HomeMy WebLinkAbout32- Public Works , CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION
File No. 7 . 30-10
From: ROGER G. HARDGRAVE Subject: Approval of Contract Change
Order No. 3 -- Passenger Terminal
Access Roads & Parking Facilities,
0
I N�
Dept: Public Works � San Bernardino International-
5-2-96 Airport, per Plan No. 9053 -
Date: RIVERSIDE CONSTRUCTION
Synopsis of Previous Council action:
10-04-93 - Resolution No. 93-382 adopted authorizing the Mayor to
execute an application to the Economic Development Ad-
ministration for a grant.
03-21-94 - Resolution No. 94--68 adopted authorizing execution of
approval and award of grant.
04-03-95 - Resolution No. 95--92 adopted authorizing Mayor to execute
the amended grant application to EDA to finance road and
parking lot improvements .
10-02-95 - Plans approved and authority granted to advertise for bids .
01--22-96 - Resolution No. 96-41 adopted awarding contract for the low
bid price of $2 , 574 , 928 . 09 .
(Continued on second page)
Recommended motion:
That Change Order No. 3 to the contract with Riverside Construction
for improvement of access roads and parking facilities for the
passenger terminal for the San Bernardino Trade Center & International
Airport, in accordance with Plan No. 9283 , be approved; to authorize
additional compensation to the Contractor for extra work in the
removal and disposal of additional concrete and asphalt pavement and
facilities in or adjacent to the roadway improvements , at a price not
to exceed $36 , 770 . 00 , from $2 , 605 , 276 . 40 to $2 , 642 , 046 . 40 .
CC: Jim Monger, SBIAA
Bill Bopf, IVDA /�A Z /- //
Shauna Clark
Barbara Pachon igna re
Contact person: Gene R. Klatt Phone: 5125
Staff Report,
Supporting data attached: C.C.O. #3 Ward: 1
FUNDING REQUIREMENTS: Amount: $36 , 770 (EDA Grant & SBIAA)
Source: (Acct. No.) 242-362--5504-7038
Acct. Description) Access Roads & Parking Lot -
S.B. International Airport Terminal Finance �l�y��� •
Council Notes:
75-0262 Agenda Item No. �
PUBLIC WORKS
File No. 7 . 30-10
SYNOPSIS OF PREVIOUS COUNCIL ACTION: (Continued)
05-06-96 - Contract Change Order No. 2 approved to authorize addition-
al compensation for delays and extra work due to conflicts
with utilities , at an increase in the contract price of
$25 , 448 . 31 , from $2 , 579 , 828 . 09 to $2 , 605 , 276 . 40 .
5-2-96
CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
STAFF REPORT
Page 1 of 2
The existing improvements on Harry Sheppard Boulevard and
Leland Norton Way will necessarily have to be removed to allow
the new improvements to be installed. The plans direct the
Contractor to demolish the existing improvements on these
streets , except for the section from Del Rosa Drive to a point
about 250 feet to the east.
Since the existing improvements within this 250 feet will
also have to be removed, the Contractor will be performing extra
work. This extra work will be paid for on a time and materials
basis, in accordance with Section 3 of the Standard Specifica-
tions, at a cost not to exceed $7 , 532 . 00 .
The San Bernardino International Airport Authority will
commence advertising for bids in May, 1996 , for remodeling the
airport terminal building. The Authority has requested that
additional existing concrete pavement, adjacent to the northwest
corner of the terminal, be removed and replaced with asphalt
concrete paving. This request is due to the need for the work to
be done as a part of the remodeling, to match the new access
road. It will be cost effective to have this work done by the
Contractor for the access roads and parking lot.
The Contractor will perform this extra work on a time and
material basis, in accordance with Section 3 of the Standard
Specifications, at a cost not to exceed $13 , 258 . 00 .
A contract for drilling water wells was awarded by the
Air Force, as a part of their program to clean up the acquifer.
The plans for this contract directed the Contractor to install
the pipes for these wells above ground. Since these pipes would
have been in conflict with the improvement of the access roads,
the San Bernardino International Airport Authority paid the
Contractor an extra amount to install them underground. However,
this amount did not include disposal of the concrete paving
removed during excavation for installation of the pipes.
Riverside Construction has agreed to remove this concrete
paving on a time and material basis, in accordance with Section 3
of the Standard Specifications, at a cost not to exceed
$15 , 980 . 00 .
Funds to finance the additional cost of $36 , 770 . 00 , for
the extra work authorized by Contract Change Order No. 3 , will be
provided from the following sources :
Federal Economic Development Administration Grant - 75%
Inland Valley Development Agency - 25%
5-2-96
7r-n*gA
i
CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
STAFF REPORT
Page 2 of 2
All costs incurred will be charged to Account No. 242-
362-5504-7038 , and billed to the grant and IVDA. No City funds
will be used to finance any portion of the additional cost.
We recommend that Change Order No. 3 be approved.
5-2-96
FEDERAL PROJECT NO. 07-49-02680.01
CONTRACT CHANGE ORDER
CHANGE ORDER NO. 3
DATE: 4/17/96
Agreement Date: 2/12/96
NAME OF PROJECT: PASSENGER TERMINAL ACCESS ROADS AND PARKING
FACILITIES; SAN BERNARDINO INTERNATIONAL AIRPORT
OWNER: CITY OF SAN BERNARDINO
CONTRACTOR: RIVERSIDE CONSTRUCTION
The following extra work is to be performed, as directed by the
Resident Engineer, and the following changes are hereby made to the
CONTRACT DOCUMENTS:
(1) Removal of an additional tree and existing asphalt concrete
roadway, located on the east side of the intersection of Harry
Sheppard Blvd. and Del Rosa Drive, on a time and material
basis, at a cost not to exceed $ 7,532 .00.
(2) Remove and dispose of additional concrete pavement on the
northeast corner of the existing terminal building, as
requested by the SBIAA, on a time and material basis, at a cost
not to exceed $ 13,258.00.
(3) Removal of existing concrete rubble abandoned onsite by the
Air Force contractor, north of Building 658, on a time and
material basis, at a cost not to exceed $ 15,980.00.
JUSTIFICATION:
During the demolition of the existing improvements, it was
discovered that there was an error on the plans as to the
limits of removal on the project, the removal of the exist-
ing improvements from the intersection of Harry Sheppard
Blvd. and Del Rosa Drive approximately 300 lineal feet east
was not shown to be removed. However, it will be necessary
to remove this section in order to construct the improve-
ments as indicated on the plans.
The Air Force has performed remediation of contaminated
material at a site where the parking lot is to be constr-
ucted. However, there is still a large pile of concrete
rubble that needs to be removed. If the Air Force does not
have it removed within the next several weeks, the con-
tractor will be directed to remove it on a time and material
basis, at a cost not to exceed $ 13,258.00 .
Page 1
I
Contract Change Order No. 3
07-49-02680.01
(Continued)
The limits of the concrete pavement removal on the northwest
corner of the existing airport terminal building do not
extend far enough to provide for the transition into the
airport flight line beyond the new roadway, therefore, in
order to correct this deficientcy additoinal concrete
pavement will have to be removed and replace with asphalt
concrete pavement.
CHANGE TO CONTRACT PRICE:
ORIGINAL CONTRACT PRICE: $ 2 ,574,928.09
CURRENT CONTRACT PRICE adjusted
by previous change Order: $_ 2,605,276.40
The CONTRACT PRICE due to this CHANGE ORDER will be increased by:
Change Order will be increased by
an estimated $ 36,770.00
The NEW ESTIMATED CONTRACT PRICE including this CHANGE ORDER will
be $ 2 ,642 ,046.40
CHANGE TO CONTRACT TIME: To Be Determined
The CONTRACT TIME will be (increased) by To Be Determined calendar
days.
The date for completion of all work will be To Be Determined
Page 2
i
Contract Change Order No. 3
07-49-02680.01
(Continued)
Approvals Required:
To be effective, this Order must be approved by the Federal agency
if it changes the scope or objective of the PROJECT, or as may
otherwise be required by the SUPPLEMENTAL GENERAL CONDITIONS.
Accepted by:
Riverside Construction Date
Requested by:
Steven Enna, Construction Engineer Date
Recommended by:
Jim Monger Date
San Bernardino International Airport Authority
Recommended by:
William Bopf Date
Inland Valley Development Agency
Recommended by:
Roger G. Hardgrave Date
Director of Public Works/City Engineer
Economic Development Administration
Approved by:
Date
Page 3