HomeMy WebLinkAboutAS1- Public Works iV Y' C CITY OF SAN BERN RDINd - 1�_ EQUEST r °R COUNCIL ACTION Fi_,:: No. 1.291 ROGER G. HARDGRAVE C.. Approval of Contract Change Order From: �ubject: No. 3 - Improvement of Tippecanoe Avenue, "C" Street and Del Rosa C Public Works/Engineering Drive, per Plan No. 9053 - Install ATS Conduit -- Date: 8-18-94 MATICH CORPORATION Synopsis of Previous Council action: 06-01-92 -- Authorization granted by CDC to execute a Loan Guaran- tee Agreement with IVDA for loan of $800 , 000 from SANBAG. 07-06-92 -- Authorization granted for City to assume responsibility of a Consulting Engineer and execution of an Agreement for provision of these services . 12-07-92 -- Resolution No. 92-453 adopted authorizing execution of an Agreement with URS Consultants, Inc. for Phase I of services . 10-04-93 -- Resolution No. 93-382 adopted authorizing the Mayor to execute application to the Economic Development Agency for a grant. (Continued on second page) Recommended motion: That Change Order No. 3 to the contract with Matich Corporation, for the construction of Street Improvements on Tippecanoe Avenue, "C" St. (Sheppard Blvd. ) and Del Rosa Drive, in accordance with Plan No. 9053, be approved; to authorize the Contractor to install an ATS Communication conduit on Tippecanoe Ave. , "C" St. & Del Rosa Ave. , at an increase in the contract price of $95, 486. 87; from $4 , 247 , 813 . 00 to $4 , 343 , 299 . 87 . cc : Bill Bopf, IVDA Shauna Clark Barbara Pachon L%iff a re Contact person: Roger G. Hardgrave Phone: 5025 Supporting data attached: Staff Report, CCO #3 Ward: 1 FUNDING REQUIREMENTS: Amount: $95 , 486 . 87 (EDA Grant & IVDA) Source: (Acct. No.) 242-362-57291 Acct. Description) Street Improvements - Tippecanoe Avenue, "C" St. & Del Rosa Drive Finance: � Council Notes: `■rr 75-0262 Agenda Item No. A9 - 1 Public Works File No. 1 . 291 SYNOPSIS OF PREVIOUS COUNCIL ACTION (Continued) 01-24-94 -- Plans approved and authorization granted to advertise for bids . 03-21-94 -- Resolution No. 94-68 adopted authorizing execution of approval and award of grant. 05-02-94 -- Resolution No. 94-107 adopted authorizing execution cf Second Amendment to Agreement with URS Consultants, Inc. , for provision of construction staking services . 06-06-94 -- Resolution No. 94-130 adopted awarding a contract to Matich Corporation for the low bid price of $4, 113 , 313. 08-15-94 -- Change Orders No. ' s 1 & 2 approved, to authorize moving 11 trees at a cost of $104, 500 . 00 and relocating water lines at a cost not to exceed $30 , 000 . 8-18-94 CITY OF SAN BERN ' RDINO - REQUEST r "IR COUNCIL ACTION STAFF REPORT Extensive disussions were conducted with all known existing utility companies, relative to the improvement of Tippecanoe Avenue, "C" Street (Sheppard Boulevard) and Del Rosa Drive on the former Norton A.F.B. The purpose of these dis- cussions was to work out the details of how the "backbone" utility facilities , to serve the reuse of Norton, would be provided. It was decided that the necessary conduits, manholes, vaults, etc. would be installed in two trenches as a part of the street improvement contract. This arrangement would ensure that adequate utility facilities would be available to serve the new uses to be developed, and to allow all utilities to be under- ground. After construction was commenced, a request was received from ATS (formerly MCI and Western Union) that a conduit and appurtenant facilities be provided to allow them to install a communication cable. IVDA has reviewed this request, and de- termined that availability of this utility would enhance their efforts to attract new users . The Contractor has quoted a price of $95, 486 . 87 for furnishing and installing conduit and appurtenant facilities in one of the two utility trenches, for the ATS communication cable. We have reviewed this price, and feel that it is fair and reasonable for the work involved. A grant has been secured through the U.S. Department of Commerce, Economic Development Administration, to finance 75% of the total project cost. The 25% local agency share will be provided by IVDA. No City funds will be used to finance the cost of this project. The cost for the extra work will be charged to Account No. 242-362-57291 . The representative from the United States Economic De- velopment Administration has reviewed and approved this extra work. There is an approximate balance of $650, 000 in contin- gencies, that can be used to finance the cost of this change order. We recommend that Change Order No. 3 be approved. URGENCY CLAUSE: The Contractor has started work and this change order needs to be approved at the Council meeting of 9-6-94 , in order to avoid delaying the work. 8-18-94 75.0264 Federal Project No. 07-49-0262 CHANGE ORDER Order No: #3 Date: 8/17/94 Agreement Date: 2/7/94 NAME OF PROTECT: Street Improvements-Tippecanoe Avenue. "C" Street and 6th Street (Del Rosa Drive) OWNER: Citv of San Bernardino CONTRACTOR: Matich Corporation The following changes are hereby made to the CONTRACT DOCUMENTS: Perform the additional work of installing an ATS communication conduit (MCI/Western Union) in conjunction with the backbone utilities , located on Tippecanoe Avenue, "C" Street and Del Rosa Drive. The work shall be performed as directed by the Resident Engineer, in accordance with contract plans and specifications, and as indicated in Irish Construction' s letter of 7/18/94 (See attachment) Justification: The construction plans and specifications call for the installa- tion of conduits and pipeline for the entire backbone utility system within the project boundaries, however, the existence of the ATC communication svGtem on Norton A.F.B. was not identified as an existing utility until aster the project bid date. In order to provide a complete backbone utility system, the installation of the MCI/Western Union conduit will need to be installed. Change to CONTRACT PRICE: $ 95 , 486 . 87 Original CONTRACT PRICE:_ $4,113,313.00 Current CONTRACT PRICE adjusted by previous CHANGE ORDER: $- 4, 247 , 813 . 00 The CONTRACT PRICE due to this CHANGE ORDER will be (increased)(Aeenased) by e 95, 486 . 87 1*41 Nfto The new CONTRACT PRICE including this CHANGE ORDER will be - $_ 4.343,299.§7 Change to CONTRACT TIME: The CONTRACT TIME will be (increased) (decreased) by to be determined calendar days. The date for completion of all work will be revised date to be determined (Date) . Approvals Required: To be effective, this Order must be approved by the Federal agency if it changes the scope or objective of the PROJECT, or as may otherwise be required by the SUPPLEMENTAL GENERAL CONDITIONS. Contractor: Mat ch Corporation- Date Requested by: William L. Hopf, Executive Director Date Recommended by: Steven Enna, Construction Engineer Date Approved by: Roger Hardgrave, Director of Public Date Works/City Engineer Federal Agency Approval Date I" ISH CONSTRUCTIC'N ' 2641 RIVER AVENUE • POST OFFICE BOX 579 ROSEMEAD.CALIFORNIA 91770 FN�i1VEHSq�L Duly 18, '394 (818)288-8530 • TELECOPIER(819)573-5136 VIA FAX- (909) 824-2360 Original Via Mail •°�' . rur Mike Ussary RECEIVED JUL 2 1 1,964 MATICH CONSTRUCTION 1371 S. La Cadena Drive Colton, California 92324 RE: City of San Bernardino - Norton Air Force Base EDA Project No. 07-49-02680 ATS Portion and lowering of existing power and telephone manholes These units are in addition to original bid proposal dated Ma)I 6, 1994 G �{ UNIT BREAKDOWN FOR A.T.S. S 4 way trench —4 Off. fit` 5911 A 4.01 23,703.11 3 way trench 105 @ 3.52 369.60 2 way trench 30 @ 2.92 87.60 1 way trench 15 @ 6.07 91.05 Material 6061 Zr @ 5.63 34,123.43 3 x 5 x 4 w/H-20 hinged lids 8 2,537.00 20,296.00 3 x 1 1/4 sub duct 6061 1.86 11,273.46 89,944.25 a) Materials include 2-4" SCH 40 conduit, fittings, and sand shading (Irish Construction to furnish) b) Native backfill, 30" of cover with 90% compaction and 6" separation to other utilities. c) Excludes saw cutting and repave of CST, CSW or asphalt. d) Excess spoil to be left on job site II UNIT FOR LOWERING EXISTING POWER AND TELEPHONE MANHOLE$ I a) Lower the roof of power and telephone manholes 9,988.00 Nk b) Lower necking on power and telephone manholes 3,562.00 4 c) Lower necking on telephone manholes 1,530.00--' d) Lower necking on power manholes 2,142.00 e) Lower roof of telephone manhole 5,386.00 Remove roof of power manhole backfill with 1 sac slurry 305.00 Includes replacing frame and covers with H-20 frame and cover and all necessary materials. Assumptions: Existing duct runs will not have to be lowered Should you have any questions or require additional information, please do not hesitate to contact my office. Sincerely, IRISH CONSTRUCTION Lance Flejter Estimator LF:ku SINCE 1919 ROSEMEAD,IRVINE,SAN MARCOS,RIVERSIDE,VENTURA,SACRAMENTO,FRESNO STATE CONTRACTOR'S LICENSE NO.97962