HomeMy WebLinkAbout06- Development Department D E V E L O P M E N T D E P A R T M E N T
OF THE CITY OF SAN BERNARDINO
REQUEST FOR COMMISSION/COUNCIL ACTION
From: KENNETH J. HENDERSON Subject:"E^STREET TERRACE
Executive Director CONCEPTUAL DESIGN
Date: July 12, 1993
-------------------------------------------------------------------------------
Synopsis of Previous Commission/Council/Committee Action(s):
On July 8, 1993, the Redevelopment Committee recommended to the
Community Development Commission that Concept Alternative Design #2
for "E" Street Terrace be selected and developed into construction
drawings and advertised for bids.
------------------------------------------------------------------------------
Recommended Motion(s):
(Community Development Commission)
That the Community Development Commission select Conceptual
Alternative Design #2 for the completion of the "E" Street Terrace
and authorize the Executive Director to develop Alternative Design
#2 into construction drawings and advertise for bids for subsequent
consideration by the Commission.
/1?- --
Adminjitrator KENNETH J. HENDERSON
Executive Director
-------------------------------------------------------------------
Contact Person(s): Ken Henderson/David J. Norman Phone: 5081
Project Area(s): Central City North Ward(s): One
Supporting Data Attached: Staff Report
FUNDING REQUIREMENTS: Amount: $ N/A Source: N/A
Budget Authority: N/A
------------------------------------------------------
Commission/Council Notes:
-----------------------------------
----------------
DJN:rg:3207J COMMISSION MEETING AGENDA
Meeting Date: 7/19/1993
Agenda Item Number:
D E V E L O P M E N T D E P A R T M E N T
OF THE CITY OF SAN BERNARDINO
STAFF REPORT
"E" Street Terrace, Conceptual Design
Staff seeks Community Development Commission approval of one of three
conceptual designs developed by TSA Landscape Architecture for the
construction of the "E" Street Terrace. Staff also seeks authorization
to advertise for bids for the construction of this concept after
entitlements and permits have been acquired.
I
"E" Street Terrace
The construction of a pedestrian transition space connecting the
Convention Center Court with Court Street Square (see Exhibit "A") was
identified by Project For Public Spaces (PPS) through the process of
formulating the Downtown Plan. Originally envisioned as an amphitheatre,
staff believes this space functions better as a stairway with attached
seating spaces. This space used as a shady pleasant seating area for
lunch time "brown baggers" and others can be easily utilized as a small
public performance space.
Conceptual Designs
On April 7, 1993, the Redevelopment Committee approved the contracting of
TSA Landscape Architecture for the preparation of preliminary design,
final design, construction drawings and specifications for the
construction of the "E" Street Terrace. Since that time, TSA has
developed three conceptual designs, each of which is attached:
Conceptual Alternative Design No. 1 (see Exhibit "B") is a ramping
concept that allows easy access for mobility impaired individuals, and
also allows for enhanced seating areas. The Engineer's estimate for this
concept is $74,200. Although this concept allows for easy mobility
between Court Street Square and the Convention Center Court, it does not
allow for any performance space. Further, staff concerns about the
design and its attraction to skate board users appears to be a reasonable
apprehension. Due to the lack of flexibility and the higher cost
associated with constructing this concept, staff does not recommend this
option.
-------------------------------------------------------
DJN:rg:3207J COMMISSION MEETING AGENDA
Meeting Date: 7/19/1993/_
Agenda Item Number: C�
DEVELOPMENT DEPARTMENT STAFF REPORT
"E" STREET TERRACE CONCEPTUAL DESIGN
July 12, 1993
Page Number —2—
Conceptual Alternative Design No. 2 (see Exhibit "D") offers what staff
believes to be the best combination of pedestrian access, performance
space and cost. The design invites pedestrians to cross between the
Convention Center Court and Court Street Square. Mobility impaired
access is provided from the Convention Center using its interior
elevator. At the same time, it possesses a flexible seating area which
can be used as an intimate performance or display space. The Engineer's
estimate of $47,000 is the least expensive of the three concepts
presented. Staff recommends that the Agency proceed with the full design
of construction drawings for this alternative. The drawings will then be
advertised and the resulting bids brought back to the Commission for
award consideration.
Conceptual Alternative Design No. 3 (see Exhibit "C") offers a stepped
transition and vine covered arbor from Court Street Square to the
Convention Center Court and affords the opportunity for a performance
space. Unfortunately, when viewed from the lower court, the trellis
obstructs the view of Court Street Square and creates the feeling of a
barrier rather than inviting movement and interaction between the two
areas. Also this concept is estimated to be the most costly at
approximately $82,000. Staff does not recommend this option.
Based upon the staff analysis, a summary of which is provided above,
y staff recommends adoption of the form motion.
KEN1 J. 2RSON, Executive Director
Development Department
------------------------------------------------
DJN:rg:3207J COMMISSION MEETING AGENDA
Meeting Date: 7/19/1993
Agenda Item Number: /
i PA O
1 MIXED U!E
NTERTAINMENT(AMPLE AU iO t
ORN PHASE I C CI C) OFFI(� 1
c.LJ (
THEATER
* a 9FTtCE
1R tJ tt as `
� ---- 7
b AIL sAr,lc
iU RETAIL
nQ Es
tj
q ,
< A T
A� RETAIL
Dili
ri
Court Street Square U"
Q
"E' Street Terrace
Jr
1
1
Convention Center HALL '
i
1
• i
i
HOTEL 1
1
5 1
1
1
t�
1
RETAIL
1
1 i
1
1
. 1 -
PARICINO
1
RETAIL
t
i
1 2ND STREET
� 1
1
EXHIBIT "A"
• • fig— ,�,•�`�� s r�–��
-
46• '
it
Ift
•YTji
.s
Aw
41�
IRV
K
kg
P{{
sti.. �1 ;; 1 •
.w
V
• i3 t � r i�JSi. � 1
j7oX-Z'Art
ILL
�•aT 'lk
•