Loading...
HomeMy WebLinkAbout15- Development Services CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION From: Valerie C. Ross, Acting Director Subject: Authorization to execute Contract Change Order No. Three with Holland- Dept: Development Services Lowe Construction, Inc.—Street and Signal Improvements on 6' Street from "H" Street Date: July 17, 2000 to Arrowhead Avenue and authorization for the Director of Finance to amend the FY File: 1.7152 2000/2001 budget and transfer funds. MCC Date: 07/24/2000 Synopsis of Previous Council Action: 6/06/99 Allocation of$150,000 for installation of pedestrian signals and loops at 6' Street from "G" Street to Arrowhead Avenue, and $150,000 for pavement rehabilitation of 6`h Street from "G" to "E" Streets in 1999/00 Capital Improvement Program (CIP). 12/20/99 Approval of plans and authorization to advertise for bids. 04/03/00 Adopted Resolution No. 2000-75 awarding contract in the amount of$260,521.35 to Holland-Lowe Construction, Inc. for Street and Signal Improvements on 6`h Street from "H" Street to Arrowhead Avenue per Plan No. 9995 7/10/00 Approved Change Order No. 2 in the amount of$7,430.00. Recommended Motion: 1. That the Mayor and Common Council authorize the Director of Finance to amend the 2000/2001 budget and transfer $10,000 from 129-367-5504-7156 "Street Improvements/Safety Improvements - Citywide" to 129-367-5504-7152 "Installation of Pedestrian Signals, traffic signal loops and rehabilitation of 6 1h Street". 2. That Contract Change Order No. Three to the contract with Holland-Lowe Construction, Inc. be approved for Street and Signal Improvements on 6th Street from "H" Street to Arrowhead Avenue for a net Change Order amount of$11,619.45, increasing the contract total from $270,412.35 to $282,031.80. VAAA�)6.�W Valerie C. Ross Contact person: Michael Grubbs, Sr. Civil Engineer Phone: 5179 Supporting data attached: Staff Report, CCO #3 Ward: 1 & 3 FUNDING REQUIREMENTS: Amount: $21,600 Source: (Acct. No.) 129-367-5504-7151 & 7152 & 7156 Acct. Description: Installation of Pedestrian Signals, traffic signal loops and rehabilitation of 6th Street & Safety Improvements. Finance: Council Notes: Agenda Item No. ' CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION Staff Report Subject. Authorization to execute Contract Change Order No. Three with Holland-Lowe Construction, Inc.—Street and Signal Improvements on 6' Street from "H" Street to Arrowhead Avenue and authorization for the Director of Finance to amend the FY 2000/2001 budget and transfer funds. Background: On April 3, 2000, the City entered into a contract with Holland-Lowe Construction, Inc. for Street and Signal Improvements on 6' Street from "H" Street to Arrowhead Avenue per Plan No. 9995. Change Order No. One in the amount of $2,461.00 was approved by the Director of Development Services on May 8, 2000. This change order authorized the rewiring of the existing signals at "D" Street and "G" Street, rework of a signal pole to clear an existing storm drain lateral, and relocation of an illuminated street name sign to 5th Street and "E" Street. Change Order No. Two in the amount of $7,430.00 was approved by the Mayor and Common Council on July 10, 2000 and consisted of additional sidewalk on 6`h Street and repair of a storm drain lateral. Subsequently, certain conditions at the site were encountered which necessitated changes to the design in order to provide a safe surface for traffic and to assure an adequate finished product. Those changes are as follows: Contract Change Order No. Three consists of the following items: Description of Change Cost 1. Additional Cost to Add 3/8" Dense Fine Mix For Leveling Course $82.34 tons. Cost is Based on Time and Materials $16,542.78 Costs. ** Reduction in rubberized Asphalt Concrete Pavement $ (4,293.33) Net Change Order Amount I $11,619.45 Justification: Upon completion of grinding of the existing pavement on 6`h Street between "H" Street and "E" Street, it was discovered that the grinder had cut into a layer of "open graded" asphalt which had been placed many years ago. This "open graded" asphalt raveled badly under traffic, creating a significant amount of dust and an unsuitable driving surface even for the one week period between grinding and the scheduled paving with rubberized asphalt pavement. - 2 - The contractor agreed to place a 3/8" thick leveling course of dense fine graded regular asphalt concrete pavement to provide a suitable driving surface. The contractor agreed to perform this work on a time and material basis, as provided under Section 3-3 "Extra Work" of the Standard Specifications, so the price indicated is the actual cost of installing the leveling course plus allowable mark-ups for overhead and profit. ** The cost of placing the leveling course is partially offset by a reduction in the quantity of Rubberized Asphalt concrete Pavement placed by 63.65 tons, resulting in a reduction in cost to the City of 63.63 tons x $77.35 per ton=$4,923.33. A copy of Change Order No. Three is attached which will increase the contract total from $270,412.35 to $282,031.80. Financial Impact: The total cost of change orders to date for this project, including Change Order No. Three, is $21,510.45. The total amount of Change Orders Nos 1, 2, and 3 is within the $26,051.65 (10%) in contingencies approved as part of the award of the contract on April 3, 2000, from Account No. 129-367-5504-7151 & 129-367-5504-7152 "Installation of Pedestrian Signals, traffic signal loops and rehabilitation of 6"' Street." However, during the budget review process, the account balance was reduced based on the estimated cost of completing the project at the time. Subsequently, the need to place the base course of paving was discovered which resulted in unanticipated costs. Therefore, Staff recommends the transfer of $10,000 from Account No. 129-367-5504-7156 "Street Improvements/Safety Improvements - Citywide" which has an FY00/01 balance of $200,000. This transfer will reduce the FY 00/01 allocation for 129-367-5504-7156 "Street Improvements/Safety Improvements - Citywide" to $190,000. The $10,000 transferred to 6`h Street should be adequate to pay the cost of this Change Order and all other ancillary costs necessary to complete the project, such as Staff time and laboratory testing costs. Recommendation: 1. That the Mayor and Common Council authorize the Director of Finance to amend the 2000/2001 budget and transfer $10,000 from 129-367-5504-7156 "Street Improvements/Safety Improvements - Citywide" to 129-367-5504-7152 "Installation of Pedestrian Signals, traffic signal loops and rehabilitation of 6' Street". 2. That Contract Change Order No. Three to the contract with Holland-Lowe Construction, Inc. be approved for Street and Signal Improvements on 6th Street from "H" Street to Arrowhead Avenue for a net Change Order amount of $11,619.45, increasing the contract total from $270,412.35 to $282,031.80. - 3 -