HomeMy WebLinkAbout2015-248 RESOLUTION NO. 2015-248 1 2 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO APPROVING A MEMORANDUM OF UNDERSTANDING WITH 3 OMNITRANS COVERING THE CONSTRUCTION AND CONSTRUCTION MANAGEMENT, ADMINISTRATION, AND INSPECTION OF THE "E" STREET 4 IMPROVEMENT PROJECT, FROM 10TH STREET TO HIGHLAND AVENUE. 5 WHEREAS, Omnitrans awarded a construction contract for the "E" Street 6 Improvement Project to Matich Corporation, in May 2015, for $3,417,000. In addition, 7 Omnitrans added a 15% construction contingency to the Project, or an additional $512,550. 8 Omnitrans has committed to contribute a total of$3,929,550 towards the construction cost of 9 the Project; and WHEREAS,the Mayor and Common Council adopted Resolution No. 2015-192 on 10 August 17, 2015, which appropriated $410,040 towards the administration, inspection and 11 select construction work for the Project; and 12 WHEREAS,the Project includes construction of various concrete improvements, 13 including curb ramps, sidewalks, driveway approaches, curb and gutters, reconstruction of 14 asphalt concrete pavement, resurfacing, striping, utility relocations, etc. on"E" Street from 10th Street to Highland Avenue; and 15 WHEREAS, Omnitrans and the City are working cooperatively on the construction of 16 the Project. Omnitrans' formal role in the construction of the Project includes funding the work 17 via a combination of local and federal funds, overall lead for construction contract 18 administration and construction management, and oversight of the construction work. The City will cover the cost of out of scope construction work, provide construction inspection and 19 quality assurance, and will make recommendations for construction contract change orders and 20 payment of the contractor's progress payment invoicing; and 21 WHEREAS,the Parties wish to specify their respective responsibilities for the 22 construction, and construction management, administration and inspection of the Project in a Memorandum of Understanding; 23 1H 24 ffl 25 HI 1 NOW THEREFORE BE IT RESOLVED BY THE MAYOR AND COMMON 1 COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: 2 3 SECTION 1. The City Manager is hereby authorized and directed to execute the 4 Memorandum of Understanding with Omnitrans, attached and incorporated herein as "Exhibit A". 5 SECTION 2. The authorization to execute the Memorandum of Understanding is 6 rescinded if it is not executed within 90 days from the date of adoption of this Resolution. 7 8 9 10 12 /// 13 /// 14 15 16 17 18 19 20 21 22 /// 23 /// 24 25 2 1 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO APPROVING A MEMORANDUM OF UNDERSTANDING WITH 2 OMNITRANS COVERING THE CONSTRUCTION AND CONSTRUCTION 3 MANAGEMENT, ADMINISTRATION, AND INSPECTION OF THE "E" STREET IMPROVEMENT PROJECT,FROM 10TH STREET TO HIGHLAND AVENUE. 4 5 I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor and 6 Common Council of the City of San Bernardino at a joint regular meeting thereof, held on the 2°d day of November, 2015, by the following vote, to wit: 7 8 Council Members: AYES NAYS ABSTAIN ABSENT 9 MARQUEZ X 10 BARRIOS X I1 VALDIVIA X 12 SHORETT X 13 NICKEL X 14 15 JOHNSON X 16 MULVIHILL X r 17 18 Georgeag Hanna, CYAC, City Clerk 19 The foregoing resolution is hereby approved this day of November, 2015. 20 21 22 R. CARE DAVIS, Mayor City of S Bernardino 23 Approved as to Form: GARY D. SAENZ, City Attorney 24 By: 25 3 2015-248 MEMORANDUM OF UNDERSTANDING This MEMORANDUM OF UNDERSTANDING ("MOU"), by and between Omnitrans, a joint powers authority created via joint powers agreement dated March 8, 1976, and amended pursuant to Section 6500, et seq., of the Government Code, and the City of San Bernardino, a charter City (City), is made and entered into this 2nd day of November , 2015 ("Effective Date"). Omnitrans and City are sometimes individually referred to as "Party"' and collectively as "Parties." WITNESSETH WHEREAS, Omnitrans has constructed significant improvements to E Street within the City, as part of the E Street Corridor sbX Bus Rapid Transit Project, improving the economy of the City and to the general benefit and welfare of its citizens; and WHEREAS, E Street, from 300' north of 10`h Street to Highland Avenue, is in need of pavement rehabilitation to support the added bus traffic and Americans with Disability Act (ADA) improvements, hereinafter collectively defined as Project; and WHEREAS, Project lies completely within City limits; and WHEREAS, City has prepared plans and special provisions (Construction Documents) for Project; and WHEREAS, Omnitrans has approved Construction Documents; and WHEREAS, Omnitrans has advertised and awarded a construction contract in the amount of$3,417,000, to Matich Corporation, for construction of Project; and Page 1 of 10 2015-248 WHEREAS, Omnitrans, as local sponsor of Project through the Federal Transit Authority (FTA), has agreed to contribute a combination of local and federal funds towards the successful construction of Project, with said maximum contribution by Omnitrans towards construction of Project totaling $3,417,000, plus a 15% construction contingency totaling $512,550, for a combined contribution towards the construction of the Project totaling $3,929,550; and WHEREAS, City has budgeted $410,040 towards the Project, covering 1) work or costs to the project in excess of Omnitrans' $3,929,550 contribution, 2) work items outside of the Project's scope, should such work be required by City during construction of the Project, and 3) City design, inspection, and construction management costs; and WHEREAS, City and Omnitrans desire to complete the construction of Project in a timely manner; and WHEREAS, City and Omnitrans wish to specify their respective responsibilities for the construction, construction administration and inspection of Project, with this MOU providing the framework for City and Omnitrans to cooperatively construct the Project; and WHEREAS, City and Omnitrans possess full authority to enter into this MOU. NOW, THEREFORE, IT IS AGREED by the parties hereto as follows: SECTION I OMNITRANS SHALL: A. Be and is hereby designated the Lead Agency for Project. B. Prepare and process all necessary environmental compliance required by the California Environmental Quality Act of 1970 (CEQA), as amended, and the National Environmental Policy Act (NEPA), as required. Page 2 of 10 2015-248 C. Be and is hereby designated as Contracting Agent to provide FTA required funding oversight in connection with the construction and completion of said Project. 1. Labor compliance monitoring shall be performed by and in accordance with the Department of Industrial Relations. Reporting shall be done by the contractor directly with the DIR. Omnitrans shall establish the reporting identification number and provide to the contractor. D. Cause all contractors on Project to obtain general liability and motor vehicle liability insurance in amounts satisfactory to City. Omnitrans shall also cause City to be named as additionally insured on insurance certificates and separate endorsements for all contracts related to Project including construction. Copies of such certificates and endorsements shall be provided to City prior to construction. E. Issue official Notice to Proceed and construction start date, and provide a copy to the City. F. Provide all FTA funding compliance oversight for the project including Final Change Order Approval. G. Contract for materials testing services. Costs will be shared between Omnitrans and the City. H. Fully fund all Project construction, construction administration and approved contract change orders, except for any City design, construction management, inspection cost(s), Water Department costs, or City Project construction items added to the scope of work and/or beyond the $3,929,550 Omnitrans' contribution for Project. Page 3of10 2015-248 I. Provide final approval of all contract change orders (CCOs) that are necessary for the completion of Project as shown on the Construction Documents prepared by City and approved by Omnitrans. Omnitrans shall provide approval within a maximum of two (2) working days. J. Receive written "Notice of Completion" prepared by City so that the contract can be closed out. K. Prepare and submit invoice(s) to City for any City construction item costs covering out of scope work undertaken during the construction phase of Project, as approved by Omnitrans and as the costs are incurred, or at completion of construction phase. L. Have access to the work area at all times during the progress of construction of Project within City limits for the purpose of inspection and, should Omnitrans deem any remedial measures to be necessary, Omnitrans shall notify City thereof. SECTION II CITY Shall: A. Be a Responsible Agency for Project as defined by CEQA and NEPA, and review and not unreasonably withhold approval, in a timely manner, any CEQA or NEPA environmental documentation prepared by Omnitrans, if such environmental document is required. B. Be and is hereby designated as Constructing Agent to complete all tasks (with the exception of Labor Compliance as referenced in Section I.C.1. of this MOU) necessary to execute and deliver all documents required in connection with the construction and completion of said Project. Page 4of10 2015-248 C. Provide oversight and conduct all pertinent meetings, i.e. Project status, work site, final walk through and any other meetings required to complete Project in accordance with this MOU and the approved Construction Documents. Prepare and issue minutes for each meeting. D. Provide all construction contract work construction management, construction oversight and act as overall construction Project lead for all work conducted under this contract, including review and final approval of all contractor submittals, SWPPP, materials and mix design and submittals, all contract compliance submittals (with the exception of Labor Compliance as referenced in Section I.C.I. of this MOU), checking, verifying, approving and providing support to all federal and state documentation requests, and all customary construction administration and management items as required. E. If City encounters unknown or unforeseen hazardous materials or contamination within Project area during Project construction, City shall immediately notify appropriate agencies of such discovery and take appropriate remediation actions. Such remediation actions shall be as required by local, State and Federal agencies having such jurisdiction over any encountered hazardous materials. Omnitrans does not admit or acknowledge any liability for the presence or handling of such materials or contamination, and reserves all rights to obtain indemnification and reimbursement from any potentially responsible parties under local, state and federal law. F. Prepare and issue to Omnitrans for approval all Change Order Request (COR) packets prior to issuance to contractor for pricing. COR packets to include a detailed scope of work and cost estimate. G. Upon approval by Omnitrans of COR packet, issue packet to contractor for pricing. Evaluate costs and negotiate costs prior to preparation of Contract Change Order (CCO). Process only CCOs that are necessary for the completion of Project as shown on the Page 5of10 2015-248 Construction Documents approved by Omnitrans and by the City. Note any plan changes on record drawings. H. Accept improvements under the contract for Project in writing. I. File a written "Notice of Completion," in a form acceptable to City, immediately upon City's written acceptance of the improvements. Said Notice of Completion shall also be filed with County Clerk. Ten (10) days after filing Notice of Completion of Project with County Clerk, ownership and maintenance of all Project components shall vest with City, unless otherwise identified herein. Provide a copy to Omnitrans. J. Provide Omnitrans, within 120 days of filing the Notice of Completion of Project, with record as-built drawings of said Project. K. Provide funds for design, administration, inspection, materials testing, construction, and time impacts of any improvement elements mutually agreed in writing by Omnitrans and City to be outside of or in addition to Project (such as roadway landscaping, street lighting beyond that required for intersection lighting, etc., called out of scope work), as defined in this MOU. L. Issue written Notices to Relocate to agencies/entities whose improvements/utilities may interfere with Project, for those portions lying within City limits. M. Issue notices to property owners of projected work. N. Issue to Omnitrans' contractor, at no cost, encroachment permit(s), hauling permit(s), business permit(s), traffic detouring plan approvals, water department fees, water department permits, and any other permits for all Project work within City limits following City approval of .applicable plans. O. Not require issuance of a grading permit for any Project work within City limits. Page 6 of 10 2015-248 P. Have access to the work area at all times during the progress of construction of Project within City limits for the purpose of inspection and, should City deem any remedial measures to be necessary, City shall notify Omnitrans thereof. Q. Provide safety monitoring. R. During construction period provide staff to respond to contractor's questions and provide timely (two City working days turnaround) reviews and approvals on any items that require City's concurrence or approval. Approval shall be withheld only for work not completed per the approved plans and special provisions. S. Retain, or cause to be retained, all books, documents papers, accounting records, and other evidence pertaining to costs incurred, including support data for cost proposals, and make such materials available at the respective offices of the City at all times during Project and for a period of three (3) years from filing Notice of Completion for Project. Omnitrans or any duly authorized representative of the Federal Government shall have access to any books, records, and documents of the City that are pertinent to the contract for audits, examinations, excerpts, and transactions, and copies thereof shall be furnished if requested. SECTION III PAYMENTS AND FINAL ACCOUNTING: A. City shall prepare, review, and submit for Omnitrans' approval monthly progress billings for work completed during the prior billing cycle by Contractor. B. Omnitrans shall pay Contractor direct (not through City) approved monthly progress payments. Page 7 of 10 2015-248 C. Omnitrans shall invoice City as the costs are incurred, or other basis as agreed to by City and Omnitrans, or designees, for any City construction items, which have been previously agreed in writing to be outside of the original approved Construction Documents per this MOU, or for those costs that exceed Omnitrans' maximum total contribution to Project as defined elsewhere in this MOU, and based on Omnitrans' labor reports and progress pay statements. D. Within one hundred twenty (120) days after the acceptance of written Notice of Completion under the contract by the City, Omnitrans shall submit to City for their records, a Final Accounting Report for Project. SECTION IV It is MUTUALLY UNDERSTOOD BY THE PARTIES HERETO THAT: A. Upon acceptance of the improvements of Project by Omnitrans, and by City for City portions of the Project, and under the terms of this MOU, City shall accept and resume ownership and maintenance responsibility for the portion of Project within City limits. B. Neither Omnitrans nor any officer or employee thereof shall be responsible for any damage or liability occurring by reason of anything done or omitted to be done by City under or in connection with any work, authority or jurisdiction delegated to City under this MOU. It is also understood and agreed that, pursuant to Government Code Section 895.4, City shall fully indemnify, defend with counsel approved in writing and hold Omnitrans harmless from any liability imposed for injury (as defined by Government Code Section 810.8), occurring by reason of anything done or omitted to be done by Omnitrans under or in connection with any work, authority or jurisdiction delegated to City under this MOU. Page 8 of 10 2015-248 C. Neither City nor any officer or employee thereof shall be responsible for any damage or liability occurring by reason of anything done or omitted to be done by Omnitrans under or in connection with any work, authority or jurisdiction delegated to Omnitrans under MOU. It is also understood and agreed that, pursuant to Government Code Section 895.4, Omnitrans shall fully indemnify, defend with counsel approved in writing and hold City harmless from any liability imposed for injury (as defined by Government Code Section 810.8), occurring by reason of anything done or omitted to be done by City under or in connection with any work, authority or jurisdiction delegated to Omnitrans under this MOU. D. Amendments to this MOU shall be only as agreed to by both parties in writing. E. This MOU shall remain in full force and effect until December 31, 2016 unless extended in writing by the parties. However, either party may cancel this MOU by providing the other party such written notice forty-five (45) calendar days in advance of such cancellation. F. Any notice, request or demand made between the parties pursuant to this MOU is to be directed as follows: CITY OF SAN BERNARDINO OMNITRANS City Hall-Public Works Department 1700 West 5t" Street 300 North"D" Street San Bernardino, CA 92411 San Bernardino, CA 92418-0001 Attn: Program Manager Attn: Director of Public Works [Signatures on the following page] Page 9 of 10 2015-248 MEMORANDUM OF UNDERSTANDING IN WITNESS WHEREOF, the parties of these present have hereunto set their hands the year and date first above written. OMNITRANS CITY OF SAN BERNARDINO Corporate entity: By. BY: Allen J. Parker, City Manager CEO/General Manager City of San Bernardino Dated: APPROVED AS TO LEGAL FORM: ATTEST: By: Georgeann Hanna Legal Counsel City Clerk APPROVED AS TO FORM: ,S;� 'Z Gary D. Saenz, City Attorney Page 10 of 10 2015-248 MEMORANDUM OF UNDERSTANDING This MEMORANDUM OF UNDERSTANDING ("MOU"), by and between Omnitrans, a joint powers authority created via joint powers agreement dated March 8, 1976, and amended pursuant to Section 6500, et seq., of the Government Code, and the City of San Bernardino, a charter City (City), is made and entered into this 2nd day of November , 2015 ("Effective Date"). Omnitrans and City are sometimes individually referred to as"Party"' and collectively as"Parties." WITNESSETH WHEREAS, Omnitrans has constructed significant improvements to E Street within the City, as part of the E Street Corridor sbX Bus Rapid Transit Project, improving the economy of the City and to the general benefit and welfare of its citizens; and WHEREAS, E Street, from 300' north of 10th Street to Highland Avenue, is in need of pavement rehabilitation to support the added bus traffic and Americans with Disability Act (ADA) improvements, hereinafter collectively defined as Project; and WHEREAS, Project lies completely within City limits; and WHEREAS, City has prepared plans and special provisions (Construction Documents) for Project; and WHEREAS, Omnitrans has approved Construction Documents; and WHEREAS, Omnitrans has advertised and awarded a construction contract in the amount of$3,417,000, to Matich Corporation, for construction of Project; and Page 1 of 10 2015-248 WHEREAS, Omnitrans, as local sponsor of Project through the Federal Transit Authority (FTA), has agreed to contribute a combination of local and federal funds towards the successful construction of Project, with said maximum contribution by Omnitrans towards construction of Project totaling $3,417,000, plus a 15% construction contingency totaling $512,550, for a combined contribution towards the construction of the Project totaling $3,929,550; and WHEREAS, City has budgeted $410,040 towards the Project, covering 1) work or costs to the project in excess of Omnitrans' $3,929,550 contribution, 2) work items outside of the Project's scope, should such work be required by City during construction of the Project, and 3) City design, inspection, and construction management costs; and WHEREAS, City and Omnitrans desire to complete the construction of Project in a timely manner; and WHEREAS, City and Omnitrans wish to specify their respective responsibilities for the construction, construction administration and inspection of Project, with this MOU providing the framework for City and Omnitrans to cooperatively construct the Project; and WHEREAS, City and Omnitrans possess full authority to enter into this MOU. NOW, THEREFORE, IT IS AGREED by the parties hereto as follows: SECTION I OMNITRANS SHALL: A. Be and is hereby designated the Lead Agency for Project. B. Prepare and process all necessary environmental compliance required by the California Environmental Quality Act of 1970 (CEQA), as amended, and the National Environmental Policy Act (NEPA), as required. Page 2 of 10 LU15-L4tS C. Be and is hereby designated as Contracting Agent to provide FTA required funding oversight in connection with the construction and completion of said Project. 1. Labor compliance monitoring shall be performed by and in accordance with the Department of Industrial Relations. Reporting shall be done by the contractor directly with the DIR. Omnitrans shall establish the reporting identification number and provide to the contractor. D. Cause all contractors on Project to obtain general liability and motor vehicle liability insurance in amounts satisfactory to City. Omnitrans shall also cause City to be named as additionally insured on insurance certificates and separate endorsements for all contracts related to Project including construction. Copies of such certificates and endorsements shall be provided to City prior to construction. E. Issue official Notice to Proceed and construction start date, and provide a copy to the City. F. Provide all FTA funding compliance oversight for the project including Final Change Order Approval. G. Contract for materials testing services. Costs will be shared between Omnitrans and the City. H. Fully fund all Project construction, construction administration and approved contract change orders, except for any City design, construction management, inspection cost(s), Water Department costs, or City Project construction items added to the scope of work and/or beyond the $3,929,550 Omnitrans' contribution for Project. Page -3) of 10 2015-248 I. Provide final approval of all contract change orders (CCOs) that are necessary for the completion of Project as shown on the Construction Documents prepared by City and approved by Omnitrans. Omnitrans shall provide approval within a maximum of two (2) working days. J. Receive written "Notice of Completion" prepared by City so that the contract can be closed out. K. Prepare and submit invoice(s) to City for any City construction item costs covering out of scope work undertaken during the construction phase of Project, as approved by Omnitrans and as the costs are incurred, or at completion of construction phase. L. Have access to the work area at all times during the progress of construction of Project within City limits for the purpose of inspection and, should Omnitrans deem any remedial measures to be necessary, Omnitrans shall notify City thereof. SECTION II CITY Shall: A. Be a Responsible Agency for Project as defined by CEQA and NEPA, and review and not unreasonably withhold approval, in a timely manner, any CEQA or NEPA environmental documentation prepared by Omnitrans, if such environmental document is required. B. Be and is hereby designated as Constructing Agent to complete all tasks (with the exception of Labor Compliance as referenced in Section I.C.1. of this MOU) necessary to execute and deliver all documents required in connection with the construction and completion of said Project. Page 4 of 10 2015-248 C. Provide oversight and conduct all pertinent meetings, i.e. Project status, work site, final walk through and any other meetings required to complete Project in accordance with this MOU and the approved Construction Documents. Prepare and issue minutes for each meeting. D. Provide all construction contract work construction management, construction oversight and act as overall construction Project lead for all work conducted under this contract, including review and final approval of all contractor submittals, SWPPP, materials and mix design and submittals, all contract compliance submittals (with the exception of Labor Compliance as referenced in Section I.C.I I. of this MOU), checking, verifying, approving and providing support to all federal and state documentation requests, and all customary construction administration and management items as required. E. If City encounters unknown or unforeseen hazardous materials or contamination within Project area during Project construction, City shall immediately notify appropriate agencies of such discovery and take appropriate remediation actions. Such remediation actions shall be as required by local, State and Federal agencies having such jurisdiction over any encountered hazardous materials. Omnitrans does not admit or acknowledge any liability for the presence or handling of such materials or contamination, and reserves all rights to obtain indemnification and reimbursement from any potentially responsible parties under local, state and federal law. F. Prepare and issue to Omnitrans for approval all Change Order Request (COR) packets prior to issuance to contractor for pricing. COR packets to include a detailed scope of work and cost estimate. G. Upon approval by Omnitrans of COR packet, issue packet to contractor for pricing. Evaluate costs and negotiate costs prior to preparation of Contract Change Order (CCO). Process only CCOs that are necessary for the completion of Project as shown on the Page 5 of 10 2015-248 Construction Documents approved by Omnitrans and by the City. Note any plan changes on record drawings. H. Accept improvements under the contract for Project in writing. I. File a written "Notice of Completion," in a form acceptable to City, immediately upon City's written acceptance of the improvements. Said Notice of Completion shall also be filed with County Clerk. Ten (10) days after filing Notice of Completion of Project with County Clerk, ownership and maintenance of all Project components shall vest with City, unless otherwise identified herein. Provide a copy to Omnitrans. J. Provide Omnitrans, within 120 days of filing the Notice of Completion of Project, with record as-built drawings of said Project. K. Provide funds for design, administration, inspection, materials testing, construction, and time impacts of any improvement elements mutually agreed in writing by Omnitrans and City to be outside of or in addition to Project (such as roadway landscaping, street lighting beyond that required for intersection lighting, etc., called out of scope work), as defined in this MOU. L. Issue written Notices to Relocate to agencies/entities whose improvements/utilities may interfere with Project, for those portions lying within City limits. M. Issue notices to property owners of projected work. N. Issue to Omnitrans' contractor, at no cost, encroachment permit(s), hauling permit(s), business permit(s), traffic detouring plan approvals, water department fees, water department permits, and any other permits for all Project work within City limits following City approval of .applicable plans. O. Not require issuance of a grading permit for any Project work within City limits. Page 6 of 10 2015-248 P. Have access to the work area at all times during the progress of construction of Project within City limits for the purpose of inspection and, should City deem any remedial measures to be necessary, City shall notify Omnitrans thereof. Q. Provide safety monitoring. R. During construction period provide staff to respond to contractor's questions and provide timely (two City working days turnaround) reviews and approvals on any items that require City's concurrence or approval. Approval shall be withheld only for work not completed per the approved plans and special provisions. S. Retain, or cause to be retained, all books, documents papers, accounting records, and other evidence pertaining to costs incurred, including support data for cost proposals, and make such materials available at the respective offices of the City at all times during Project and for a period of three (3) years from filing Notice of Completion for Project. Omnitrans or any duly authorized representative of the Federal Government shall have access to any books, records, and documents of the City that are pertinent to the contract for audits, examinations, excerpts, and transactions, and copies thereof shall be furnished if requested. SECTION III PAYMENTS AND FINAL ACCOUNTING: A. City shall prepare, review, and submit for Omnitrans' approval monthly progress billings for work completed during the prior billing cycle by Contractor. B. Omnitrans shall pay Contractor direct (not through City) approved monthly progress payments. Page 7 of 10 2015-248 C. Omnitrans shall invoice City as the costs are incurred, or other basis as agreed to by City and Omnitrans, or designees, for any City construction items, which have been previously agreed in writing to be outside of the original approved Construction Documents per this MOU, or for those costs that exceed Omnitrans' maximum total contribution to Project as defined elsewhere in this MOU, and based on Omnitrans' labor reports and progress pay statements. D. Within one hundred twenty (120) days after the acceptance of written Notice of Completion under the contract by the City, Omnitrans shall submit to City for their records, a Final Accounting Report for Project. SECTION IV It is MUTUALLY UNDERSTOOD BY THE PARTIES HERETO THAT: A. Upon acceptance of the improvements of Project by Omnitrans, and by City for City portions of the Project, and under the terms of this MOU, City shall accept and resume ownership and maintenance responsibility for the portion of Project within City limits. B. Neither Omnitrans nor any officer or employee thereof shall be responsible for any damage or liability occurring by reason of anything done or omitted to be done by City under or in connection with any work, authority or jurisdiction delegated to City under this MOU. It is also understood and agreed that, pursuant to Government Code Section 895.4, City shall fully indemnify, defend with counsel approved in writing and hold Omnitrans harmless from any liability imposed for injury (as defined by Government Code Section 810.8), occurring by reason of anything done or omitted to be done by rags under or in connection with any work, A authority or jurisdiction delegated to City under this MOU. Page 8of10 2015-248 C. Neither City nor any officer or employee thereof shall be responsible for any damage or liability occurring by reason of anything done or omitted to be done by Omnitrans under or in connection with any work, authority or jurisdiction delegated to Omnitrans under MOU. It is also understood and agreed that, pursuant to Government Code Section 895.4, Omnitrans shall fully indemnify, defend with counsel approved in writing and hold City harmless from any liability imposed for injury (as defined by Government Code Section 810.8), occurring by reason G al n:Wo-VLS of anything done or omitted to be done by,011'— under or in connection with any work, authority n or jurisdiction delegated to Omnitrans under this MOU. D. Amendments to this MOU shall be only as agreed to by both parties in writing. E. This MOU shall remain in full force and effect until December 31, 2016 unless extended in writing by the parties. However, either party may cancel this MOU by providing the other party such written notice forty-five (45) calendar days in advance of such cancellation. F. Any notice, request or demand made between the parties pursuant to this MOU is to be directed as follows: CITY OF SAN BERNARDINO OMNITRANS City Hall-Public Works Department 1700 West 5th Street 300 North"D" Street San Bernardino, CA 92411 San Bernardino, CA 92418-0001 Attn: Program Manager Attn: Director of Public Works [Signatures on the following page] Page 9 of 10 2015-248 MEMORANDUM OF UNDERSTANDING IN WITNESS WHEREOF, the parties of these present have hereunto set their hands the year and date first above written. OMNITRANS CITY OF SAN BERNARDINO Corporate entity: By: / BY: - — CEO/General Manager Al en J. Parker, City Manager City of San Bernardino Dated: APPROVED AS TO LEG ATTEST: Legal Co ns 1 orgeann H a' City Clerk APPROVED AS TO FORM: 14'e, 6'Fr" 'z- Gary D. Saenz, City Attorney Page 10 of 10