HomeMy WebLinkAbout2014-374 I RESOLUTION NO. 2014-374
2 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN
3 BERNARDINO ADOPTING THE FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM (2014-
2019) FOR MEASURE "I" LOCAL EXPENDITURES.
4
5 WHEREAS, San Bernardino County voters approved passage of Measure I 1990-2010 in
6 November 1989, which was renewed as Measure 12010-2040 in November 2004, authorizing the San
7 Bernardino Associated Governments, acting as the San Bernardino County Transportation Authority
8
("Authority"), to impose a one-half of one percent retail transaction and use tax applicable in the
9
incorporated and unincorporated territory of the County of San Bernardino; and
10
11 WHEREAS, revenue from the tax can only be used for transportation improvement and traffic
12 management programs authorized in the Expenditure Plans set forth in Ordinance No. 89-1 of the
13 Authority; and
14
WHEREAS, Expenditure Plans of the Ordinance require each local jurisdiction receiving
15
16
revenue from the tax to expend those funds pursuant to a Capital Improvement Program adopted by
17 resolution of the local jurisdiction; and
18 WHEREAS, Expenditure Plans of the Ordinance also require that each local jurisdiction
19 annually adopt and update their related Capital Improvement Program.
20
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF
21 SAN BERNARDINO AS FOLLOWS:
22 SECTION 1. The Five-Year Capital Improvement Program (2014-2019) for Measure "I" Local
23
Expenditures, attached as Exhibit "A" including the Expenditure Strategy attached as Exhibit `B", both
24
25 incorporated herein, are hereby adopted as the policy and program of the City of San Bernardino relating
26 to the construction of capital improvement projects, using Measure I Local Expenditures; except for
27 Projects SS12-001, SS14-025, SS15-026, and SS15-034 which shall be adopted by separate motion to
28
become part of this Resolution as Exhibit "C".
- 1
i RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN
BERNARDINO ADOPTING THE FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM (2014-
2 2019) FOR MEASURE "I" LOCAL EXPENDITURES
3
I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor and
4
5 Common Council of the City of San Bernardino at a joint regular meeting thereof, held on the 20th day
6 of October, 2014, by the following vote, to wit:
7 Council Members: AYES NAYS ABSTAIN ABSENT
s
MARQUEZ ** X
9
BARRIOS X
10
11 VALDIVIA ** X
12 SHORETT X
13 NICKEL X
14 * X
JOHNSON
15
MULVIHILL X
16
1s Geor Hanna C''y Clerk
19 The foregoing resolution is hereby approved this f day of October, 2014.
20
21
22 R. CAREY DAV , Mayor
23 City of San Bern rdino
Approved as to form:
24 GARY D. SAENZ, City Attorney
25
26 By:
27 * Exhibit"A" and"B"—Council Member Johnson absent.
2s
** Exhibit"C"—Council Members Marquez and Valdivia abstained.
Council Member Johnson absent.
-2
2014-374
Q a° $EI8 88=x888,888§$1888€8888 Big gig$S$ °$($888€8'$88898 -Si$oo°�8f8'$,8SS8$8S'
s8 @!is SMSi 88€ Big
s
_ g j I
«� ��$��w�,"�
W
^°
p O _
M R
m M r3
O O °
N O R
I
E
Fi
M
u j m v
o i
2! Z a
m
Z n m a it
LU
Z.
c6
rn
�LL
a I
c a 8
i a
V
L° W N m [
N N
P W N o R 88 s
m LL LL �
y g
Z
Z` " Ss8S8 S ° 888888€88 $'$s88S$ 8
3 s sass sass ssag °s
w U� rN m N
F ^ O a ww w Hwww w « w
0 N �� O R 88 8 38888ss 888 188'88888 0 ,$ €
m < > o o $ g8.es sae ° S e i
�.5 mmSso g:
W _N
~ W
m y
J o � ` €
° ° 8 .° 8888$8 888 $ °€ 8 8888 8$88888
fi > > ° sg sass,$ pss;essssss$s $$ ,P ;�s ,�sssss�$aassaa assss
$ < w N° S mmm 5ma m€Nm°mm°Nm`
o
LU
Swawa..w w w w w.w w w ww.ww ww«w.w www w,w ww wuewwwww wnwwH H,Hw HHH,H.
O N wm
gc� gsazge
C.
a E& O°UE,� CMs���3
w
c ui of o5 ( r� fill °z�'s �� ��aES$ma���� mja fi '�„`. ftfili€ o�
m
Q 2 pE�g S E315)— YF k s;
g' � Emaa' � �gai€7E €5 E� x .coaa
E �m mEEa¢ mz �, gi
Z N a
A E €a
W'..K
d O. _Q:.LL NmE a N a m yyN
j�a N E
W 13
iw a 3E Eo8y 3a
faU U�wa4 w U °v S 8 SS 488 m
a o°$
E
°2
Q 9: 9 �ji
A .NNN h h y �
NaNNm€ ;H Ny NyW NN � miN Zy hNNNN ' /m ! q. /Ny 3`
N'fm/l
2014-374
s ��
mLSI i y�aaa aS'SEa'lka8' g 'S i,,'!s"
l�€s 3Jv�!mii�k
€
l.;
I
s r ;
� a' ,
1Al
C W gs;s N g$
G.s Ni s M is
8 °$ $
88 88 88888
qJ
Ss 9m °
888809
� w
(FIR
8 $ 8888 8 8s 88
91 s $ °°`m OR
.w « w.N„wwwNNw ww ..w w"„„Nw„N'„„w.. ww ww.ww
E g T
9
6' uan
=5 €I a if
�
CM gag;rc 12 52 rcu�an- $ 8
.
a z•
°
,
i
u'
>
'
a �a ',5� rc� c zee= � � �E z z � a�•- i vg
3
a
3 aao oa 4 �,4 am �a; l5 II
�mB�Q�Q� 1`81M; �.
K
�N� 71 V€pA��,Nn.�5�,'N
2014-174
4 f \ 7q#k#
R \ 6f 4`
m
Lu
88 k$kkk \t
\}/°|�
\ !q \
!! |-
�� iE
�E
\\(
. . , , . � . :.
\g 9 St
f(\ � � ƒ
s
Oda ¥r
. . . $-
/�
� !
\a
j|}
15.1 @�
|$!! �|K
§0 |§
�2K22 )
HM
{ � / }f\\|/ §,§6% |
2014-374
EXHIBIT"B"
CITY OF SAN BERNARDINO
MEASURE I FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM
EXPENDITURE STRATEGY
2014-2019
The City of San Bernardino will continue to place emphasis on both its regional and
sub-regional arterial roadway system. At least fifty percent of our Measure I funds
allocation will be earmarked for specific capital projects that are geared towards
improving traffic flow and motorist convenience. Failing pavement surfaces will be
rehabilitated and traffic striping modified as needed to accommodate increased traffic
demand; and intersection capacity will be improved with new and modified traffic
signals.
In addition to the above capital projects program, San Bernardino will continue to
allocate up to fifty percent of its annual Measure I funds towards public works
maintenance activities. Maintenance work will continue to include the City's traffic
signal systems, sidewalk and curb repair, and pavement repair and overlay on the local
street system.
2014-374
EXHIBIT"C"
Five Year Capital Improvement Program (2014-2019)
for Measure "I" Local Expenditures
Abstentions
1. Councilmember Marquez Abstention:
SS14-025 8' Street - Medical Center Drive to Mt. Vernon Avenue
(Rehabilitate Pavement)
2. Councilmember Valdivia Abstention:
SS12-001 46`h Street - Mountain View Avenue to Sierra Way (Rehabilitate
Pavement)
3. City Attorney Gary D. Saenz:
SS15-026 Baseline Street - "H" Street to "I" Street (Rehabilitate Pavement)
SS 15-034 Arrowhead Avenue - 9`h Street to Baseline Street (Rehabilitate
Pavement)