 7/1_ 75-0262 AncinAn Itcm K1^ CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT A contract has been awarded for installation of traffic signals at Northpark Boulevard and Coyote Drive. Pedestrian signals and crosswalks will be installed by this project. There is a vacant lot on the south side of Northpark Boulevard, west of Coyote Drive. Sidewalk has not been installed along the approximate 450 foot frontage of this vacant lot. Also, sidewalk is missing adjacent to two single family lots that back up to Northpark Boulevard. The length of these two back-up lots is about 90 feet. Chapter 12 . 92 SBMC gives authorization for the City to notify the owner to install sidewalk, since one-half of the block has sidewalk. Authorization to initiate proceedings to order sidewalk installed was tabled at the Council meeting of 5-20-96 . The property owner has agreed to pay 1/2 of the cost of installing sidewalk adjacent to the vacant parcel. The other one- half, plus the 90 feet of back-up frontage, will have to be paid by the City. Hovey Electric, the Contractor for installation of traffic signals at Northpark Boulevard and Coyote Drive, has submitted a price quote for installing about 540 linear feet of sidewalk. Below is a tabulation of the cost based upon this price quote. No. Item Vacant Lot Back-Ups Total 1 Roadway Embankment $ 3 , 463 $ 693 $ 4 , 156 2 Sidewalk, 540 ft. 4 , 860 972 5 , 832 @ $1 . 80/sq. ft. 3 Driveway Approach, 677 -0- 677 24 ' , Type II Sub-Totals $ 9 , 000 $ 1 , 665 $ 10 , 665 Contractor' s Mark-up 600 110 710 Total Estimated Costs - $ 9 , 600 $ 1 , 775 $ 11 ,375 The property owner will pay one-half of the cost for in- stalling sidewalk and a driveway approach, estimated at $4 , 800 . The remaining $6 ,575 will need to be financed by the City. It is recommended that the transfer of $6 , 575 , from Account No. 126-000-3405 , "Undesignated Reserve, " to Account No. 126-369- 5504-7034 , "Traffic Signals - Northpark Boulevard & Coyote Drive, " be approved to provide the necessary supplemental funding to finance this extra work. A copy of a vicinity map is attached for reference. 6-13-96 TATS ST. M c� c L IN J q A j . r Z 01 G'V/vim TF 0 C, nt S Ty O �C L C� N ` Q. a � r� �o e• ,, gU PQ1y, b: OF n3O , i® ~� ® o P o poSFD mt 14&RI O r n e ^� u =f • / `per (3nV N&3lS3�111 c� _ m ox C I T Y O F S A N B E R N A R D I N O DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION Project: INSTALLATION OF TRAFFIC SIGNALS AT NORTHPARK BOULEVARD AND COYOTE DRIVE. File No. : 1. 7034 Plan No. : 9419 Date: 6/13/96 CONTRACT CHANGE ORDER NO. ONE TO: HOVEY ELECTRIC, INC. 13028 Whittram Avenue Etiwanda, CA 91739 Gentlemen: You are hereby compensated for performing the extra work as directed by the Resident Engineer, as follows: Place, grade and compact fill material within the 450-lineal foot area adjacent to the vacant lot, and the 90-lineal foot area of back-up footage of two adjacent lots, located on Northpark Boulevard as follows: NO. DESCRIPTION ESTIMATED UNIT ESTIMATED QUANTITY PRICE COST 1 ROADWAY EMBANKMENT L.S. 1 $ 4,156.00 $ 4, 156.00 2 SIDEWALK S.F. 3240 $ 1.80 $ 5,832 .00 3 DRIVEWAY APPROACH L.S. 1 $ 677 .00 $ 677 .00 CONTRACTORS MARK-UP $ 710.00 TOTAL ESTIMATED COST $ 11,375. 00 Total Extra Work Cost added to the Contract . . . . . $ 11,375.00 Previous Contract Price . . . . . . . . . . . . . . . . . . . . . . . . .$ 126,856.50 Amended Cost Price . . . $ 138,231. 50 Additional time to complete Contract due to Change Order -0-Working Days CONTRACTOR CITY OF SAN BERNARDINO Accepted Recommended By: By: ROGER G. HARDGRAVE DATE Title: Director of Public Works/City Engr Date: