Loading...
HomeMy WebLinkAbout02- Public Works's s. File No . 2 . 1190 CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION i '� / t -T VV From: ROGER G . HARDGRAVE ~"I'e`� • fbject: Approval of Change Order No . `01 --Construction of Fire Station in Dept: Public Works/Engineering' Gl � Tri -City Corporate Complex , per Plan No . 7270 -- MARTIN JASKA, Date: 12-23-87 INC . I Synopsis of Previous Council action: 05- 19-86 --- Resolution No . 86-185 adopted authorizing execution of an Agreement with Kurt Meyer for architectural services . 09-23-86 --- Report on preliminary results of geotechnical investiga- tion by Geofon , Inc . , accepted and filed . 11-17-86 --- Status report on total estimated cost overrun of $165 ,000, referred to Legislative Review Committee . 07-06-87 --- Findinq made that construction of fire station is needed for health and safety reasons . 08-03-87 -- Negative declaration certified . 08-03-87 --- Plans approved and authorization granted to advertise for bids . ( Continued on second page) Recommended motion: That Change Order No . Two to the contract with Martin Jaska , Inc . for the construction of a Fire Station at Tri -City Complex , be approved ; authorizing the Contractor to install an air compressor, painted steel door in lieu of aluminum, install wrought iron panels in wall , change lights and signs , for a net cc : Ray Schweitzer increase in the contract price of $3 , 118 . 00 , from Craig Graves $781 ,513 .00 to $784 ,631 . 00 . Warren Knudson '47 Gerry Newcombe e Contact person: R o g e r G . H a r d g r a v e Phone: 5(1 Supporting data attached: Staff R p t . R 0 0 0 No . Two Ward: 1 FUNDING REQUIREMENTS: Amount: $3 , 118 - 00 Source: Acct. No.) 251-644-53925 i (Acct. Description) Tri -City Fire Station f Finance: Council Notes: ��.m�� Anenda Item Nn VZ1 CIT. OF SAN BERNARDI[ I - REQUE-T FOR COUNCIL AC's"7N STAFF REPORT An air compressor was not included in the final contract documents even though one has been requested by the Fire Depart- ment . The compressor will be used to inflate tires and for cleaning and drying . The Contractor has agreed to install the air compressor complete and in place for $2 ,975 .00 . As a cost reducing measure , the architect has approved a change to the specifications , from an aluminum roll -up door to a painted steel door . The Contractor has agreed to deduct $1 ,200 . 00 for this change . The Fire Department has requested that wrought-iron panels be placed within the perimeter block wall , in order to increase visibility , thereby decreasing theft and vandalism . This item was included as an Additive Alternate , but not included in the contract award . The Contractor designated a price in the bid of $7 , 143 . 00 to provide the wrought iron panels . As a cost reducing measure , the architect has proposed deleting 3 light standards , the monument sign and lights , flag- pole lights , and adding two ( 2 ) wall pak lights , a 1" conduit for a future fuel tank , and molded plastic letters for a sign on the building . The Contractor has agreed to perform these items for a net deduction of $5 ,800 . 00 . Contract Change Order No . Two would result in a net in- crease in the contract price of $3 , 118 . 00 , from $781 , 513 . 00 to $784 ,631 . 00 . The project funding contains $45 ,987 . 00 for contingencies , which can be used to finance this change order . We recommend that Change Order No . Two be approved . SYNOPSIS OF PREVIOUS COUNCIL ACTION continued : 11- 19-87 -- Resolution No . 87-378 adopted awarding contract to Martin Jaska , Inc . for the low bid price of $869 ,000 . 00 . 11- 19-87 ---Change Order No . ONE approved , reducing the contract price by $87 ,487 . 00 , from $869 ,000 . 00 to $781 , 513 . 00 . 12-23-87 75-0264 P-eject: CONSTRUCTION OF A FIRE STATION Date:12-16-87 IN TRI-CITY COMPLEX File No. Plan No. 7270 2.119 ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO, CALIFORNIA CONTRACT CHANGE ORDER NO. 2 (Change necessitated because of field conditions) TO: Martin Jaska, Inc. 4761 Arrow Highway Montclair, CA 91763 Gentlemen: You are hereby authorized and directed to perform the following items of extra work: Item 1 : Install (1) air compressor with 80 gal . tank, complete and in place . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Lump Sum $2,975.00 Item 2: Install painted steel in lieu of aluminum rool-up door. . . . (Deduct) (1 ,200.00) Item 3: Install wrought iron panels in fence . . . . . . . . . . . . . . . . . . . . .Lump Sum 7,143.00 Item 4: Delete (3) light standards, monument sign, lights and flagpole lights; add (2) 400 watt wall-paks at North wall ; add 1" conduit for future fuel pump; add 6" and 9" Futura Medium molded plastic sign letters per revised drawing C. . (Deduct) (5,800.00) Total extra work cost added to contract . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 3.118_nn Previous Contract Price . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 781 513.00 Amended Cost Price . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 784,631.00 Additional time to complete contract due to change order . . . . . . . . . . . . -0- CONTRACTOR: CITY OF SAN BERNARDINO: By; By: ROGER G. H RDGR V Title: Director of Public Works/City Engr. Accepted Date: Approved Date: