From: Wayne Overstreet, Supt. Subject: APPROVAL OF A CONTRACT TO SEAL LEAKS IN
Public Buildings/Parking Control CONVENTION CENTER ROOF
Dept:
Date: JANUARY 21, 1988
Synopsis of Previous Council action:
NONE
Recommended motion:
I . That the Mayor and Common Council approve the attached resolution for a
sole source contract.
2. Authorize and direct the City Attorney to prepare sole source contract document
and authorize and direct the Mayor to execute said contract on behalf of the
City.
3. That the RDA Board authorize and approve e p nditure of 19 .75 from the
RDA funding source.
ignature
Contact person: Wayne Overstreet Phone: 384-5244
Supporting data attached: Resolution and contract estimates Ward: 1
FUNDING REQUIREMENTS: Amount: $36,198.75
To be determined at RDA Committee Meeting to
Source: (ACCT. NO. ) be held 1/21/88 with the confirmation of the
Community Development Commission on 1/25/88
(ACCT. DESCRIPTION)
Finance:
Council Notes:
Ck i"Y OF SAN BERNARDidO - REQUkST FOR COUNCIL A ION
STAFF REPORT
The City, Redevelopment Agency (RDA) , and Maruko Corp. entered into
an owner participation and development agreement on July 20, 1987 for
the purchase of the Hotel and lease of the Convention Center. This
agreement required the lessor, City of San Bernardino, to maintain
and repair, at its own expense, the Convention Center structural
roof, exterior walls, and interior load bearing walls in first class
condition, and to repair any and all known leaks to the structure
upon notification of the lessee.
KOAR Inc. , Maruko Inc. , and Mitsubishi Corp. have notified the city
of several major leaks in the Convention Center roof areas (9-22-87) .
During the negotiations, this problem was identified and referenced
agreement required the city to repair these known leaks. Also, to
sign, re-stripe and paint the 5 level parking structure.
The RDA at that time made a commitment to provide the funds that we
estimated to be approximately $100, 000 to meet this financial obli-
gation at a June 16, 1987 meeting.
The city staff, Public Buildings, has been attempting to obtain a
contract to perform the necessary work on the repair of the leaks at
the Convention Center roof that would provide a warranty for such
expensive repairs.
We have only been able to obtain proposals and estimates from one
company who would guarantee such repairs for a three year period
which was B. R. S Construction Inc. This contractor has proposed such
repair, under certain conditions, in three phases, at a cost of:
PHASE I . . . . . . . . . . . . . . . . . . . . $ 12,550. 00
PHASE II . . . . . . . . . . . . . . . . . . . $ 17,480. 00
PHASE III . . . . . . . . . . . . . . . . . . $ 6, 168. 75
TOTAL . . . . . . . . . . . . . . . . $ 36,198.75
PROJECT ESTIMATE
REF: PROJECT SITE NUMBER 1 .
RECTANGULAR PLANTER BOX AREA, LOCATED WEST OF CITY HALL
MAIN BLDG. COMPLEX, AND RUNNING FROM NORTH TO SOUTH. AREA
IS APPRX. 25 FEET WIDE AND 70 FEET LONG. (THIS AREA IS
OUTLINED IN YELLOW ON DRAWING. ) THIS AREA IS TO BE TREATED
FOR THE PURPOSE OF STOPPING WATER INTRUSION INTO FACILITIES
LOCATED BENEATH DECK AND PLANTER BOX.
REF: PROJECT SITE NUMBER 2.
RECTANGULAR PLANTER BOX AREA, LOCATED WEST OF CITY HALL
MAIN BLDG. COMPLEX, AND RUNNING FROM EAST TO WEST. AREA IS
APPRX. 30 FEET WIDE BY 105 FEET LONG. (THIS AREA IS OUT-
LINED IN GREEN ON DRAWING. ) THIS AREA IS TO BE TREATED FOR
THE PURPOSE OF STOPPING WATER INTRUSION INTO FACILITIES
LOCATED BENEATH DECK AND PLANTER BOX.
REF: PROJECT SITE NUMBER 3 .
PREVIOUS PLANTER BOX AREA, THAT HAS BEEN FILLED IN AND
COVERED OVER WITH PAVERS. THIS AREA IS LOCATED ACROSS FROM
THE SOUTH WEST CORNER OF THE CITY HALL BLDG. , AND ADJACENT
TO THE NORTH EAST CORNER OF HOTEL FACILITY. THIS AREA IS
APPRX. 21 FEET WIDE AND 25 FEET LONG. (SHADED IN RED ON
DRAWING. ) THIS AREA IS TO BE TREATED FOR THE PURPOSE OF
STOPPING WATER INTRUSION INTO FACILITIES LOCATED BENEATH
DECK AREA.
The City would be obligated through coordination with KOAR, Muruko
and Mitsubishi for removing and replacing ceiling tile, dry wall,
etc. if it were necessary to inject certain areas from below the deck
area KOAR and Sacon construction has notified the City that they plan
to do major renovation in the Convention Center area floors, walls,
ceiling etc. that could be severely damaged if this work is not
completed prior to February 20, 1988 and could subject the City to
severe liability.
Based upon the limited time to accommodate this repair, it is recom-
mended that.
1. The Council approve the attached resolution for a sole
source contract since there is only one source available
for such work and competitive biding would work an incon-
gruity, by unavailing, produce no advantage and service no
legitimate purpose, and the contract hereby awarded to said
bidder and the Mayor of the City of San Bernardino be
authorized to execute said contract on behalf of the city.
2. That the allocation of funds for contract be authorized
from RDA funding sources.
B. R. S. C O N S T R U C T I O N I N C.
4 1 5 3 G 0 T H B E R G S T R E E T
N 0. H I G H L A N D S, C A L I F.
Z IP. 9 5 6 6 0
PHONE NO. 916 331-3755
--------------------------------------------------------------
CALIFORNIA CONTRACTORS LIC. NO. 360292
PROJECT ESTIMATE
CUSTOMER: MR. GILBERT V. HALL DATE: 1 / 9 /88
CITY OF SAN BERNARDINO
300 NORTH "D " STREET
SAN BERNARDINO , CALIF . 92418
REF ; PROJECT SITE NUMBER 1 .
PROJECT: RECTANGULAR PLANTER BOX AREA , LOCATED WAIST OF CITY HALL MAIN
BLDG. COMPLEX, AND RUNNING FROM NORTH TO SOUTH . AREA IS
APROX. 25 FEET WIDE AND 70 FEET LONG. (THIS AREA IS
OUTLINED IN YELLOW ON DRAWING . ) THIS AREA IS TO BE TREATED
FOR THE PURPOSE OF STOPING WATER INTRUSION INTO FACILITIES
LOCATED BENEATH DECK AND PLANTER BOX.
H . R. S . CONST . INC . WILL FURNISH ALL MATERIAL , LABOR , AND EQUIPT . FOR THE
INJECTION OF PENE -GROUT WATER REACTIVE URATHANE GROUT . THIS WORK WOULD
PRIMARILY BE CONDUCTED FROM ABOVE GROUND , HOWEVER IF IT SHOULD BE NECESSARY TO
INJECT CERTAIN AREAS FROM BELOW THE DECK AREA IT WILL BE THE RESPONSIBILITY OF
THE CITY FOR REMOVING, AND REPLACING, OF CEILING TILES , DRYWALL , ETC . .
ESTIMATED COST FOR ABOVE PROJECT: $ 12 , 5 5 0 . 0 0
PROJECT WARRANTY PERIOD: T H R E E Y E A R S
PROJECT ESTIMATE BY:
01VNIE jr SF RD f . R. S. CONST. INC.
v
B. R. S. C O N Sc T R U C T I 0 N I N C.
4 1 5 3 G 0 T H B E R G S T R E E T
N 0. H I G H L A N D S, C A L I F.
Z IP. 9 5 6 6 0
PHONE NO. 916 331-3755
--------------------------------------------------------------
CALIFORNIA CONTRACTORS LIC. NO. 360292
PROJECT ESTIMATE
CUSTOMER: MR . GILBERT V. HALL DATE:
CITY OF SAN BERNARDINO
300 NORTH "D " STREET
SAN BERNARDINO , CALIF . 92418
REF ; PROJECT SITE NUMBER 2 .
PROJECT: RECTANGULAR PLANTER BOX AREA , LOCATED WIEST OF CITY HALL MAIN
BLDG . COMPLEX , AND RUNNING FROM EAST TO WEST , AREA IS
APROX. 30 FEET WIDE BY 105 FEET LONG . (THIS AREA IS
OUTLINED IN GREEN ON DRAWING . ) THIS AREA IS TO BE TREATED
FOR THE PURPOSE OF STOPING WATER INTRUSION INTO FACILITIES
LOCATED BENEATH DECK AND PLANTER BOX.
B . R . S . COSST , INC . WILL FURNISH ALL MATERIAL , LABOR , AND E9,UIPT . FOR THE
INJECTION OF PENE- GROUT WATER REACTIVE ITRATHANE GROUT . THIS WORK WOULD
PRIMARILY BE CONDUCTED FROM ABOVE GROUND , HOWEVER IF IT SHOULD BE NECESSARY TO
INJECT CERTAIN AREAS FROM BELOW THE DECK AREA IT WILL BE THE RESPONSIBILITY OF
THE CITY FOR REMOVING , AND REPLACING OF CEILING TILES , DRYWALL , ETC ,
ESTIMATED COST FOR ABOVE PROJECT: $ 17 , 4 8 0 . 0 0
PROJECT WARRANTY PERIOD: T H R E E Y E A R S
PROJECT ESTIMATE BY.
LONNIE J. L B. R. Si CONST.' INC.
B. R. S. C O N S T R U C T I O N I N C.
4 1 5 3 G 0 T H B E R G S T R F F. T
N 0. H I G H L A N D S, C A L I F
Z I P 9 5 6 6 0
PHONE NO. (916) 331-3755
---------------------------------------------------------------------
CALIFORNIA CONTRACTORS LIC. NO. 360292
PROJECT ESTIMATE
CUSTOMER: MR. GILBERT V. HALL DATE: 1 / 9 / 88
CITY OF SAN BERNARDINO
300 NORTH "D" STREET
SAN BERNARDINO , CALIF . 92418
REF ; PROJECT SITE NUMBER 3 .
PROJECT: PREVIOUS PLANTER BOX AREA , THAT HAS BEEN FILLED IN AND COVERED OVER
WITH PAVERS . THIS AREA IS LOCATED ACROSS FROM THE SOUTH WEST CORNER
OF THE CITY HALL BLDG. , AND ADJACENT TO THE NORTH EAST CORNER OF
HOTEL FACILITY. THIS AREA IS APROX. 21 FEET WIDE AND 25 FEET LONG.
(SHADED IN RED ON DRAWING. ) THIS AREA IS TO BE TREATED FOR THE
PURPOSE OF STOPING WATER INTRUSION INTO FACILITIES LOCATED BENEATH
DECK AREA.
B . R. S . CONSTRUCTION INC . WILL FURNISH ALL MATERIAL , LABOR , AND EQUIPT . FOR THE
INJECTION OF PF.NF.-GROUT WATER REACTIVE URATHANE GROUT . THIS WORK WILL
PRIMARILY BE CONDUCTED FROM ABOVE GROUND , HOWEVER IF IT SHOULD BE NECESSARY To
INJECT CERTAIN AREAS FROM BELOW THE DECK AREA IT WILL BE THE RESPECTABILITY OF
THE CITY FOR REMOVING , AND REPLACING OF CEILING TILES , DRYWALL , ETC.
COST ESTIMATE FOR ABOVE PROJECT: $ 6 , 168 . 75
PROJECT WARRANTY PERIOD: THREE YEARS .
PROJECT ESTIMATED BY:
ONNIE J. FORD / B . S. CONST. INC. :