HomeMy WebLinkAbout16- Public Works DEVELOPMENT DEPARTMENT OF THE
CITY OF SAN BERNARDINO
REQUEST FOR COMMISSION/COUNCIL AC_TION
Roger G. Hardgrave, Dir. Subject: Authorization ConPre-
From: g are Plans -
Con-
of Public Works/City Engr. pare
of Mt.
Vernon Avenue Storm
Drain
Date: 8-27l93--------------------------------------------------
- unission/Council/Committee Action'
Synopsis of Previous CoM
06--21-90 - Mt. Vernon avenue Corridor Redevelopment Plan adopted.
08-09-93
- Allocation of $1 . 8 Million in bond proceeds approved
for the Mt. Vernon Avenue Corridor Redevelopment Plan.
Recommended Motion: gineer
That the Director of Public Works/City Econstrucbtionutofy the Mt.
directed to have plans prepared
Vernon Avenue Master Plan Storm Drain, from the East Branch Lytle
Creek Channel and Medical Center Drive to Mt. Vernon Avenue at
Base Line Street.
AogerG. a dgrave, Dir. of P.W. /C.E.
cc: K. Henderson-_-- Timothy-___rnhaus_ Agency Administrator -_
-----------------------------------------
--- Phone: 5025
Contact Person: Roger G. Hardgrave
Mt. Vernon Corridor Ward(s) : 1 , 3 & 6
Project Area: _
Supporting Data Attached: Staff Report ,_ M Bond
FUNDING REQUIRE Source: Proceeds
MENTS: Amount' $ 159 , 500
Budget Authority:
Commission/Council Notes:
Agenda Item No. :_L_4/_
DEPARTMENT OF PUBLIC WOES
STAFF REPORT
--
Authorization on f Mt Prepare Plans Avenue
Construct D-11 & 0-13
Master Plan Storm Drain,
Mt. Vernon Avenue has historically experienced heavy storm water
ova during rain storms . This heavy flow has caused These nstorm
e public and generated mane complaints -
ence �o the p impediment to development along Mt•
water flows have served as an imp
Vernon Avenue.
drainage
L�vtle
East Branch of Creek Charnel , at
The Comprehensive
Storm Drain Plan for this area shows
facilities from th
Medical Center Drive to Goodlet Avenue and Western Avenue
as ojc
These facilities are designated size rofe these ; facilities range
shown on the attached map. The
from a 6 ' X 11' RCB to an 84--inch pipe. only
The first two (2) phases of these facilities ,
a,recommluded referred
'-w
to as the Mt. Vernon Avenue Storm
Capital Improvement Program under the s19no 9 aeatafied6 source Fiscal
p phase is listed Years . The third p
financing. adopted to
However,The Mt. Vernon Avenue Corridor Redevelopment P1atheas water
encourage development this area.
in order to allow this area to de-
flows need to be mit)gated
velop to its full potential.
An amount of $1 ,800 ,000 in bond proceeds has been allocated to
e the plans; specifications and
the Mt. Vernon o Avenue Co specifications It is recommended that
Con-
authorization be granted to have Con--
estimate prepared for the section lip to Base Line Street. of the
estimate r this section would collect the great majority
Vernon Avenue.
storm water that now flows in M.t. L
estimate of the total project cost for she
The preliminary es which includes an
section up toB500 forLine
preparation$of5the0plans, specifications
amount of $15 9 ,
and estimated.
zation be granted to have the plans pre-
We recommend that authori pared for the first phase , up to Base Line Street.
/6G
8--27--93
...... _
Q ETT 'An 1111AV {
9rHlii D R e:rvoil .`SZ
r '
coz"t • C'om unr r
u 1 0 n ge--- Sze Anthony
k • L�* ch '
AV _
;io V MAGIVOL/A
e
- --- rise _ �14t 8
• ark
Franklin
' f r High Sch N
ASEUNE ROAD
% ~ w
Mt Ver
+• X11 I I m ��,SCh
�a•I
1/64
Par
' �{[LWAY ELE1)
0
. i 1 131 — ��. Ga Y 1
qpsp
• � 1t
Sam •• `�' �1
° • •
B
11 3 A_NT •
�egen f�
pRopoSED ORAM
...•�1. FXIST EO oRA14 t AM «�•• •� Son Bernardino County
EwsTU�a oPa� oRA�
EMT114=Sao ORAN FLOOD erwTooL DISTRICT
CoMp%MMSIVE STORM DRAMs PLAN
�^ �I ANOMTO pRomCT t4a7-DI1
=1 R v�.•ar M SCALE p�AWINO NQ
P.� M•�R.af►Mi.. CATS
tr r•n•w1 ee..�•rwr u.+.
3-82 is low 1 d 6