CITY OF SAN BERN RDINd - 1�_ EQUEST r °R COUNCIL ACTION
Fi_,:: No. 1.291
ROGER G. HARDGRAVE C.. Approval of Contract Change Order
From: �ubject: No. 3 - Improvement of Tippecanoe
Avenue, "C" Street and Del Rosa
C Public Works/Engineering Drive, per Plan No. 9053 -
Install ATS Conduit --
Date: 8-18-94 MATICH CORPORATION
Synopsis of Previous Council action:
06-01-92 -- Authorization granted by CDC to execute a Loan Guaran-
tee Agreement with IVDA for loan of $800 , 000 from
SANBAG.
07-06-92 -- Authorization granted for City to assume responsibility
of a Consulting Engineer and execution of an Agreement
for provision of these services .
12-07-92 -- Resolution No. 92-453 adopted authorizing execution of
an Agreement with URS Consultants, Inc. for Phase I of
services .
10-04-93 -- Resolution No. 93-382 adopted authorizing the Mayor to
execute application to the Economic Development Agency
for a grant.
(Continued on second page)
Recommended motion:
That Change Order No. 3 to the contract with Matich Corporation,
for the construction of Street Improvements on Tippecanoe Avenue,
"C" St. (Sheppard Blvd. ) and Del Rosa Drive, in accordance with
Plan No. 9053, be approved; to authorize the Contractor to install
an ATS Communication conduit on Tippecanoe Ave. , "C" St. & Del Rosa
Ave. , at an increase in the contract price of $95, 486. 87; from
$4 , 247 , 813 . 00 to $4 , 343 , 299 . 87 .
cc : Bill Bopf, IVDA
Shauna Clark
Barbara Pachon L%iff a re
Contact person: Roger G. Hardgrave Phone: 5025
Supporting data attached: Staff Report, CCO #3 Ward: 1
FUNDING REQUIREMENTS: Amount: $95 , 486 . 87 (EDA Grant & IVDA)
Source: (Acct. No.) 242-362-57291
Acct. Description) Street Improvements - Tippecanoe
Avenue, "C" St. & Del Rosa Drive
Finance: �
Council Notes:
`■rr
75-0262 Agenda Item No. A9 - 1
Public Works
File No. 1 . 291
SYNOPSIS OF PREVIOUS COUNCIL ACTION (Continued)
01-24-94 -- Plans approved and authorization granted to advertise
for bids .
03-21-94 -- Resolution No. 94-68 adopted authorizing execution of
approval and award of grant.
05-02-94 -- Resolution No. 94-107 adopted authorizing execution cf
Second Amendment to Agreement with URS Consultants,
Inc. , for provision of construction staking services .
06-06-94 -- Resolution No. 94-130 adopted awarding a contract to
Matich Corporation for the low bid price of $4, 113 , 313.
08-15-94 -- Change Orders No. ' s 1 & 2 approved, to authorize moving
11 trees at a cost of $104, 500 . 00 and relocating water
lines at a cost not to exceed $30 , 000 .
8-18-94
CITY OF SAN BERN ' RDINO - REQUEST r "IR COUNCIL ACTION
STAFF REPORT
Extensive disussions were conducted with all known
existing utility companies, relative to the improvement of
Tippecanoe Avenue, "C" Street (Sheppard Boulevard) and Del Rosa
Drive on the former Norton A.F.B. The purpose of these dis-
cussions was to work out the details of how the "backbone"
utility facilities , to serve the reuse of Norton, would be
provided.
It was decided that the necessary conduits, manholes,
vaults, etc. would be installed in two trenches as a part of the
street improvement contract. This arrangement would ensure that
adequate utility facilities would be available to serve the new
uses to be developed, and to allow all utilities to be under-
ground.
After construction was commenced, a request was received
from ATS (formerly MCI and Western Union) that a conduit and
appurtenant facilities be provided to allow them to install a
communication cable. IVDA has reviewed this request, and de-
termined that availability of this utility would enhance their
efforts to attract new users .
The Contractor has quoted a price of $95, 486 . 87 for
furnishing and installing conduit and appurtenant facilities in
one of the two utility trenches, for the ATS communication cable.
We have reviewed this price, and feel that it is fair and
reasonable for the work involved.
A grant has been secured through the U.S. Department of
Commerce, Economic Development Administration, to finance 75% of
the total project cost. The 25% local agency share will be
provided by IVDA. No City funds will be used to finance the cost
of this project.
The cost for the extra work will be charged to Account
No. 242-362-57291 .
The representative from the United States Economic De-
velopment Administration has reviewed and approved this extra
work.
There is an approximate balance of $650, 000 in contin-
gencies, that can be used to finance the cost of this change
order.
We recommend that Change Order No. 3 be approved.
URGENCY CLAUSE:
The Contractor has started work and this change order needs to be
approved at the Council meeting of 9-6-94 , in order to avoid
delaying the work.
8-18-94
75.0264
Federal Project No. 07-49-0262
CHANGE ORDER
Order No: #3
Date: 8/17/94
Agreement Date: 2/7/94
NAME OF PROTECT: Street Improvements-Tippecanoe Avenue. "C" Street
and 6th Street (Del Rosa Drive)
OWNER: Citv of San Bernardino
CONTRACTOR: Matich Corporation
The following changes are hereby made to the CONTRACT DOCUMENTS:
Perform the additional work of installing an ATS communication
conduit (MCI/Western Union) in conjunction with the backbone
utilities , located on Tippecanoe Avenue, "C" Street and Del Rosa
Drive. The work shall be performed as directed by the Resident
Engineer, in accordance with contract plans and specifications,
and as indicated in Irish Construction' s letter of 7/18/94 (See
attachment)
Justification:
The construction plans and specifications call for the installa-
tion of conduits and pipeline for the entire backbone utility
system within the project boundaries, however, the existence of
the ATC communication svGtem on Norton A.F.B. was not identified
as an existing utility until aster the project bid date. In order
to provide a complete backbone utility system, the installation of
the MCI/Western Union conduit will need to be installed.
Change to CONTRACT PRICE: $ 95 , 486 . 87
Original CONTRACT PRICE:_ $4,113,313.00
Current CONTRACT PRICE adjusted by previous CHANGE ORDER: $- 4, 247 , 813 . 00
The CONTRACT PRICE due to this CHANGE ORDER will be (increased)(Aeenased)
by e 95, 486 . 87
1*41
Nfto
The new CONTRACT PRICE including this CHANGE ORDER will be -
$_ 4.343,299.§7
Change to CONTRACT TIME:
The CONTRACT TIME will be (increased) (decreased) by to be
determined calendar days.
The date for completion of all work will be revised date to be
determined (Date) .
Approvals Required:
To be effective, this Order must be approved by the Federal agency
if it changes the scope or objective of the PROJECT, or as may
otherwise be required by the SUPPLEMENTAL GENERAL CONDITIONS.
Contractor:
Mat ch Corporation- Date
Requested by:
William L. Hopf, Executive Director Date
Recommended by:
Steven Enna, Construction Engineer Date
Approved by:
Roger Hardgrave, Director of Public Date
Works/City Engineer
Federal Agency Approval
Date
I" ISH CONSTRUCTIC'N
' 2641 RIVER AVENUE • POST OFFICE BOX 579
ROSEMEAD.CALIFORNIA 91770 FN�i1VEHSq�L
Duly 18, '394 (818)288-8530 • TELECOPIER(819)573-5136
VIA FAX- (909) 824-2360
Original Via Mail •°�'
. rur
Mike Ussary RECEIVED JUL 2 1 1,964
MATICH CONSTRUCTION
1371 S. La Cadena Drive
Colton, California 92324
RE: City of San Bernardino - Norton Air Force Base EDA Project No. 07-49-02680
ATS Portion and lowering of existing power and telephone manholes
These units are in addition to original bid proposal dated Ma)I 6, 1994 G
�{
UNIT BREAKDOWN FOR A.T.S. S
4 way trench —4 Off. fit` 5911 A 4.01 23,703.11
3 way trench 105 @ 3.52 369.60
2 way trench 30 @ 2.92 87.60
1 way trench 15 @ 6.07 91.05
Material 6061 Zr @ 5.63 34,123.43
3 x 5 x 4 w/H-20 hinged lids 8 2,537.00 20,296.00
3 x 1 1/4 sub duct 6061 1.86 11,273.46
89,944.25
a) Materials include 2-4" SCH 40 conduit, fittings, and sand shading (Irish Construction to furnish)
b) Native backfill, 30" of cover with 90% compaction and 6" separation to other utilities.
c) Excludes saw cutting and repave of CST, CSW or asphalt.
d) Excess spoil to be left on job site
II UNIT FOR LOWERING EXISTING POWER AND TELEPHONE MANHOLE$
I a) Lower the roof of power and telephone manholes 9,988.00
Nk b) Lower necking on power and telephone manholes 3,562.00
4 c) Lower necking on telephone manholes 1,530.00--'
d) Lower necking on power manholes 2,142.00
e) Lower roof of telephone manhole 5,386.00
Remove roof of power manhole backfill with 1 sac slurry 305.00
Includes replacing frame and covers with H-20 frame and cover and all necessary materials.
Assumptions: Existing duct runs will not have to be lowered
Should you have any questions or require additional information, please do not hesitate to contact my office.
Sincerely,
IRISH CONSTRUCTION
Lance Flejter
Estimator