Loading...
HomeMy WebLinkAbout16- Public Works DEVELOPMENT DEPARTMENT OF THE CITY OF SAN BERNARDINO REQUEST FOR COMMISSION/COUNCIL AC_TION Roger G. Hardgrave, Dir. Subject: Authorization ConPre- From: g are Plans - Con- of Public Works/City Engr. pare of Mt. Vernon Avenue Storm Drain Date: 8-27l93-------------------------------------------------- - unission/Council/Committee Action' Synopsis of Previous CoM 06--21-90 - Mt. Vernon avenue Corridor Redevelopment Plan adopted. 08-09-93 - Allocation of $1 . 8 Million in bond proceeds approved for the Mt. Vernon Avenue Corridor Redevelopment Plan. Recommended Motion: gineer That the Director of Public Works/City Econstrucbtionutofy the Mt. directed to have plans prepared Vernon Avenue Master Plan Storm Drain, from the East Branch Lytle Creek Channel and Medical Center Drive to Mt. Vernon Avenue at Base Line Street. AogerG. a dgrave, Dir. of P.W. /C.E. cc: K. Henderson-_-- Timothy-___rnhaus_ Agency Administrator -_ ----------------------------------------- --- Phone: 5025 Contact Person: Roger G. Hardgrave Mt. Vernon Corridor Ward(s) : 1 , 3 & 6 Project Area: _ Supporting Data Attached: Staff Report ,_ M Bond FUNDING REQUIRE Source: Proceeds MENTS: Amount' $ 159 , 500 Budget Authority: Commission/Council Notes: Agenda Item No. :_L_4/_ DEPARTMENT OF PUBLIC WOES STAFF REPORT -- Authorization on f Mt Prepare Plans Avenue Construct D-11 & 0-13 Master Plan Storm Drain, Mt. Vernon Avenue has historically experienced heavy storm water ova during rain storms . This heavy flow has caused These nstorm e public and generated mane complaints - ence �o the p impediment to development along Mt• water flows have served as an imp Vernon Avenue. drainage L�vtle East Branch of Creek Charnel , at The Comprehensive Storm Drain Plan for this area shows facilities from th Medical Center Drive to Goodlet Avenue and Western Avenue as ojc These facilities are designated size rofe these ; facilities range shown on the attached map. The from a 6 ' X 11' RCB to an 84--inch pipe. only The first two (2) phases of these facilities , a,recommluded referred '-w to as the Mt. Vernon Avenue Storm Capital Improvement Program under the s19no 9 aeatafied6 source Fiscal p phase is listed Years . The third p financing. adopted to However,The Mt. Vernon Avenue Corridor Redevelopment P1atheas water encourage development this area. in order to allow this area to de- flows need to be mit)gated velop to its full potential. An amount of $1 ,800 ,000 in bond proceeds has been allocated to e the plans; specifications and the Mt. Vernon o Avenue Co specifications It is recommended that Con- authorization be granted to have Con-- estimate prepared for the section lip to Base Line Street. of the estimate r this section would collect the great majority Vernon Avenue. storm water that now flows in M.t. L estimate of the total project cost for she The preliminary es which includes an section up toB500 forLine preparation$of5the0plans, specifications amount of $15 9 , and estimated. zation be granted to have the plans pre- We recommend that authori pared for the first phase , up to Base Line Street. /6G 8--27--93 ...... _ Q ETT 'An 1111AV { 9rHlii D R e:rvoil .`SZ r ' coz"t • C'om unr r u 1 0 n ge--- Sze Anthony k • L�* ch ' AV _ ;io V MAGIVOL/A e - --- rise _ �14t 8 • ark Franklin ' f r High Sch N ASEUNE ROAD % ~ w Mt Ver +• X11 I I m ��,SCh �a•I 1/64 Par ' �{[LWAY ELE1) 0 . i 1 131 — ��. Ga Y 1 qpsp • � 1t Sam •• `�' �1 ° • • B 11 3 A_NT • �egen f� pRopoSED ORAM ...•�1. FXIST EO oRA14 t AM «�•• •� Son Bernardino County EwsTU�a oPa� oRA� EMT114=Sao ORAN FLOOD erwTooL DISTRICT CoMp%MMSIVE STORM DRAMs PLAN �^ �I ANOMTO pRomCT t4a7-DI1 =1 R v�.•ar M SCALE p�AWINO NQ P.� M•�R.af►Mi.. CATS tr r•n•w1 ee..�•rwr u.+. 3-82 is low 1 d 6