Loading...
HomeMy WebLinkAbout19- Public Works FILE NO. 7 .01-11 CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION From: ROGER G. HARDGRAVE Subject: APPROVAL TO SUBMIT REQUEST FOR AUTHORIZATION FOR FUNDING UNDER Dept: DEPARTMENT OF PUBLIC WORK,, '- EDERAL HIGHWAY BRIDGE REPLACE- rd t�w—ENT AND REHABILITATION PROGRAM Date: 2-20-96 MT. VERNON AVENUE AND MT. VIEW AVENUE BRIDGE Synopsis of Previous Council action: NONE Recommended motion: THAT APPROVAL BE GIVEN TO SUBMIT REQUESTS FOR AUTHORIZATION OF FUNDS, UNDER THE FEDERAL—AID HIGHWAY BRIDGE REPLACEMENT AND REHABILITATION (HBRR) PROGRAM, FOR THE MT. VERNON AVENUE BRIDGE OVER SANTA FE'S "A" YARD, AND MT. VIEW AVENUE OVER MISSION CREEK. CC: S. CLARK gnatu re Contact person: ROGER G. HARDGRAVE Phone: 5025 Supporting data attached: STAFF REPORTS & REQUESTS FOR AUTH. Ward: 1 & 3 FUNDING REQUIREMENTS: Amount: N/A Source: (Acct. No.) Acct. Description) Finance: Council Notes: 3910 75-0262 03-04-96 Ananrla 1tom Kin 7 CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT CALTRANS HAS ESTABLISHED A LIST OF STRUCTURALLY DEFICIENT OR FUNCTIONALLY OBSOLETE LOCAL BRIDGES. ANY STRUCTURE ON THIS LIST IS ELIGIBLE FOR FUNDING UNDER THE FEDERAL HIGHWAY BRIDGE REPLACEMENT AND REHABILITATION (HBRR) PROGRAM. THIS PROGRAM PROVIDES 80% OF THE PROJECT COST. THOSE STRUCTURES WITH A SUFFICIENCY RATING OF LESS THAN 50 ARE DEEMED STRUCTURALLY DEFICIENT, AND ELIGIBLE FOR REPLACEMENT. ANY STRUCTURE ON THIS LIST, WITH A SUFFICIENCY RATING OF MORE THAN 50, IS CONSIDERED FUNCTIONALLY OBSOLETE AND ELIGIBLE FOR REHABILITATION. IN THE EVENT THAT THE ESTIMATE FOR REHABILITATION IS MORE THAN FOR REPLACEMENT, THE FUNCTIONALLY OBSOLETE BRIDGE IS ELIGIBLE FOR REPLACEMENT. NONE OF THE SEVEN BRIDGES ON THIS LIST, THAT ARE WITHIN THE CITY OF SAN BERNARDINO HAVE A SUFFICIENCY RATING OF LESS THAN 50. WE RECOMMEND THAT THE MT. VERNON AVENUE OVERHEAD OVER SANTA FE' S "A" YARD, AND THE MT. VIEW AVENUE BRIDGE OVER THE MISSION CREEK FLOOD CONTROL CHANNEL , BE SUBMITTED AS CANDIDATE PROJECTS FOR REHABILITATION UNDER THE PROGRAM. THE MT. VERNON AVENUE STRUCTURE WAS CONSTRUCTED IN THE 19201S, AND IS NOT WIDE ENOUGH TO SATISFACTORILY HANDLE CURRENT TRAFFIC VOLUMES. A REQUEST HAS BEEN SUBMITTED TO SANBAG FOR ASSISTANCE IN PROVIDING THE REQUISITE 20% LOCAL MATCHING FUNDS. THE PRELIMINARY ESTIMATE OF COST FOR REPLACING THIS STRUCTURE IS $5 , 000, 000.00, OF WHICH $1 , 000, 000.00 WOULD BE THE LOCAL MATCH. NO ESTIMATE IS AVAILABLE FOR REHABILITATION. THE STRUCTURE ON MT. VIEW AVENUE, OVER THE MISSION CREEK FLOOD CONTROL CHANNEL, PROVIDES TWO TRAFFIC LANES, WHICH ARE INADEQUATE FOR THE PROJECTED TRAFFIC VOLUMES. IT IS ENVISIONED THAT REHABILITATION OF THIS STRUCTURE WOULD ENTAIL WIDENING TO MATCH THE PLANNED ULTIMATE WIDTH OF MT. VIEW AVENUE. ONE HALF OF THIS STRUCTURE IS WITHIN THE CITY OF REDLANDS, WHICH MEANS THAT THE 20% LOCAL AGENCY SHARE WOULD BE EVENLY DIVIDED BETWEEN BOTH AGENCIES. WE RECOMMEND THAT APPROVAL BE GIVEN TO SUBMIT REQUESTS FOR AUTHORIZATION FOR FEDERAL-AID FUNDS FOR THESE PROJECTS. COPIES OF THESE REQUESTS ARE ATTACHED FOR REFERENCE. 75-0264 Page 1 REQUEST FOR AUTHORIZATION AGENCY : CITY OF SAN BERNARDINO FLAG: LOCATOR: PROJ/AGR NO.: ( ) (DIST.,CO.,RTE.,AGCY.ABBREV.) EA: PROJ. LOCATION: MT. VERNON AVENUE BRIDGE CROSSING SANTA PREP: FE RAIL ROAD RESP AGENCY: CITY OF SAN BERNARDINO EXEMPT _ or TYPE OF WORK: BRIDGE REHABILITATION CA Y— N X RTE: PM: THIS REQ.: PRE FOR: DEMONSTRATION PROJECTS: Estimated Construction Date FSTIP INTERGOVERNMENTAL RIGHT-OF-WAY FTIPIDATA REVIEW ESTIMATE TOTAL COST URBANIZED: 048 POP: 1 EXEMPT: Y COMMENT: A R/W ACQ (Pcls): $ MPO: STATE OPR#: RAP (Fmis): $ YEAR AREA IGR#: (Bus): $ APP. DATE: LRH/HRDSHP: $ ENVIRONMENTAL DATA SHEET NO. : TYPE: 1 UTILITIES: $ TIP NO (PPNO): EIS (Yr &#) SUPPORT: $ APPROVED TOTAL: $ RR RING#S INITIAL FED AUTHORIZATION RR-PUC#: PE Date: ENERGY: % TOPICS: RW Date: R/W CERT.: RR-FED #: CON Date: R/W CERT DATE: Prepared by: PHONE: 384-5127 DATE: 2/19/9E T. JARB THAIPEJR Page 2 REQUEST FOR AUTHORIZATION PROJ/AGR NO: ( ) CMAQ Projects: Air Basin (Name & Code) 6098 SOUTH COAST Local Agency/State Comments: PROJ/AGR NO: ( ) DETAIL RECORD #/#: APPN; 114 LINE NUMBER: 10-19 URBAN/RURAL: COUNTY CODE: 071 CONGRESSIONAL DIST(S): 40 STATISTICAL DATA APPN COUNT NO OF RELOC PAY NUMBER OF: WORK CLASS 1 WORK TYPE (1-4) PENG LANES ; 4 FUNCTION CLASS UP SAFETY/RR 2A STRUCTURES 1 FED AID SYS U FED RES SYS Z BUSES/OTHER VEHICLES STATE SYS CONNT BY C INTERSECTIONS IMPROVED MILES KILOMETERS PROJECTS LANE MILES LANE KILOMETERS CROSSINGS PROTECTED CROSSINGS IMPROVED TOTAL COST PARTICIPATING FEDERAL FUNDS COSTS PREY. OBLIG TRF/MGT/CNTRL PROJECTS 1 THIS REQ OPERATING PROGRAMS 1 TOTAL PARKING SPACES 0 BRIDGE #'S 54CO066 t LPP 95-07 Exhibit A REENGINEERING, Attachment 1. Project Authorization/Federal Fund Obligation Page 4 REQUEST FOR AUTHORIZATION Verification Statement Federal Project Number Project Location MT. VERNON AVENUE BRIDGE CROSSING SANTA FE RAILROAD Type of Work BRIDGE REHABILITATION I declare that the facts and statements in this "Request for Authorization" of Federal funds are accurate and correct. This Agency has complied, or hereby agrees to comply, with the applicable terms and conditions set forth in (1) Title 23, U.S. Code, Highways, (2.) the Regulations issued pursuant thereto and (3) the policies and procedures promulgated by the Federal Highway Administrator relative to the above designated project. The amounts requested do not exceed the Federal funds provided to this agency in the FTIP. I understand that this Agency is responsible for costs in excess of the Federal funds to be obligated and that such obligation extends only to costs incurred by the Agency after it has received FHWA "Authorization to Proceed" with both authorization and obligation established for the project activity or phase involving such costs. _ This agency plans to begin invoicing for costs: • Pte_ as incurred, (*PE or R/W phases) • after contract award, • Please initiate preparation of the Supplemental Agreement and PR-2: • gpon authorization. Agreement checklist • after contract award attached in order that payments may be made. I understand that invoice requests for payment should not be submitted until both these documents have been prepared and exec Signed ROGER G. HARDGRAVE Title I)TRF.C`T'C)R (7F PiTRT.TC' WORKS/ Date Z Sk CITY ENGINEER i Agency CTTYY OF SAN BERNARDINO pC,, _ / LPP 95-07 Exhibit B REENGINEERING, Attachment 1. Project Authorization/Federal Fund Obligation Page 1 Project Prefix check list Federal Programs: Identify each fund type to be used for this project Prefix Program pq (STP) Surface Transportation Program [ ] (MA) Minimum Allocation [ ] (DB) Donor Bonus [ ] (BH) Bridge Rehabilitation [ ] (BR) Bridge Replacement [ ] (CM) Congestion Mitigation & Air Quality [ ] (AHL) Access Hwys to Public Rec. Areas [ ] (ER) Emergency Relief [ ] (PLH) Public Lands Highway [ ] Demonstration Project Varies specify if known [ ] Other Describe Sub-Programs (Check all that Apply) [ ] (L) Local (Fund appropriation management) [ ] (S) State (State approp. management) not normally handled in OLP ( ] (N) On National Highway System (Currently all Principal Arterials) [ ] (R) Safety - Railroad [ ] (H) Safety - HES Program List Number [ ] (G) 100% Federal Funding (for Safety) [ ] (P) Bridge Painting [ ] M Bridge Rail replacement ( ] (Z) Seismic Retrofit - State Mandatory Pgm. ( ] (V) Seismic Retrofit - Voluntary Pgm. [ ] (E) TEA - Trans. Enhancement Activity Second vote request or Vote date Bridge (HBRR) only Sub-Programs [ ] (S) On System (Functional class greater than below) (0) Off System (Local Street/Road or Rural minor collector) Additional State Funds involved (info only - does not affect prefix) [ ] TSM - Traffic System Management - Match _ Other _ [ ] SLTPP - St. & Loc. Trans. Partnership Prog. [ ] FCR - Flexible Congestion Relief [ ] Other Specify The prefix provides a quick summary of the funding programs and subprograms. ~ -LPP 95-07 Exhibit C REENGINEERING. Attachment 1. Project Authorization/Federal Fund Obligation Page 1 I Z >: Z CL o °z > •. z U U O o m ° Z j a O Q c Q a y O Z J Q F- O Q H a W :..: W :•>: J W J Y U Q f- Z ►- O 3 Q U _Z - LL J � � Q 7 m O C c °0 r m O c c W) o c z c W C.) m m Q LLJ OD C C it C A p m c E • W ° e F o ° C V � �) W O ` is O t0 ° O • m E m O T ao Vai Z E m �0 m A a c c�i E O Q d E m ` v O m m ti ~ Q o Z 4,Q v LL r w a '0 m c d o ►i L LL L c U. V m m o a c ` m _ r < M m Q CC V in U h- Q U Q N fA U) = O ZW Q Z O W � Za a ¢ O O J lL a m W Page 1 REQUEST FOR AUTHORIZATION AGENCY : CITY OF SAN BERNARDINO FLAG: LOCATOR: PROJ/AGR NO.: ( ) (DIST.,CO.,RTE.,AGCY.ABBREV.) EA: PROJ. LOCATION: MT. VIEW AVENUE BRIDGE CROSSING PREFIX: MISSION CREEK RESP AGENCY: CITY OF SAN BERNARDINO AND CITY OF REDLANDS EXEMPT _ or TYPE OF WORK: BRIDGE REHABILITATION CA Y— N X RTE: PM: THIS REQ.: PRE FOR: DEMONSTRATION PROJECTS: Estimated Construction Date FSTIP INTERGOVERNMENTAL RIGHT-OF-WAY FTIP/DATA REVIEW ESTIMATE TOTAL COST URBANIZED: 048 POP:_1 EXEMPT: Y COMMENT: _A R/W ACQ(Pcls): $ MPO: STATE OPR#: RAP (Furls): $ YEAR AREA IGR#: (Bus): $ APP. DATE: LRH/HRDSHP: $ ENVIRONMENTAL DATA SHEET NO. : TYPE: 1 UTILITIES: $ TIP NO (PPNO): EIS (Yr &#) SUPPORT: $ APPROVED TOTAL: $ RR XING#S INITIAL FED AUTHORIZATION RR-PUC#: PE Date: ENERGY: % TOPICS: RW Date: R/W CERT.: RR-FED #: CON Date: R/W CERT DATE: Prepared by: PHONE: -mA–Si F7 DATE: X95 T. JARB THAIPFJR Page 2 REQUEST FOR AUTHORIZATION PROJ/AGR NO: ( ) CMAQ Projects: Air Basin (Name & Code) 6098 SOUTH COAST Local Agency/State Comments: PROJ/AGR NO: ( ) DETAIL RECORD #/#: APPN: 114 LINE NUMBER: 10-19 URBAN/RURAL: COUNTY CODE: 071 CONGRESSIONAL DIST(S): 42 STATISTICAL DATA APPN COUNT NO OF RELOC PAY NUMBER OF: WORK CLASS 1 WORK TYPE (1-4) PENG LANES 4 FUNCTION CLASS : UP SAFETY/RR 2A STRUCTURES 1 FED AID SYS : U FED RES SYS Z BUSES/OTHER VEHICLES STATE SYS CONST BY C INTERSECTIONS IMPROVED MILES KILOMETERS PROJECTS LANE MILES LANE KILOMETERS CROSSINGS PROTECTED CROSSINGS IMPROVED TOTAL COST PARTICIPATING FEDERAL FUNDS COSTS PREV. OBLIG TRF/MGT/CNTRL PROJECTS 1 THIS REQ OPERATING PROGRAMS 1 TOTAL PARKING SPACES 0 BRIDGE #'S 54CO205 LPP 95-07 Exhibit A REENGINEERING, Attachment 1. Project Authorization/Federal Fund Obligation Page 4 REQUEST FOR AUTHORIZATION Verification Statement Federal Project Number Project Location MT. VIEW AVENUE BRIDGE CROSSING MISSION CREEK Type of Work BRIDGE REHABILITATION I declare that the facts and statements in this "Request for Authorization" of Federal funds are accurate and correct. This Agency has complied, or hereby agrees to comply, with the applicable terms and conditions set forth in (1) Title 23, U.S. Code, Highways, (2.) the Regulations issued pursuant thereto and (3) the policies and procedures promulgated by the Federal Highway Administrator relative to the above designated project. The amounts requested do not exceed the Federal funds provided to this agency in the FTIP. I understand that this Agency is responsible for costs in excess of the Federal funds to be obligated and that such obligation extends only to costs incurred by the Agency after it has received FHWA "Authorization to Proceed" with both authorization and obligation established for the project activity or phase involving such costs. _ This agency plans to begin invoicing for costs: • PR_ as incurred. (*PE or R/W phases) • after contract award. • Please initiate preparation of the Supplemental Agreement and PR-2: • upon authorization. Agreement checklist • after contract award attached in order that payments may be made. I understand that invoice requests for payment should not be submitted until both these documents have been aOGER d and exec ed. Signe G. RAV E Title DIRECTOR OF PUBLIC WORKS/ Date 2 17- ° I CITY ENGINEER Agency CITY OF SAN BERNARDINO PG _ �� LPP 95-07 Exhibit B REENGINEERING, Attachment 1. Project Authorization/Federal Fund Obligation Page 1 Project Prefix check list Federal Programs: Identify each fund type to be used for this project Prefix Program [XJ (STP) Surface Transportation Program [ ] (MA) Minimum Allocation [ ] (DB) Donor Bonus [ ] (BH) Bridge Rehabilitation [ ] (BR) Bridge Replacement [ ] (CM) Congestion Mitigation & Air Quality [ ] (AHL) Access Hwys to Public Rec. Areas [ ] (ER) Emergency .Relief [ ] (PLH) Public Lands Highway [ ] Demonstration Project Varies specify if known [ ] Other Describe Sub-Programs (Check all that Apply) [ ] (L) Local (Fund appropriation management) [ ] (S) State (State approp. management) not normally handled in OLP [ ] (1) On National Highway System (Currently all Principal Arterials) [ ] (R) Safety - Railroad [ ] (H) Safety - HES Program List Number [ ] (G) 100% Federal Funding (for Safety) [ ] (P) Bridge Painting [ ] (3 ) Bridge Rail replacement [ ] (Z) Seismic Retrofit - State Mandatory Pgm. [ ] (V) Seismic Retrofit - Voluntary Pgm. [ ] (E) TEA - Trans. Enhancement Activity Second vote request or Vote date Bridge (HBRR) only Sub-Programs [ ] (S) On System (Functional class greater than below) N (0) Off System (Local Street/Road or Rural minor collector) Additional State Funds involved (info only - does not affect prefix) [ ] TSM - Traffic System Management - Match _ Other _ [ ] SLTPP - St. & Loc. Trans. Partnership Prog. [ ] FCR - Flexible Congestion Relief [ ] Other Specify The prefix provides a quick summary of the funding programs and subprograms. • t LPP 95-07 Exhibit C REENGINEERING. Attachment 1. Project Authorization/Federal Fund Obligation Page 1 zO z o Z CL 0 z a z U O U ' C 0 O O 2 J ODO � Q O Q a W Q N O z J Q H O fr F- a W W J W J Y U Q Z f- O 3 Q Z LLB ,J O Q � • O 4 H. C • O m Q c N o — Qi O O C L z z W C.) m Q U _ C W W • Q� e • cm W E a° a t. ea `m 2 0 o a o A v ma oo �, m c Q C _ G U m • — m O • o e (a 2 E _ m m Q m c v E o c V w Q • 9 c L C m C U H O a E `° Q 2 � E m m 0 Q V U. Z C 3 i0 m m C d chi ` V LL L LL ` C LL W d t� G O C < Q X C m • • — t2 U- Q N !A to C O O � za n � a N • 0 G J li a Q