Loading...
HomeMy WebLinkAbout25- Public Works L . CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION Approval of Plans & Authorization From: ROGER G. HARDGRAVE Subject: to Advertise for Bids - Installa- tion of Traffic Signals & Channel- Dept: Public Yorks ization at Mt. Vernon Avenue & Date: 6-17--96 ORIGINAL 21st Street, per Plan No. 9515 Synopsis of Previous Council action: 02-19-96 - Installation of Traffic Signals & Channelization approved in concept, and direction given to present alternate means of financing. 03-04-96 - Authorization granted to proceed with design. and engineering, and that the funding designation be brought back at a later date. Recommended motional } 1 . That the expenditure of $151 , 000 , from Account No. - - " for installation of traffic signals & channelization at Mt. Vernon Avenue and 21st St. , be approved. AND 2 . That the plans for installation of traffic signals and channelization at Mt. Vernon Avenue & 21st St. , in accordance with Plan No. 9515 , be approved; and the Director of Public Works/City Engineer be authorized to advertise for ' ds . cc: Shauna Clark Tim Steinhaus 11�4 Barbara Pachon ignature Contact person: Roger G. Hardgrave Phone: 5025 Supporting data attached: Staff Report Ward: 6 FUNDING REQUIREMENTS: Amount: $151 , 000 Source: (Acct. No.) To be determined Acct. Description) Financ Council Notes: 75-0262 Agenda Item No. �" CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT Plans for installation of traffic signals and channeli- zation, at Mt. Vernon Avenue and 21st Street, have been prepared and the project is ready to be advertised for bids. The project consists, in general , of installing fully automated traffic signals and highway safety lighting, and installing a curbed island. Below is an estimate of the total project cost: Construction Contract $ 120 , 937 Consultant' s Design Fee 4 , 000 Construction Engineering 6 , 463 Sub-Total $ 131 ,400 Contingencies (150) ± 19 , 600 TOTAL ESTIMATED PROJECT COST $ 151 , 000 Additive Alternate "A" Install Stamped Concrete in Island - 1 , 905 sq. ft. @ $4 . 27/sq. ft. $ 8 , 150 Inclusion of stamped concrete within the curbed island to be con- structed by this project will increase the total estimated project cost from $151 , 000 to $159 , 150 . Direction was given at the Council meeting of 3-04-96 to investigate the cost of providing audible pedestrian signals for the hearing impaired. Six of these audible signals would be needed at this intersection. The unit cost is quoted at $350 each, which would increase the cost by about $2 , 100 , in the event that it is desired to provide this feature in connection with the new traffic signals. Authorization was granted at the Council meeting of 3-04- 96 to proceed with the design, with the funding source to be identified at a later date.. The funding source should be identified before the project is advertised for bids. 6-17-96