Loading...
HomeMy WebLinkAbout46- Public Works a Oak CITY OF SAN BERNARDINO - REQUEST N06OUNCIL ACTION From: ROGER G . HARDGRAVE D.0 v l�Vthorization to Execute Agreement Edith CALTRANS -- Construction of Dept: Public Works/Engineering r. Traffic Signals at 2nd Street and �� Route I -215 Freeway Date: February 9 , 1988 Synopsis of Previous Council action: None . Recommended motion: Adopt resolution . cc : Ray Schweitzer Jim Penman % l Warren Knudson Signat e,, C/ Contact person: Gene R . K l a t t Phone: 5125 Staff epor , Supporting data attached: Agreement and Resolution Ward: 1 & 3 FUNDING REQUIREMENTS: Amount: N/A Source: (Acct. No.) (Acct. Description) Finance: Council Notes: ot K1- -5(6 CIT OF SAN BERNARDIk J - REQUE.r r FOR COUNCIL AC1 .ON STAFF REPORT The need for traffic signals at the Second Street Ramp with Route I -215 Freeway has been discussed with Caltrans for the past few years . In response to these discussions , Caltrans has secured Federal -Aid Interstate Funds to finance the total cost of the project . The proposed Agreement provides , in general , that the City will prepare the plans , specifications and estimate , and the State will reimburse the City for preliminary engineering costs up to $5 ,000 , and award and administer the construction contract . Caltrans has requested that the City prepare the plans , in order that the signals may be completed in November , 1988 . Since all costs will be financed with Federal -Aid Interstate Funds , there will be no financial impact upon the City , except for any items determined to be ineligible . The Agreement also provides that Caltrans will operate the signals . Caltrans personnel have indicated that they will cooperate with the City in timing the signals so as to achieve coordinated movement of traffic . Furthermore , that the City will reimburse the State in the amount of 50% of operation and maintenance costs for signals at the easterly ramp and 67% at the westerly ramp . We recommend that the agreement be approved . 2-09-88 s I RESOLUTION N0 . 2 RESOLUTION OF THE CITY OF SAN BERNARDINO AUTHORIZING THE EXECUTION OF AN AGREEMENT WITH THE STATE OF CALIFORNIA RELATING 3 TO THE INSTALLATION OF TRAFFIC SIGNALS AT SECOND STREET AND ROUTE I -215 FREEWAY RAMPS . 4 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE 5 CITY OF SAN BERNARDINO AS FOLLOWS : G SECTION 1 . The Mayor of the City of San Bernardino is 7 hereby authorized and directed to execute , on behalf of said 8 City , an agreement with the State of California relating to the 9 installation of Traffic Signals at Second Street and Route I -215 10 Freeway Ramps , which agreement is attached hereto , marked 11 Exhibit "A" and incorporated herein by reference as fully as 12 though set forth at length . 13 SECTION 2 . The agreement shall not take effect until 14 fully signed and executed by both parties . The City shall not be 15 obligated hereunder unless and until the agreement is fully 16 executed and no oral agreement relating thereto shall be implied 17 or authorized . 18 I HEREBY CERTIFY that the foregoing resolution was 19 duly adopted by the Mayor and Common Council of the City of San 20 Bernardino at a _meeting thereof , held on the 21 day of 1988 , by the following vote , to-wit : 22 AYES : Council Members 23 -- — — 24 NAYS : — 25 ABSENT : - 26 27 City Clerk 28 2/09/88 Resolution Authoriz' 7 the Executif of an Agreement . . . Relat g to the installation .,f Traffic Sigr.uls at Second Street and Route I-215 Freeway Ramps. 1 The foregoing resolution is hereby approved this day 2 of 1988 . 3 4 Mayor of the City of San Bernardino 5 Approved as to form 6 and legal content : 7 9 CI t'y Attorney 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 97 28 - 2 - 12/09/88 i 08-SBd-15-6 . 7 08252 - ?03701 Construct Traffic 4 Signals at Second St . Ramp Terminals District Agreement No . 8-603 COOPERATIVE AGREEMENT This AGREEMENT, entered into on , 19 , is between the STATE OF CALIFOR►IIA , acting by and through its Department of Transportation , referred to herein as STATE , and CITY OF SAN BERNARDINO a body politic and a municipal corporation of the State of California , referred to herein as CITY RECITALS ( 1 ) STATE and CITY , pursuant to Streets and Highways Code Section 114 , are authorized to enter into a cooperative agreement for improvements to State highways within CITY. ( 2) STATE is prepared to authorize CITY to assist in the design of traffic control signals and safety lighting at the intersections of the interchange ramp terminals of Interstate Route 215 with Second Street , referred to herein as "PROJECT" . ( 3) CITY desires to prepare plans , specifications , and estimates ( PS&E) for PROJECT in order to bring about the earliest possible construction of PROJECT. EXHIBIT "A" L �3 .,� ( 4) CITY will benefit from early construction of PROJECT due to the expected reduction in congestion of traffic between Interstate Route 215 and the Central City Mall . ( 5) STATE and CITY do mutually desire to cooperate in the design of the PROJECT and desire to specify herein the terms and conditions under which PROJECT is to be designed . ( 6) It is anticipated that Federal-Aid Interstate Funds will be allocated for financing 100% of the construction , construction engineering and preliminary engineering costs which are eligible for Federal-Aid participation , and STATE and CITY will bear any remainder of the costs as set forth herein . SECTION I STATE AGREES : ( 1 ) To provide CITY with necessary regulations , policies , procedures , manuals , standard plans and specifications , and other standards required for the preparation of PS&E for PROJECT. ( 2) To work with CITY to assure that required State and Federal procedures are followed . ( 3) To provide prompt reviews and approvals as appropriate of submittals by CITY, and to cooperate in timely processing of. PS&E. -2- (4) To deposit with CITY within 30 days of execution of this Agreement , the sum of $2, 000. 00 which represents 50% of the estimated costs for the total PS&E work to be done on PROJECT by CITY forces and to reimburse CITY for the remainder within 30 days after the receipt of the completed PS&E and receipt of billing, for all non-salary expenses , and actual and direct labor costs plus fringe benefits and overhead . (5) To provide necessary encroachment permits , and all rights of entry and permits to enter , related to PROJECT including but not limited to those required for design investigations and surveys . ( 6 ) To award and administer a contract to construct PROJECT in conformance to plans prepared by CITY. (7 ) To operate the traffic control signal as installed and pay 100% of the operation cost . _3_ SECTION II CITY AGREES: ( 1 ) To prepare PS&E for PROJECT with CITY forces . The PS&E are to be prepared in accordance with STATE ' s laws , rules , regulations , policies , procedures , manuals , standard plans and specifications , and other standards including compliance with Federal Highway Administration ( FHWA) requirements , as provided by STATE in accordance with Section I, Article 1 of this Agreement . Final approval of the PS&E shall be by STATE and FHWA. The CITY shall not incorporate in the design any materials or equipment of single or sole source origin without the written approval of the STATE . (2 )T o acquire and furnish the necessary rights of way, if any, required outside of the State Highway rights of way . ( 3 ) To comply with the requirements of Volume 7 , Federal-Aid Highway Program Manual when acquiring rights of way . ( 4 ) To identify and locate all high and low risk underground facilities within the PROJECT area in accordance with STATE ' s "Manual on High and Low Risk Underground Facilities within Highway Rights of Way . " Costs of locating, and identifying, such high and low risk facilities on the plans shall be included in costs paid to CITY for the preparation of preliminary engineering . CITY hereby acknowledges the receipt of STATE ' s "Manual on High and Low Risk Underground Facilities within Highway Rights of Way. " -4- (5) To furnish STATE, prior to commencing work on the PROJECT , a proposed time schedule to complete the PS&E for this PROJECT . (6 ) To have the final design documents and drawings of structural , mechanical , electrical , civil , architectural , or other engineering features of the PROJECT prepared by or under the direction of engineers or architects registered and licensed in the applicable professional field in the State of California . Any reports , the specifications , and each sheet of plans shall bear the professional seal , certificate number , registration classification, expiration date of certificate, and signature of the professional engineer responsible for their preparation. (7) To retain all books , documents , papers , accounting records , and other evidence pertaining to costs incurred , and make such materials available at the respective offices of the CITY for three years from the date of final payment under the contract . The STATE, FHWA , or any duly authorized representative of the Federal Government shall have access to any books , records , and documents of CITY that are pertinent to the contract for audits , examinations , excerpts, and transactions , and copies thereof shall be furnished if requested . -5- I (8) To reimburse STATE for CITY' s proportionate share of the cost of maintenance of said traffic control signal and safety lighting, such share to be an amount equal to 50% of the total maintenance costs , including electrical energy costs at the Easterly ramp terminals and 67% of the total maintenance costs , including electrical energy costs at the Westerly ramp terminal . (9 ) That the total cost to STATE for CITY preparation of PS&E including all non-salary expenses , and actual and direct labor cost plus fringe benefits and overhead and including all other requirements contained in this SECTION II shall not exceed the sum of $5 , 000 . 00. -6- { SECTION III IT IS MUTUALLY AGREED : ( 1 ) All obligations of STATE under the terms of this Agreement are contingent upon the appropriation of resources by the Legislature and the allocation of resources by the California Transportation Commission . (2 ) The total cost reimbursement payable by STATE to CITY under this Agreement will be subject to audit verification as to all elements of costs and fees charged . The total may be increased by amendment to this Agreement . ( 3 ) Actual cost reimbursed , direct and indirect , shall be in conformance with procedures set forth in STATE ' s Cost Principles and Procedures , Chapter 1 , Part 31 , CFR 48 . CITY also agrees to comply with Federal Procedures in accordance with Office of Management and Budget Circular A-102, Uniform Administrative Requirements for Grants-in-Aid to STATE and local Government . ( 4 ) STATE shall designate a State Project Coordinator and CITY shall designate a representative through whom all communications between the two agencies shall be channeled . The State Project Coordinator shall review the work of CITY, during performance of PROJECT work. -7- i ( 5) Upon completion of all work under this Agreement , ownership and title to all engineering reports , documents , plans , specifications, and estimates including resident engineer memos and estimates backups produced as part of this PROJECT will automatically be vested in the STATE and no further agreement will be necessary to transfer ownership to the STATE. CITY will furnish STATE all necessary copies of plans , specifications , and estimates to complete review and approval process , and upon completion of PS&E will transfer all PROJECT documents to STATE. ( 6 ) If existing public and/or private utilities conflict with the construction of the PROJECT, CITY will make all necessary arrangements with the owners of such utilities for their protection, relocation or removal . CITY will inspect the protection, relocation or removal of such utilities . If there are costs of such protection, relocation or removal which the STATE and CITY must legally pay, STATE and CITY will share in the cost of said protection, relocation or removal in the amount of 50% STATE and 50% CITY. -8- (7) It is understood and agreed that neither STATE nor any officer or employee thereof is responsible for any damage or liability occurring by reasons of anything done or omitted to be done by CITY under or in connection with any work, authority or jurisdiction delegated to CITY under this Agreement . It is understood and agreed that , pursuant to Government Code Section 895 . 4, CITY shall fully defend , indemnify and save harmless the State of California , all officers and employees from all claims , suits or actions of every name, kind and description brought for or on account of injuries to or death of any person or damage to property resulting from anything done or omitted to be done by the CITY under or in connection with any work , authority or jurisdiction delegated to the CITY under this Agreement . ( 8) It is understood and agreed that neither CITY nor any officer or employee thereof is responsible for any damage or liability occurring by reasons of anything done or omitted to be done by STATE under or in connection with any work, authority or jurisdiction delegated to STATE under this Agreement . It is understood and agreed that , pursuant to Government Code Section 895 . 4, STATE shall defend , indemnify and save harmless the CITY from all claims , suits , or actions of every name, kind and description brought for or on account of injuries to or death of any person or damage to property resulting from anything done or omitted to be done by STATE under or in connection with any work, authority or jurisdiction delegated to the STATE under this. Agreement . -9- (9) No alteration or variation of the terms of this Agreement shall be valid unless made in writing and signed by the parties hereto and no oral understanding or agreement not incorporated herein shall be binding on any of the parties hereto. ( 10) STATE reserves the right to terminate this Agreement upon written notice to CITY. At the time of termination, CITY will be paid for work accomplished and delivered in accordance with the terms of this Agreement. All engineering documents , including raw data and draft plans , specifications , and estimates , prepared up to the time of termination shall become property of the STATE. -10- i ( 11 ) This Agreement shall terminate upon completion and acceptance of the PROJECT construction contract by STATE, or on January 1 , 1991 , whichever is earlier in time, unless all parties agree to an extension of time. STATE OF CALIFORNIA CITY OF SAN BERNARDINO Department of Transportation DONALD L. WATSON Interim Director of Transportation By Mayor By istrict Director ATTEST :, City Clerk APPROVED AS TO FORM AND APPROVED AS TO FORM: PROCEDURE : Attorney City Attorney Department of Transportation CERTIFIED AS TO FUNDS AND PROCEDURE : District Accounting Officer -11- s a 8-SBd-215-6 . 7 08252-303701 At Second Street j Ramp Terminals i EXHIBIT A ESTIMATE OF COST Description Total City State Federal Construction Signals $133 , 000 ($ 66, 500) ($ 66, 500) $ 133 , 000 Roadwork 39, 000 ( 19, 500) ( 19, 500) 39, 000 Subtotal 172, 000 ( 86, 000) ( 86, 000) 172,000 Preliminary Engineering City Estimate $ 4, 000 $ 2,000 $ 2,000 -0- (not to exceed $5 , 000) Construction $ 25 , 800 . -0- ($ 25, 800) $ 25 , 800 Engineering ( 15% ) State Furnished Materials $ 15 , 000 ( $ 7, 500) ($ 7, 500 ) $ 15 , 000 Utilities (*50% ) (*50% ) 100$ TOTALS $216, 800 ($ 108, 400 ) ($ 108, 000 ) $212 , 800 $ 2, 000 $ 2,000 ( ) = City and State shares before Federal-Aid payment . *See SECTION III, Item ( 6) - costs of protection, relocation or removal of utilities is eligible for Federal-Aid participation if required under construction contract. I -12- s