Loading...
HomeMy WebLinkAbout07- Public Works CITY OF SAN BERK_ARDINO - REQUEST I _ )R COUNCIL ACTION File No. 1.888 Approval of Contract Change Order From: ROGER G. HARDGRAVE Subject: No. 1 - Improvement of Del Rosa Avenue, from Date Street to Dept: Public Works Carpenter Street, per Plan No. 8575 -- Date: 6-15-93 RANCO CORPORATION -Synopsis of Previous Council action: June, 1992 - Allocation of $50 , 000 in 1991/92 Street Construction Fund Budget approved. June, 1992 - Supplemental allocation of $14 , 000 in 1992/93 Street Construction Fund Budget approved. 08-17-92 -- Resolution No. 92-340 adopted awarding a contract to Ranco Corporation, for low bid price of $40 , 001 . 15 . Recommended motion: That Change Order No. One to the contract with Ranco Corporation, for improvement of Del Rosa Avenue, from Date Street to Carpenter Street, in accordance with Plan No. 8575 , be approved; to compen- sate the Contractor for extra thick asphalt concrete, deletion of striping, and settlement of all outstanding claims, for a net increase in the contract price of $4, 786 . 36 , from $40 , 001 . 15 to $44 , 787 . 51 . cc: Shauna Clark Frank Rhemrev nature Contact person:_ Roger G. Hardqrave Phone: 5025 Supporting data attached: Staff Report, CCO #1 Ward: 4 & 7 FUNDING REQUIREMENTS: Amount: $4 , 786 . 36 (Street Construction Fund) Source: (Acct. No.) 242-362-57888 Acct. Description) Del Rosa Ave ue N/0 Pgte St. Finance- Council Notes: 75-0262 Agenda Item No. CITY OF SAN BERN. .RDINO - REQUEST F-*4'R COUNCIL ACTION STAFF REPORT Page 1 of 2 The plans for improvement of Del Rosa Avenue, between Date Street and Carpenter Street, direct the Contractor to remove a portion of the existing pavement. During the removal opera- tion, pavement up to 15 inches in thickness was encountered. A request for additional compensation was submitted by the Contractor, due to the extra work involved in breaking up, loading and disposing of the thicker than normal pavement. A price of $3 ,706 . 36 was negotiated to compensate the Contractor for removing the 434 tons of asphalt concrete, that was in excess of a normal thickness of 7 inches. In addition, a price of $3, 630 . 00 was negotiated to compensate the Contractor for the extra 30 hours to break up the thicker than normal pavement. The low bid contained a lump sum price of $2 , 200 . 00 for roadway excavation. Since the pavement was thicker than expected, less dirt had to be excavated to reach the design subgrade elevation. Therefore, the negotiations with the Con- tractor included a reduction of this lump sum price for roadway excavation, from $2 , 200 . 00 to $1 , 100 . 00 . Striping was to be done under Bid Item No. 15 , for the low bid lump sum price of $2, 000. 00 . Traffic signals were to be installed, at the intersection of Del Rosa Avenue and Date Street, by the developer of an adjoining parcel. Striping was included in this project, but was different than the striping shown on the plans for the improvement of Del Rosa Avenue. The Contractor was, therefore, directed not to install the striping. The low bid price of $2 , 000 for striping was included in the change order negotiated with the Contractor as a credit. A proposed change order was accordingly prepared for the following items: 1 . Remove Extra Thick Asphalt Concrete $ 3 , 706 . 36 2 . Additional Effort to Break Asphalt Concrete 3 , 630 . 00 3. Decreased Quantity of Roadway Excavation (11100 . 00) 4 . Credit for Deletion of Striping (2, 000 . 00) TOTAL NET ADDITIONAL COST $ 4 , 236 . 36 6-16-93 75-0264 CITY OF SAN BERW ADINO - REQUEST F IR COUNCIL ACTION STAFF REPORT Page 2 of 2 Approval of this change order would have increased the contract price from $40 , 001 . 15 to $44 , 237 . 51 . However, the Contractor declined to sign this change order. A claim for additional compensation of $12 , 432 . 06 was submitted by Ranco' s attorney. Our City Attorney' s office has negotiated a settlement with the Contractor' s attorney. This settlement is for a reduction of $550 . 00 in the credit for roadway excavation, instead of $1 , 100 . 00 originally negotiated with the Contractor. In view of the considerable staff time already invested in negotiations and responding to the claims by the Contractor' s attorney, we recommend that the settlement of an additional $550 . 00 be accepted, in order to allow this project to be closed. 6-16-93 75-0264 C I T Y O F S A N B E R N A R D I N O DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION Project: STREET IMPROVEMENTS ON DEL ROSA DRIVE FROM DATE STREET TO CARPENTER STREET File No. : 1.888 Plan No. : 8575 Date: 6/10/93 CONTRACT CHANGE ORDER NO. ONE TO: RANCO CORPORATION P.O. BOX 9007 Brea, CA 92621 I Gentlemen: You are hereby authorized and directed to perform the following work: 1) Removal of the extra thick asphalt concrete(in excess of 7 inches) , 434 tons @ $8.54/ton, at a cost of . . . . . . . $ 3,706.36 2) Additional work required in breaking and removing the extra thick asphalt - ( backhoe w/hammer and operator for 30 hours, @ $121/HR) , at a cost of $ 3,630.00 3) Reduce the contract lump sum price for Bid Item No. 2, "Unclassified Excavation" , (to reflect the reduction in actual dirt removed due to the thicker than normal asphalt) , from $2,200.00 to 1, 650.00 . . . . . . . . . . . . . . . . . . . ($ 550.00) 4) Delete Bid Item No. 15, "Striping" from contract, at a reduction in the contract price, at the lump sum price of $2 , 000. 00 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ($ 2,000.00) Approval of this change order constitutes settlement of all outstanding claims for extra work in connection with the improvements installed under this contract. Total Extra Work Cost added to Contract . . . . . . . . .$ 4,786.36 Previous Contract Price . . . . . . . . . . . . . . . . . . . . . . . . .$ 40,001.15 Amended Cost Price . . . . . 0000 . . . . . . . . . . . . . . . . . . . . .$ 44,787.51 Additional time to complete Contract due to Change Order -0-Workinc Days CONTRACTOR CITY OF SAN BERNARDINO Accepted Recommended By: By: • ROGER G. HARDGRAVE DATE Title: Director of Public Works/City Engr Date: