Description: Award contract - authorize transfer of funds - $6,500 - modify traffic
signals on "E" Street from 6th to 10th Streets
NOTICE OF:
A. Missing Document: 1. Exhibit/Attachment:
2. Public Works/Engineering
Bound Contract:
3. Staff Report:
B. Bad Ouality Original: X
C. Hand Written Original: X
D. Ordinance - Legal Advertisement
Proof of Publication Bad Ouality:
E. Ordinance - No Staff Report:
FOR ASSISTANCE: Should you have any questions on this matter, please do not hesitate to contact either Deputy City Clerk
Melanie Miller or Administrative Operations Supervisor Sandra Medina at (909) 384-5002.
Rachel Clark
City Clerk
RC:mam
DOCUMENT LOCATION:
FORMS/#2 scanning missing doe notice
Last Updated: 10/23/1997
CITY OF SAN BERN -ID' INO - REQUEST F'O'*1 COUNCIL ACTION
File No. 1 . 411
From: ROGER G. HARDGRAVE Subject: Award of Contract - Modification
of Traffic Signals on E Street,
Dept: Public Works from 6th St. to 10th St. , per
Plan No. 9285 ---
Date: 9-5-95 PAUL GARDNER CORPORATION
Synopsis of Previous Council action:
June, 1994 - Allocation of $50 , 000 in 1995/94 131 State SB 300
Fund, approved.
June, 1995 - Supplemental funds in amount of $15 , 000 approved in
1995/96 131 State SB 300 Fund.
.:A
Recommended motion:
1 . That the transfer of $6 , 500 , from Account No. 131-000-3405 ,
Unappropriated Reserves, " to Account No. 131-372-5504-1384 ,
"Traffic Signal Modification - 'E ' Street, from 6th Street to
10th Street, be approved.
AT3D
2 . Adopt resolution.
cc: Shauna Clark
Jim Penman
Signature
Contact person: Roger G Hardarave Phone: 5025
Staff Report, Report of
Supporting data attached: Bids, & Resolution Ward: 1 & 2
FUNDING REQUIREMENTS: Amount: $71 ,500 (State SB 300 Fund)
Source: (Acct. No.) 131-372-5504-1384
Acct. Description) Traffic Signal Modification -
"E" St. from 6th St. to 10th St.
Finance:
Council Notes: _ E �
/0/;t 19.5
T
75-0262 /y
Agenda Item Nn
CITY OF SAN BERNk DINO - REQUEST FGA COUNCIL ACTION
STAFF REPORT
Bids for modification of traffic signals on "E" Street,
from 6th Street to 10th Street, were opened at 2 : 00 p.m. ,
Tuesday, 8-22-95 .
A total of 5 bids were received, ranging from $66 , 647 to
$107 , 000 . The low bid of $66 , 647 is 66 . 6% above the Engineer' s
Estimate of $40 , 000 .
The low bidder was asked for suggestions to lower the
contract price. A response was received suggesting that the
spare part be eliminated, and PVC conduit be substituted for
metallic, for a total credit of $2 , 172 . We have reviewed these
items, and determined that they will not affect the service-
ability or durability of the project. Also that the proposed
credit is fair and reasonable for the work deleted. Approval of
Deductive Change Order No. One will serve to reduce the contract
price from $66 , 647 to $64 , 475 .
Below is an estimate of the total project cost, based
upon the actual low bid price as adjusted by Deductive Contract
Change Order No. One.
Construction Contract $ 64 , 475
Engineering & Inspection (W.O. #1384) 3 , 600
Sub-Total $ 68 , 075
Contingencies (5) ± 3 , 425
TOTAL ESTIMATED PROJECT COST $ 71 ,500
An amount of $65 , 000 has been allocated in the 1994/95
and 1995/96 SB 300 Fund Budgets, to finance the costs that will
be incurred for this project. Supplemental funding, in the
amount of $6 ,500, will be needed to fully finance the total
estimated project cost.
In view of the number of bids received, it appears that
the Engineer' s Estimate did not . fully reflect the current pricing
level for the work involved. Therefore, we recommend that a
contract be awarded for the low bid price, and the necessary
supplemental funding approved.
9-5-95
-0264
�z°
Q
N t`
w I m m
O a 0 LLJ
0
0
♦ m - Z O Z
LLJ
z
V �\ m a Ir _0
Q U- m a
o o
cc
o
J
v
�� \ U lvj , •` W
a
GA z
W
zl- M� m aQO J
1,, ['
z `►1 �v o m \ o U.
aA � >
0 0- \ a
a
J W w
v
O W 2 O Q
Z0m � Z O
0 < ccD z W V �' N ' I o Z
~ {L J Q �I
oyo�=
j a
O zl \ � � ►-. n z c
U F.. Ix I \ I Q w
t t
Zp ° z I j� v cn M z =
Q a W a O `V W Q 3
\ C7 O D
Q Z W
Q V U N U �f m f- W O
ui o LL w Z a n
in uj U I �� I z O O m
FO-- 1�1 (n m (/� I ( cV M t1f tp f� o0 01 O .�i .�-i .�-� .�-' O U 0 H
W Q m O
Lr�PARTMENT OF PUBLIC WORKS
Project: Modification of Traffic Signals on "E" Street from 6th
Street to 10th Street
File No. : 1 . 411
Plan No. : 9285
Date : 9-5-95
DEDUCTIVE CONTRACT CHANGE ORDER NO. ONE
TO: PAUL GARDNER CORPORATION
P. 0. Box 3730
Ontario, CA 91761
Gentlemen:
The contract documents for this project are hereby
amended, in accordance with the price quote dated 8-31-
95 , as set forth below:
1 . Eliminate spare parts required by Section
10-1. 14 of the special provisions, for a
deduction of - - - - - - - - - - - - $ (1 ,200)
2 . Substitute PVC conduit for runs 6 , 7 & 8 at
6th Street, for a deduction of - - - - ( 838)
3. Substitute PVC for all loop stub-outs, for
a deduction of - - - - ( 134)
TOTAL $ (2 ,172)
Total Extra Cost added to Contract $ (2 , 172)
Previous Contract Price 66 ,647
Amended Contract Price 64 ,475
Additional Time Granted to Complete all
Work Under Contract -0-
CONTRACTOR CITY OF SAN BERNARDINO
Accepted By Approved By
Director of Public
Title: Works/City Engineer
Date: Date: