HomeMy WebLinkAbout11- Public Works CITY OF SAN BERR'^;RDINO - REQUEST r 1R COUNCIL ACTION
File No. 4.42-29
Transfer of $112 , 500 of Storm
From: ROGER G. HARDGRAVE Subject: Drain Construction Funds - In-
stallation of Storm Drain in
Dept: Public Works University Parkway, s/o varsity
Avenue
Date: 9-1-93
Synopsis of Previous Council action:
None.
c p c_a
Recommended motion:
That the transfer of $112 , 500 from Account No. 248-368-57811 ,
"Highland Avenue, from Patton State Hospital to Orange Street, "
to Account No. 248-368-57 4?/Y , " University Parkway, from Varsity
Avenue to a point 350 ' to the South, be approved.
cc: Sha.una Clark
4' s ign
Contact person: Roger G. Hardgrave Phone: 5025
Staff Report,
Supporting data attached: and Map Ward: 5
FUNDING REQUIREMENTS: Amount: $112 , 500 (Storm Drain Construction Fund)
Source: (Acct. No.) 248-368-57,p/y
Acct. Description) University Parkway, from Varsity
Avenue to a point 350 ' to the South Finance• � -
Council Notes:
75-0262 Agenda Item No. Z/
CITY OF SAN BERIRDINO - REOUEST F'1R COUNCIL ACTION
STAFF REPORT
The Master Plan Storm Drain along University Parkway,
between Varsity Avenue (State Street) and College Avenue, will be
installed as a part of the development of the Hughes Market
Complex. There will be a gap of about 340 feet from the terminus
of the existing storm drain to Varsity Avenue, as shown on the
attached map.
Mr. Norb Parsoneault, Vice President - Engineering &
Construction for Hughes Markets, has proposed that they extend
the storm drain to the present terminus, and that the City
reimburse them for the extra cost incurred for this extra 340
feet of 75-inch storm drain. An estimate of approximately
$70 , 000 has been provided by Mr. Parsoneault for this extension
of the Master Plan Storm Drain. However, we have estimated the
cost to the City at $112 , 500.
The ditch along University Parkway has been a maintenance
problem for many years. Completion of this storm drain would
eliminate those problems . Therefore, we recommend that the City
accept this proposal.
An amount of $250 , 000 was allocated in the 1992/93 Storm
Drain Construction Fund Budget, under Account No. 248-368-57811 ,
for the Master Plan Storm Drain in Highland Avenue, from Patton
State Hospital to Orange Street. This project has not
progressed, since the Storm Drain Master Plan is in the process
of being revised.
It is recommended that $112,500 be transferred from the
$250 , 000 allocated for the storm drain in Highland Avenue, to
finance the City' s share of the storm drain along University
Parkway. The balance of $137 , 500 in Account No. 248-368-57811
will allow preliminary engineering to be commenced, as soon as
the revision to the Storm Drain Master Plan has been finalized.
Supplemental- funds to finance the construction cost can be
provided in the 1994/95 Fiscal Year Storm Drain Construction Fund
Budget.
There is a possibility that all, or a portion, of the
City' s share could be recovered by imposing a special development
fee in connection with development of the adjoining parcel (s) .
This fee would be based upon the fact that installation of the
storm drain would normally be a condition of approval for a
proposed development.
9-1-93
75-0264
' N
VI
J � (.o_
N
N s
LZ >
Uj l NO:lOna.SNO:, 3dn,,n,; _
-3 Ad -� l
- S a VA
or
• Q W Via I
w ro\ 1 AL
CY
lit i
/
1� r/
y 3
�• � h
Di
_ T'o O
1 9 / / 2 W
N.3p�� 9 �IXd/ �t c� O o W z o
-43C JIM
`W r D v
- z
S
r � r,,V�ndl // r �, f+�,• F9
�_
2 2 D N CCCVJJJ S Y r Z
w W
C Q
Q 4i r-
qQ' W O t� O s m W
I t11 v �. ? L W r C
---�--"- J m 1. a i s m m n
a C O �OQ/
In
ci