Loading...
HomeMy WebLinkAbout18- Facilities Management CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION From: James Sharer, Director Subject: Resolution awarding contract to R. Moody Construction, Inc. for the Dept: Facilities Management remodeling of the City Yard Locker-room Restroom Facility at 234 North Mountain Date: December 18, 2000 View in San Bernardino Synopsis of Previous Council Action None Recommended Motion: 1. Adopt resolution, and 2. Authorize the Director of Finance to amend the FY 2000-2001 Adopted Budget and transfer $47,625 from the General Fund's unappropriated/undesignated fund balance to the Facilities Management Capital Alterations and Renovations budget, account#001-321-570 James W. Sharer . Contact person: James Sharer Phone: 384-5244 Supporting data attached: Staff Report Ward(s): 1 FUNDING REQUIREMENTS: Amount: $247,625.00 Source001-321-5706 - $200,000.00 Unappropriated Fund Balance - $47,625.00 Finance Council Notes: a Agenda Item No.�� i STAFF REPORT SU- BIEC? Resolution awarding a contract to R. Moody Construction, Inc. for the remodeling of the City Yard Locker-room/restroom facility at 234 North Mountain View in San Bernardino. BACKGROUND The City yard locker-room/restroom facility is located at 234 North Mountain View. The building is located in the northwest sector of the fourteen-acre city yards, and provides facilities for over 120 workers daily. The original building was built in the 1950's as a fleet services building for the yards and has been in use ever since. The restrooms were originally built to accommodate an all male workforce at that time. Since then,the restrooms have been split to accommodate women in the yards.The present configuration has two toilets and three urinals for the men and one toilet for the women.The fifty lockers are located in one room and do not have separate dressing areas. The breakroom consists of a single sixteen-foot table with benches to sit on.The kitchen is 8'x 10' and has a stove,but is locked due to safety concerns.The Refuse workers also have another building for their locker-room/restroom that is approximately 24' x 32'. This facility has break tables in the same room as the lockers. The Refuse and Street Divisions of Public Services are the main users of this facility. They currently have over 100 employees who come in during different shifts to use the area. The lack of breakroom and restroom facilities forces many workers to seek these facilities elsewhere.The restrooms,break-room and locker-room are not currently ADA compliant and place the City Of San Bernardino in a position of violating this federal law. The restrooms do not accommodate the disabled, the doors do not have lever hardware,the ramp to the door is over an eight percent grade, the breakroom does not have an area for the disabled to eat at,There are no lockers for the disabled, and there are no showers for the disabled. Currently,the fine for not meeting the ADA can be up to $25,000 per day. The project,in general,will consist of preparation of Plans, Specifications and Construction of the modification of the Locker-room/Warehouse at the City Yard. Attached is a proposed layout of the project. The scope of work is to include the following items: Demolition of existing restroom,locker room and lunchroom interior walls, plumbing,electrical,ceiling,flooring,lighting and miscellaneous. Removal and replacement of exterior sheathing/roofing, construct ridge vent and skylights. Utilize existing backbone structure Remove existing sliding exterior doors and replace with two 12' x 12' roll up doors and two hollow metal exterior doors Construct gutters and downspouts on front of building and rear-side walls Construct new restroom and locker room facilities to include the following. Rest room facilities for 120 men and 10 women to include privacy partitions,mirrors,trash disposal containers Locker room facilities for 120 men and 10 women,not including double tier lockers or benches One shower for men, one shower for women Lunchroom facilities to include rough-in for storage,microwave, refrigerator, dishwasher, and stove. Sink,garbage disposal, ice machine and drinking fountain are part of this contract., Lunch room to include combination eating/meeting area Provide two windows in lunchroom area Add to existing air conditioning system for remodeled area Exterior walls and ceiling area for restroom and lunch room to be insulated All modifications to be consistent with latest building codes and handicapped accessibility regulations Upon completion of the work,the City should have in hand complete Plans, Specifications and Construction As-builts with all supporting data, calculations and details used in the project in a format acceptable to the City. Plans do not exist for the Locker- room/Warehouse as it was constructed in the1950's. Measurements in the Locker- room/Warehouse may vary from room to room. The design/build firm is expected to verify all measurements. A notice of the Request For Proposal # F01-42 was mailed to over seventy vendors,the San Bernardino Chamber of Commerce, plus advertised in the newspaper and on the Internet. Five bids for the project were received on October 3,2000. A panel consisting of Ed Stone, Street Superintendent,Arlington Rodgers,Refuse Manager and Jim Sharer,Director of Facilities Management,interviewed the vendors,reviewed the proposals and rated them on a scale using six rating criteria. The criteria were price, completeness of proposal, design, material selection,use of space and timeline for work. The bids ranged from$247,625.00 to $410,361.00,with R. Moody Construction, Inc. being the lowest bidder and the highest score on the ratings sheet. The proposals contained the following prices for the project: Vendor Location Total Bid R. Moody Construction Cherry Valley $247,625.00 Gamut Construction Montclair $258,123.00 M. R. Bracey Construction Ontario $261,700.00 MGF Construction San Bernardino $269,000.00 DE/EN/Con Construction San Bernardino $410,361.00 FINANCIAL IMPACT This item was included in the Facilities Management Budget for FY00/01. The budget was $200,000.00,which was based on budget numbers provided by a contractor who estimated the project in January 2000. Now that the formal bid process is completed, the total project costs are estimated to be 247,625.00. Therefore,a budget amendment transferring $47,625.99 from the General Fund undesignated/unreserved fund balance to account 001- 321-5706 is required. RECOMMENDATION 1. Adopt resolution, and 2. Authorize the Director of Finance to amend the FY 2000-2001 Adopted Budget and transfer$47,625.00 from the General Fund's unappropriated/undesignated fund balance to the Facilities Management Capital Alterations and Renovations budget,Account# 001-321-5706. LZ E o O O O a � L V m O � � y O � � � r �• �r vr'� =G O t r Y 4 r t FiI t tir „ � Pkt n, ITP r}) 6 Ap t"t^Ay imp ��b •� 1~�I . C N COPY 1 Resolution No. 2 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF SAN 3 BERNARDINO AUTHORIZING THE EXECUTION OF A CONTRACT WITH R. MOODY CONSTRUCTION, INC. FOR THE REMODELING OF THE CITY YARD 4 LOCKER-ROOM/RESTROOM FACILITY AT 234 NORTH MOUNTAIN VIEW, IN SAN BERNARDINO. 5 6 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE 7 CITY OF SAN BERNARDINO AS FOLLOWS: 8 9 SECTION 1. R MOODY CONSTRUCTION, INC., is the lowest responsible bidder 10 for the remodeling of the City Yard locker-room/restroom facility, per Plan No. F01-42. A 11 contract is awarded accordingly to said bidder in a total amount of$247,625.00. Such contract shall 12 be effective only upon being fully executed by both parties. All other bids, therefore, are hereby 13 rejected. The Mayor is hereby authorized and directed to execute said contract on behalf of the 14 City; a copy of the contract is on file in the office of the City Clerk and incorporated herein by 15 16 reference as fully as though set forth at length. 17 SECTION 2. This contract and any amendment or modifications thereto shall not take 18 effect or become operative until fully signed and executed by the parties and no party shall be 19 obligated hereunder until the time of such full execution. No oral agreements, amendments, 20 modifications or waivers are intended or authorized and shall not be implied from any act or 21 course of conduct of an Y Pte'• 22 SECTION 3. This resolution is rescinded if the parties to the contract fail to execute it 23 24 within sixty (60) days of the passage of this resolution. 25 26 27 28 I RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF SAN BERNARDINO AUTHORIZING THE EXECUTION OF A CONTRACT WITH R. 2 MOODY CONSTRUCTION, INC. FOR THE REMODELING OF THE CITY YARD 3 LOCKER-ROOM/RESTROOM FACILITY AT 234 NORTH MOUNTAIN VIEW, IN SAN BERNARDINO. 4 5 I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and 6 Common Council of the City of San Bernardino at a meeting 7 thereof,held on the day of 2000, by the following vote, to wit: 8 9 Council Members: Ayes Nus- Abstain Absent 10 ESTRADA Nu 11 LIEN 12 MCGINNIS 13 SCHNETZ 14 15 SUAREZ 16 ANDERSON 17 MCCAMMACK 18 19 City Clerk 20 The foregoing resolution is hereby approved this day of 21 2000. 22 23 Judith Valles, Mayor City of San Bernardino 24 Approved as to form and 25 Legal content; James F. Penman, City Attorney 26 BY: 27 28 a CITY OF SAN BERNARDINO STATE OF CALIFORNIA CONTRACT DOCUMENTS PLANS AND SPECIAL PROVISIONS NO. F 01-42 FOR LOCKER-ROOM WAREHOUSE RENOVATION AT CITY YARDS SAN BERNARDINO, CA DIVISION OF FACILITIES MANAGEMENT CITY OF SAN BERNARDINO Qw, 2 INFORMATION FOR BIDDERS 1. Receipt and Opening of Bids The City of San Bernardino, California (herein called the "Owner") invites bids on the form attached hereto, all blanks of which must be appropriately filled in. Bids will be received by Owner at the Office of the Purchasing Manager until 3 : 00 p.m. Tuesday October 3 . 2000, and then publicly opened and read aloud, in the Purchasing Manager's Conference Room, 4t h . Floor, City Hall. The envelopes containing the bids must be sealed, addressed to the Purchasing Manager, City of San Bernardino, 300 North D Street, San Bernardino, California, 92418 and designated as Bid for the LOCKER-ROOM WAREHOUSE RENOVATION. The Owner may consider informal any bid not prepared and submitted in accordance with the provisions hereof and may waive any informality or reject any and all bids. Any bids may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. No bidder may withdraw a bid within 60 days after the actual date of opening thereof. 2 . Preparation of Bid Each bid must be submitted on the prescribed form and accompanied by the required documents as listed on herein. All blank spaces for bid prices must be filled in, in ink or typewritten, both in words and figures, and the foregoing Certification must be fully completed and executed when submitted. Each bid must be submitted in a sealed envelope bearing on the outside the name of the bidder, his address, and the name of the project for which the bid is submitted. If forwarded by mail, the sealed envelope containing the bid must be enclosed in another envelope addressed as specified in the bid form. 3 . Subcontracts The bidder is specifically advised that any person, firm, or other party to whom it is proposed to award a subcontract under this contractor: a. Must be acceptable to the Owner, and b. Must submit CERTIFICATION BY PROPOSED SUBCONTRACTOR REGARDING EQUAL EMPLOYMENT OPPORTUNITY. Approval of the proposed subcontract award cannot be given by the Owner unless and until the proposed subcontractor has submitted the Certification and/or other evidence showing that it has fully complied with any reporting requirement to which it is or was subject. 3 Although the bidder is not required to attach such g qu h Certification by proposed subcontractors to his bid, the bidder is advised of this requirement so that appropriate action can be taken to prevent subsequent delay in subcontract awards. 4 . Telegraphic Modification Any bidder may modify his bid by telegraphic communication at any time prior to the scheduled closing time for receipt of bids, provided such telegraphic communication is received by the Owner Prior to the closing time, and provided further, the Owner is satisfied that a written confirmation of the telegraphic modification over the signature of the bidder was mailed prior to closing time. The telegraphic communication should not reveal the bid price, but should provide the addition or subtraction or other modification so that the final price or terms will not be known by the Owner until the sealed bid is opened. If written confirmation is not received within two days from the closing time, no consideration will be given to the telegraphic modification. 5. Qualifications of Bidder The Owner may make such investigations as he deems necessary to determine the ability of the bidder to perform the work, and the bidder shall furnish to the Owner all such information and data for this purpose, as the Owner may request. The Owner reserves the right to reject any bid if the evidence submitted by, or the investigation of, such bidder fails to satisfy the Owner that such bidder is properly qualified to carry out the obligations of the contract and to complete the work contemplated therein. Conditional bids will not be accepted. 6. Bid Security Each bid must be accompanied by cash, certified check of the bidder, or a bid bond prepared on the form of bid bond attached hereto, duly executed by the bidder as principal and having as surety thereon a surety company approved by the Owner, in the amount of 10% of the bid. Such cash, checks, or bid bonds will be returned to all except the three lowest bidders with three days after the opening of bids, and the remaining cash, checks or bid bonds will be returned promptly after the Owner and the accepted bidder have executed the contract, or, if no award has been made within 60 days after the date of the opening of bids, upon demand of the bidder at any time thereafter, so long as he has not been notified of the acceptance of his bid. 7. Liquidated Damages for Failure to Enter Into Contract The successful bidder, upon his failure or refusal to execute and deliver the Contract and bonds required within 10 days after he has received notice of the acceptance of his bid, shall forfeit 4 to the Owner, as liquidated damages for such failure or refusal , � g , the security deposited with his bid. 8. Time of Completion and Liquidated Damages Bidder must agree to commence work on or before a date to be specified in a written "Notice to Proceed" of the Owner and to fully complete the project within 90 working days thereafter. Bidder must agree also to pay as liquidated damages, the sum of $100. 00 for each consecutive calendar day thereafter as hereinafter provided in the General Condition. 9. Conditions of Work Each bidder must inform himself fully of the conditions relative to the construction on the project and the employment of labor thereon. Failure to do so will not relieve a successful bidder of his obligation to furnish all material and labor necessary to carry out the provisions of this contract. Insofar as possible, the Contractor, in carrying out his work, must employ such methods or means as will not cause any interruption of or interference with the work of any other Contractor. 10. Addenda and Interpretation No other interpretation of the meaning of the Plans, Specifications, or other pre-bid documents will b= made to any bidder orally. Every request for such interpretation should be in writing addressed to David Batson, Purchasing Manager, City of San Bernardino, 300 No. D Street, San Bernardino, CA 92418; and to be given consideration, must be received at least five days prior to the date fixed for the opening of bids. Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the Specifications which, if issued, will be mailed by certified mail with return receipt requested to all prospective bidders (at the respective addresses furnished for such purpose) not later than three days prior to the date fixed for the opening of bids. Failure of any bidder to receive any such addenda or interpretation shall not relieve such bidder from any obligation under his bid as submitted. All addenda so addressed shall become part of the contract documents. 11. Security for Faithful Performance Simultaneously with his delivery of the executed contract, the Contractor shall furnish a surety bond or bonds as security for faithful performance of this contract and for the payment of all persons performing labor on the project under this contract and furnishing materials in connection with the contract, as specified in the General Conditions included herein. The surety on such bond or bonds shall be a duly authorized surety company satisfactory to the Owner. 5 12 . Power of Attorney Attorneys-in-fact who sign bid bonds or contract bonds must file with each bond a certified and effectively dated copy of their power of attorney. 13 . Notice of Special Conditions Attention is particularly called to those parts of the Contract Documents and Specifications, which deal with the following: a) Inspection and testing of materials b) Insurance requirements c) Wage rates d) Stated allowance 14 . Laws and Regulations The bidder's attention is directed to the fact that all applicable State Laws, Municipal Ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout, and they will be deemed to be included in the , contract the same as though herein written out in full. 15. Method of Award - Lowest Qualified Bidder If at the time this contract is to be awarded, the lowest base bid submitted by a responsible bidder does not exceed the amount of funds then estimated by the Owner as available to finance the contract, the contract will be awarded on the base bid only. If such bid exceeds such amount, the Owner may reject all bids or may award the contract on the base bid combined with such additive alternatives applied in numerical order in which they are listed in the Form of Bid, as produces a net amount which is within the available funds. 16. Obligation of Bidder At the time of the opening of the bids, each bidder will be presumed to have inspected the site and to have read and to be thoroughly familiar with the Plans and Contract Documents (including all addenda) . The failure or omission of any bidder to examine any form, instrument or document shall in no way relieve any bidder from any obligation in respect of his bid. 17. Bidding and Negotiation Requirements Attention of bidder is directed to the requirements of the U.S. Housing and Urban Development agency regarding bidding and negotiation requirements. Prior to the signing of the contract, a preliminary statement of work force needs, (skilled, semi- skilled, unskilled labor and trainees by category) shall be provided where known, where not known, such information shall be 6 supplied prior to the signing of any contract between Contractors and their subcontractors. 7 PROPOSAL R. MOODY CONSTRUCTION, INC. October 30, 2000 Job: Locker Room/Lunch Room Owner: City of San Bernardino Design Build We propose to provide all material and labor to remodel Lo er Room/Lunch Room at the City Maintenance Yard for the lump sum of$246,025.00. This quote is based on using existing walls between lunchroom and hallway and lunchroom and existing locker room We will leave existing ceiling throughout and install suspended t-bar ceiling in new meeting room. We will be using existing A.C. unit and adding one(1) 2.5 ton unit and new duct work for both units. Additional changes from the original quote: 1. Using existing electrical feeds and installing a new 100 amp service panel. 2. Delete one (1) shower is men's room. 3. Delete(1) overhead door. 4. Delete two (2) urinals and one(1) W.C. in men's restroom. 5. Delete tables and chairs. 6. Delete lockers and benches. 7. In kitchen area, install sink and icemaker only. Plumb for future refrigerator. COST SAVINGS &ADDITIVES 1. Cost increase for removing existing ceiling in lunchroom to remove post and beam and existing wall at west end of room. Install T-bar ceiling in lunchroom and meeting room. $ 6,200.00 ---- 2. Cost decrease for sealed concrete floor in lieu of ceramic tile and V.C.T. flooring. $ <4,100.00>✓ 3. Cost savings for deleting skylights. $ <2,900.00> 4. Cost increase for lockers and benches. $ 10,878.00 5. Cost decrease for deleting urinal screens. $ <500.00>1—� Respectfully submitted: o� Ronald L. Moody, siden 39821 Lincoln Street, Cherry Valley, CA 92223 (909) 769-3752 (909) 769-3712 fax T0'd -1d101 0 tv y1 j 1 1L� I j I Tr 1 In a auoyd k auoyd _ Q 7z "� � wa j }�� of f`(�" ►.Lk. ,saGec lL9L MoNxe�.D;t-}sod «� BID FOR UNIT PRICE CONTRACT PLACE: SAN BERNARDINO DATE: 10-3-00 PROJECT NO. F O1-42 Proposal of R. Moody Construction , Inc. (hereinafter called "Bidder") * a corporation, organized and existing under the laws of the State of CA a partnership, or an individual doing business as a corpuratio_n To the Purchasing rianager of the City o San Bernardino, California (hereinafter called "Owner") . Gentlemen: The Bidder, in compliance with your invitation for bids for the construction of : LOCKER-ROOM WAREHOUSE RENOVATION Having examined the Plans and Specifications with related documents and the site of the proposed work, and :aeing familiar with all of the conditions surrounding the construction of the proposed project, including the availability of materials and labor, hereby propose to furnish all labor, materials, and supplies, and to construct the project in accordance with the contract documents, within the time set forth therein, and at the prices stated below. These prices are to cover all expenses incurred in performing the work required under the contract documents, of which this proposal is a part. Bidder hereby agrees to commence work under this contract on or before a date to be specified in written "Notice to Proceed" of the Owner and to fully complete the project within 90 Working Days, thereafter as stipulated in the Specifications. Bidder further agrees to pay as liquidated damages, the sum of jloo. 00 for each consecutive calendar day thereafter as hereinafter provided in Paragraph 19 of the General Conditions. Bidder acknowledges receipt of the following addenda: *Insert corporation, partnership or individual as applicable. 8 BASIC BID SCHEDULE LOCKER-ROOM WAREHOUSE RENOVATION BASE BID: Provide all labor, materials and supervision to perform Locker-room Warehouse Renovation at City Yards, as detailed in this specification and scope of work for the LUMP SUM OF: $ � In words: $�ZzZ ��cv-t4lc�� t[cc //l��41 H-:�{ .SQL;t/, tL,­c � C-la/'—VI NOTE: The unit price must be written in words and also shown in figures. The total price must be extended for each item of work and the total of all items inserted in the space provided. In case of discrepancy between words and figures, the words shall prevail. It is the understanding of the undersigned that the work hereinafter described shall be commenced within 10 working days from the date of the "Notice to Proceed", and shall be completed within 90 working days from the date of said notice. The undersigned further agrees that in case of default in executing the contract, or furnishing necessary bonds, all within the specified time, the proceeds of the Bidder's Guarantee accompanying this proposal shall be paid to the City of San Bernardino as liquidated damages. Licensed in accordance with an act providing for and registration of Contractor, License No. 774281 Classification No. R FIRM NAME: R. Moody Construction, Inc. BUSINESS ADDRESS: 39821 Lincoln St. Cherry Valley CA 92223 SIGNATURES OF BIDDERS: / ✓/ �` — r If an individual, so state. If a irm or co-partnership, state the firm name and give the names of all individuals, co-partners composing the firm. If a corporation, state legal name of the corporation, also the names of the president, secretary, treasurer, and manager thereof. R _ Mnnt9y rnn.trnr•ti nn , Tnr_ Ronald L. Moody, President Suzanne Moody, Secretary 9 is Telephone Number ( 90g 769-3752 Fax Number (909 ) 769-3712 Dated: October 3 ,2000 BIDDERS ACKNOWLEDGEMENT OF ADDENDUNS: ADDENDUM NO. 1 DATE: ADDENDUM NO. 2 DATE: ADDENDUM NO. 3 DATE: r. 10 R. Moody Construction, Inc. BIDDERS FIRM NAME DESIGNATION OF SUB-CONTRACTORS In compliance with the provisions of Section 4100-4110 of California Public Contract Code of the State of California, and any amendments thereof, each bidder shall set forth the name and location of each sub-contractor who will perform work or labor or render service to the Contractor. Agency of Name & Address MBE/WBE Under which Certification Sub-Contractor Sub-contract Specific Sub-contractor and number Telephone No. Amount Description Licensed (If Applicable) '�6'E'LwNWg Ocd - rL�ia,�:�'�a1�c, �"�ti�' �i(;<(-Z 7 c`�J'C l ►Z.�. . u� �,��, (2,, �s�f�c �te�,- ri 3 z �- 3L( S„I (71 L i1't�a�a I L� wR�1.F l��`4is ir�C — �)i�lti LtL(��,wC( �•;r'1,' L,� — Z�i1 ��� rr+��, C(;�.1LCt.7 �—l��E�w,/ %1'A}V✓ CCi -�7lJK I .Jz-j l2rti�ilt. �t:..c.i1-Ms� c� �4,'�i-(,C� �5(�i(r - 1�i��I.�'. (GL2•YL4 VN 6-fe 7-114k 7 1 z,c �L•�� Z6(��;,� t4 �'"l'�'�"1 �'�l�(-l.i�� `\i�f" 1,`Y"tti.!\.�f'•tLu�, ��(,�j— �l'�/�{,{Z �,-�:U�i,' ��H�i/i.`l�Ci.l"L:fL�t{. 1 ��kl�r•- E J�� t 14 ,� 11cli-7-- 4•(, 11 CERTIFICATION I am aware of, will comply with, Section 3700 of the Labor Code, requiring every employer to be insured against liability for Worker's Compensation or to undertake self-insurance before commencing any of the work. Contractor: NAIVIEOFFIRM: R. Moody Construction, Inc. TITLE: President DATEin_-�_0 ld 14 (This affidavit shall be executed by all bidders at the time of bid submittal. Failure to execute the affidavit on this page will result in rejection of bid.) NON-COLLUSION AFFIDAVIT To the Division of Public Works, Department of Development Services, City of San Bernardino, State of California: The undersigned in submitting a bid for performing the following work by contract, being duly sworn, deposes and says: That he has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with such contract. Signature of Biddef �ga�i � i-nc�ln St Cherry Valley CA 92223 Business Address Cherry Val 1 Per, rA Place of Residence Subscribed and sworn to before me this _day of �,t.o b r ,2000. Notary Public in and for the County of State of California. My commission expires on , 20 t3 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT rrc - I State of California ,. ss. County of SAN BERNARDINO l On CC4- 2, ZCIC , before me, DWIGHT REILLY, NOTARY PUBLIC Date Name and Title of Officer(e.g..'Jane Doe,Notary Public') personally appeared RONALD L. MOODY---------------------------- Name(s)of Signer(s) ® personally known to me O proved to me 'on the basis of satisfactory DWIGHT R9LLY C xnmhs1on#IZM49 evidence Notcry Pubillic-cdt11bil Z San Bemorldino Coady to be the personN) whose name) isloo My Corm aoresSep3 4 subscribed to the within instrument and acknowledged to me that hel"XIM9 executed the same in his/tx9t~XjKGtr authorized l capacity(ig�o, and that by his/WxM)cr signatureW on the instrument the person(lo, or ' the entity upon behalf of which the person(4 acted, executed the instrument. l 1 WITNESS my hand and official seal. Place Notary Seal Above Signature of Notary Public DWIGHT REILLY OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document l and could prevent fraudulent removal and reattachment of this form to another document. l I Description of Attached Document Title or Type of Document: run L�'���1•• cif ahz"/` 1 ' Document Date: %L 2 7--%z Number of Pages: i Signer(s) Other Than Named Above: jt . ,+ i l i Capacity(ies) Claimed by Sianer Signer's Name: �7 ­ruk I1-vt(,u+:L7 ❑ Individual Top of Ihumb here F� Corporate Officer—Title(s): 12 (CLU J' ❑ Partner—❑ Limited ❑ General 1� ❑ Attorney in Fact ❑ Trustee f ❑ Guardian or Conservator ❑ Other: Signer Is Representing: � 1 0 1997 National Notary Association•9350 De Soto Ave.,P.O.Box 2402•Chatsworth,CA 91313-2402 Prod.No.5907 Reorder:Call Toll-Free 1.800.876.6827 i- Row . , 33" Rrooklyn Avenue N.E. VA 98105 BOND Conforms with The American Institute of Architects,A.I.A. Document No.A-310 KNOW ALL BY THESE PRESENTS,That we, R. MOODY CONSTRUCTION, INC . 39821 LINCOLN STREET, CHEERY VALLEY, CA 92223 as Principal,hereinafter called the Principal, and the FIRST NATIONAL INSURANCE COMPANY OF AMERICA of 2677 N MAIN STREET, SUITE 600, SANTA ANA, CA 92705 ,a corporation duly organized under the laws of the State of Washington ,as Surety,hereinafter called the Surety,are held and firmly bound unto CITY OF SAN BERNARDINO as Obligee,hereinafter called the Obligee, in the sum of TEN PERCENT OF THE TOTAL BID AMOUNT Dollars($ 10%***************) ,for the payment of which sum well and truly to be made,the said Principal and the said Surety,bind ourselves,our heirs,executors,administrators,successors and assigns,jointly and severally, firmly by these presents. REAS, the Principal has submitted a bid for LOCKER ROOM WAREHOUSE RENOVATION AT CITY YARD NOW,THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void,otherwise to remain in full force and effect. Signed and sealed this 13TH day of SF.PTP.MRF.R , 9000 R. MOODY CONSTRUCTION, INC . (Seal) Principal Witness { <�—"�7 Awl.sX�-i-/ f 7- I Title FIRST NATIONAL INSURANCE COMPANY OF AMERICA Witness By ll DWIGHT REILLY Attorney-in-Fact S-0054/FNEF 7198 0 Registered trademark of SAFECO Corporation. CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT ' c.C(':c!'C�':C�CiD.CS;CY.`;CC<C'S:Cf. .•C'ACS;C;r:cCL?C!.?Cf•{C,?Cf?:Cf4�Y�;S!1C!�d!;:eSRt?C�CC;a<:F.f.:WLtf.SC!:.tSrc�:f:':;c•:�:':�:C!'F'^:�c!.'<C!YC��-� State of California ss. County of SAN BERNARDINO On SEPT 13 , 2000 , before me, CLAUDETT�Er N . MARTIN NNOTAR B�IC personally appeared DWIGHT REILLY--N+�Iijp1e�..lrl XXpersonally known to me j p proved to me on the basis of salislaclory 4! evidence to be the person(Aq whose name(9 isR-VY& . subscribed -to the within instrumenl and acknowledged to me that he/ZMMK)Kexeculed the same In his/t "X' authorized capacily(Tdt), and that by hls/ijMKOK CLAUDEREKWRRN1 signalure(?q on the Instrument the personQs),or Q 4 Commisskxi#11775— - Z the entity upon behalf of which the pefsonA a. Notc yPub[ic-cca mia acted, executed the instrument. - \ x,�r My GarnrrLEsM29, OQ2 WITNESS my Band and official seal. Unr „ �iBA sk IVIS oI Norery r ti plOCeNOterysneinb0� .. CLAUDETTE N . MARTIN .. . . OPTIONAL i7rough fire informaffon below is nor requlred by law, elying on(Ire document It may prove valuable to persons r end could prevent fraudulent removal end reattachment of this form to another document. Description of Attached Do Bm nSOND Title or Type of Document: Document Date: SEA FR i '1 + 2 n no Number of Pages: 1 I Signer(s) Other Than Named Above: NONE Capacity(les) Claimed by Signer Signer's Name: DWIGHT REILLY- i i Top of Ir,vmb hers p Individual p Corporate Officer—Tille(s): O Partner—O Limited D General fX /worney in Fact p Trustee 0 Guardian or Conservator O Other: Slgner Is Representing: F IR,5jL- IAT LON L-zNS Cfl- bE�CA C�C�`T.LZC�I�CC�ZT�LrCCC� C�'�vl �>'GL`^ZCZ`C�U CL`CLCL�L��ti•L(L'GCL�ZCt�•rCZro 1- ().@7d2 • �.c�ccc�c�cL prod,No.5901 neadm:Crlr io1l�Fre•I•eoo•ere-ee2T o I 99 NePonei Nolery A43006110n•9050 o+Solo nv*.,P.O.eo■2402.Ch4ew0rrh.CA 91010.2+01 i • POWER FIRST NATIONAL INSURANCE COMPANY OF AMERICA Ima 4333 BROOKLYN AVE NE OF ATTORNEY SEATTLE,WASHINGTON 98105 43 Brooklyn Avenue N.E. WA 98105 No. 9932 <NOW ALL BY THESE PRESENTS: That FIRST NATIONAL INSURANCE COMPANY OF AMERICA,a Washington corporation,does hereby appoint .+►aa►*►►«►r•*a*aau►►►«r►r►*►*►r«««a•ra•a**r*•a►r►►*•****•***DWIGHTREILLY,Upland,Califorrlla►►aa►►r►►►►►*a•«*«*r*rr►*•*a►*«►**►►rara•*►ar•sr**•r►*►a*►a*.► Is true and lawful attorney(s)-in-fact,with full authority to execute on behalf of the company fidelity and surety bonds or undertakings and other documents of a similar character issued by the company in the course of its business, and to bind FIRST NATIONAL INSURANCE COMPANY OF AMERICA thereby as fully as if such nstruments had been duly executed by its regularly elected officers at its home office. IN WITNESS WHEREOF,FIRST NATIONAL INSURANCE COMPANY OF AMERICA has executed and attested these presents this 25th day of May 1999 �6 g � R.A.PIERSON,SECRETARY W.RANDALL STODDARD,PRESIDENT CERTIFICATE Extract from the By-Laws of FIRST NATIONAL INSURANCE COMPANY OF AMERICA: V, Section 13. - FIDELITY AND SURETY BONDS ... the President, any Vice President, the Secretary, and any Assistant Vice President appointed for that by the officer in charge of surety operations,shall each have authority to appoint individuals as attorneys-in-fact or under other appropriate titles with authority to ex- _,a on behalf of the company fidelity and surety bonds and other documents of similar character issued by the company in the course of its business... On any instrument making or evidencing such appointment, the signatures may be affixeif by facsimile. On any instrument conferring such authority or on any bond or undertaking of the company, the seal,or a facsimile thereof,may be impressed or affixed or in any other manner reproduced;provided, however,that the seal shall not be necessary to the validity of any such instrument or undertaking." Extract from a Resolution of the Board of Directors of FIRST NATIONAL INSURANCE COMPANY OF AMERICA adopted July 28, 1970. "On any certificate executed by the Secretary or an assistant secretary of the Company setting out, (i) The provisions of Article V,Section 13 of the By-Laws,and (ii) A copy of the power-of-attomey appointment,executed pursuant thereto,and (iii) Certifying that said power-of-attomey appointment is in full force and effect, the signature of the certifying officer may be by facsimile,and the seal of the Company may be a facsimile thereof." I, R.A. Pierson, Secretary of FIRST NATIONAL INSURANCE COMPANY OF AMERICA, do hereby certify that the foregoing extracts of the By-Laws and of a Resolution of the Board of Directors of this corporation, and of a Power of Attorney issued pursuant thereto, are true and correct, and that both the By-Laws, the Resolution and the Power of Attorney are still in full force and effect. IN WITNESS WHEREOF,I have hereunto set my hand and affixed the facsimile seal of said corporation this 13TH day of SEPTEMBER 2000 SvRhNCE Cp SEh�, o N, • r i R.A.PIERSON,SECRETARY S-1049/FNEF 7/98 5i75ioa PnF CONFLICT OF INTEREST Interest of Members, Officers, or Employees of the City of San Bernardino, Members of Local Governing Body, and other Public Officials. No member, officer, or employee of the City of San Bernardino, of its designees or agents, no member of the governing body of the City of San Bernardino, and no other public official of such locality who exercise any functions or responsibilities with respect to the LOCKER- ROOM WAREHOUSE RENOVATION during his tenure or for one year thereafter, shall have any interest, direct or indirect, in this contract or any subcontracts, or the proceeds thereof, for work to be performed in connection with construction of said improvements of LOCKER-ROOM WAREHOUSE RENOVATION 16 CONTRACT THIS AGREEMENT, made this day of_ , 2000, by and between the City of San Bernardino, herein called "Owner", acting herein through its Purchasing Manager, and R. MOODY CONSTRUCTION, INC. 39821 Lincoln St. Cherry Valley, CA 92223 of Cherry Valley , County of Riverside and State of California hereinafter called "Contractor". WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the OWNER, the CONTRACTOR hereby agrees with the OWNER to commence and complete the construction described as: LOCKER-ROOM WAREHOUSE RENOVATION AT CITY YARDS PER PROJECT NO. F 01-42 Two Hundred Forty Seven Thousand, Hereinafter called the project, for the sum of Sig Hundred Twenty-Five and 00/00 dollars (_$ 247,625.00 ) and all extra work in connection therewith, under the terms as stated in the General and Special Conditions of the Contract; and at his (its or their) own proper cost and expense to furnish all the materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to complete the said project in accordance with the conditions and prices stated in the Proposal, the General Conditions, Supplemental General Conditions and Special Conditions of the Contract, the Plans which include all maps, plans, blueprints, and other drawings and documents therefore, as prepared by the City of San Bernardino, herein entitled the Purchasing Manager, and as enumerated in Article 2 of the Supplemental General Conditions, all of which are made a part thereof and collectively evidence and constitute the contract. The Contractor hereby agrees to commence work under this contract on or before a date to be specified in a written "Notice to Proceed" of the Owner and to fully complete the project within 90 working days thereafter. The Contractor further agrees to pay, as liquidated damages, the sum of$100.0 0 for each consecutive calendar day in finishing the work in excess of the number of working days prescribed above. C 17 ^3 AGREEMENT: LOCKER-ROOM WAREHOUSE RENOVATION IN WITNESS WHEREOF, the parties of these present have executed this contract in four(4) counterparts, each of which shall be deemed an original in the year and day first above mentioned. City of San Bernardino (Owner) (SEAL) ATTEST: BY: City Clerk Mayor -(SEAL) Contractor BY: Secretary Witness Title Address and Zip Code NOTE: Secretary of the Owner should attest. If Contractor is a corporation, Secretary should attest. Approved as to form and Legal content: JAMES F. PENMAN, City Attorney By: 18 SPECIAL PROVISIONS SECTION I SPECIFICATIONS AND PLANS 1-1.01 GENERAL -- The work embodied herein shall be done in accordance with the Standard Specifications for the Public Works Construction, 1997 Edition, and City of San Bernardino Standard Drawings, insofar as the same apply and in accordance with the following Special Provisions. 1-1.02 DEFINITIONS --Whenever in the Standard Specifications the following terms are used, they shall be understood to mean and refer to the following: Agency - The City of San Bernardino Board - The Mayor and Common Council for the City of San Bernardino Engineer -The Director of Public Works/City Engineer Laboratory -The laboratory to be designated by the City of San Bernardino to test materials and worked involved in the contract. Notice Advertising for Bids Notice Inviting Bids. Standard Specifications Standard Specifications for Public Works Construction Other terms appearing in the Standard Specifications, and these Special Provisions, shall have the intent and meaning specified in Section 1-2, "Definitions", in the Standard Specifications. In case of conflict between the Standard Specifications, and these Special Provisions, the Special Provisions will take precedence over and be used in lieu of such conflicting portions. 19 SECTION 2 2-1 PROPOSAL REQUIREMENTS AND CONDITIONS 2-1.01 GENERAL--Bids must be submitted on the proposal form contained herein. All bids or proposals shall be signed, sealed and accompanied by cash; cashiers check or bid bond made payable to the City of San Bernardino, in the amount of ten percent (10%)of the bid. Such cash, check or bond shall be given as a guarantee that the bidder will enter into the contract, if awarded to him. In the event the bidder, to whom the contract is awarded, refuses to execute said contract,the use by the public of the improvements will be delayed and the public will suffer great damage. From the nature of the case, it would be extremely difficult and impractical to fix said amount of damage. Therefore, the City and the bidder agree that the proposal guarantee of 10% of the bid shall be paid to the City as forfeiture. Bid bonds shall be underwritten by a surety company having a rating in Best's most recent Insurance Guide of"A" or better. 2-1.02 MINORITY AND WOMEN'S BUSINESS ENTERPRISES -- A policy for establishing goals for participation of Minority and Women's Business Enterprises (MBE/WBE)was adopted by Resolution No. 95-409 of the Mayor and Common Council of the City of San Bernardino, on 11-20-95. This outreach program superseded Resolution No. 93-411 and the Standard Operation Procedures dated January 1994. Bidder's or Proposer's outreach efforts(good faith efforts) must reach out to MBEs, WBEs, and all other business enterprises. Prime bidders could reasonably be expected to produce a level of participation by interested subcontractors of 0 %MBE and 0%WBE on this project. Bidders shall make every reasonable effort to solicit bids from MBE/WBEs. A justification shall be provided to support the rejection of any bid from a minority or women's business enterprise, certified by Caltrans. 20 POLICY MINORITY, WOMEN AND OTHER BUSINESS ENTERPRISES AND CITY PROCUREMENTS It is the policy of the City of San Bernardino to provide Minority Business Enterprises (MBEs), Women Owned Business Enterprises (WBEs) and all other enterprises an equal opportunity to participate in the performance of all City contracts. Bidders and proposers shall assist the City in implementing this policy by taking all reasonable steps to ensure that all available business enterprises, including local MBEs and WBEs, have an equal opportunity to compete for and participate in City contracts. Bidders' or proposers'good faith efforts to reachout to MBEs, WBEs and all other business enterprises shall be determined by the following factors: (1) The bidder or proposer attended pre-solicitation or pre-bid meetings, if any, scheduled by the City to inform all bidders or proposers of the requirements for the project for which the contract will be awarded. The City may waive this requirement if the bidder or proposer certifies it is informed as to those project requirements. (2) The bidder or proposer identified and selected specific items of the project for which the contract will be awarded to be performed by sub- contractors to provide an opportunity for participation by MBEs, WBEs and other business enterprises. The bidder or proposer shall, when economically feasible, divide total contract requirements into small portions or quantities to permit maximum participation of MBEs, WBEs and other business enterprises. (3) The bidder or proposer advertised for bids or proposals from interested business enterprises not less than ten calendar days prior to the submission of bids or proposals, in one or more daily or weekly newspapers, trade association publications, minority or trade oriented publications, trade journals, or other media specified by the City. (4) The bidder or proposer provided written notice of its interest in bidding on the contract to those business enterprises, including MBEs and WBEs, having an interest in participating in such contracts. All notices of interest shall be provided not less than ten calendar days prior to the date the bids or proposals were required to be submitted. In all instances, the bidder or proposer must document that invitations for sub-contracting bids were sent to available MBEs, WBEs and other business enterprises for each item of work to be performed. The Mayor's Affirmative Action Office shall be available to help identify interested MBEs, WBEs and other business enterprises. (5) The bidder or proposer documented efforts to follow up initial solicitations of interest by contracting the business enterprises to determine with certainty whether the enterprises were interested in performing specific portions of the project. (6) The bidder or proposer provided interested enterprises with information about the Plans, Specifications and requirements for the selected sub-contracting work. (7) The bidder or proposer requested assistance from organizaitons that provide assistance in the recruitment and placement of MBEs, WBEs and other business enterprises not less than fifteen days prior to the submission of bids or proposals. (8) The bidder or proposer negotiated in good faith with interested MBEs, WBEs and other business enterprises and did not unjustifiably reject as unsatisfactory bids or proposals prepared by any enterprises, as determined by the City. As documentation the bidder or proposer must submit a list of all sub-bidders for each item of work solicited, including dollar amounts of potential work for MBEs, WBEs and other business enterprises. (9) The bidder or proposer documented efforts to advise and assist interested MBEs, WBEs and other business enterprises in obtaining bonds, lines of credit, or insurance required by the City or Contractor. If the City has established expected levels of participation for MBE and WBE sub-contractors, failure to meet those levels shall not be a basis for disqualification of the bidder or proposer. A determination of the adequacy of a bidders' or proposers'good faith effort must be based on due consideration of the indicia of good faith as set forth above. In the event that the City is considering awarding away from the lowest bidder or not awarding a contract to a proposer because the bidder or the proposer is determined to be non-responsive for failure to comply with the good faith indicia set forth above, the City shall, if requested, and prior to the award of the contract, afford the bidder or proposer the opportunity to present evidence to the Mayor and Common Council in a public hearing of the bidders' or proposers'good faith efforts in making its outreach. In no case should the City award away pursuant to this program if the bidder or proposer makes a good faith effort but fails to meet the expected levels of participation. For the purposes of this Policy, "minority" shall be synonymous with "Minority person" as defined in California Public Contract Code Section 11) 2000(f). Nothing herein restricts the discretion of the City to reject all bids or proposals in accord with Charter Sections 140 and 238 or Chapter 3.04 of the San Bernardino Municipal Code. The directions set forth herein shall take effect immediately, and all City Departments shall modify their implementation programs to the extent such programs are inconsistent with this policy. SECTION 3 THROUGH SECTION 5 BLANK 14 SECTION 6 6-1 GENERAL 6-1.01 INCREASED OR DECREASES QUANTITIES — If the total pay quantity of any item of work, subject to the provisions in Section 3-2.2.1, "Increased or Decreased Quantities", of the Standard Specifications varies by more than 25 percent(25%), compensation payable to the Contractor will be determined in accordance with said Section 3-1.2.1, and these Special Provisions. When the compensation.payable for the number of units of an item of work performed in excess of 125 percent (125%) of the Engineer's Estimate is less than $1,500 at the applicable contract unit price, the Engineer reserves the right to make no adjustment in said price if he so elects, except that an adjustment will be made if requested in writing by the Contractor. Such Contractor's request shall be accompanied by adequate, detailed data to support costs of the item. Should the total pay quantity of any item of work required under the contract be less than 75 percent(75%) of the Engineer's Estimate, therefore, the Engineer reserves the right to make no adjustment in said price if he so elects, except that an adjustment will be made if requested in writing by the Contractor. Such Contractor's request shall be accompanied by adequate, detailed data to support costs of the item. The payment of the total pay quantity of such item of work will in no case exceed the payment which would be made for the performance of 75 percent (75%) of the Engineer's Estimate of the quantity at the original contract unit price. 6-1.02 SOUND CONTROL REQUIREMENTS -- Sound control shall comply with Chapter 8.54 of the City of San Bernardino Municipal Code and these Special Provisions. The noise level from the Contractor's operations, between the hours of 9:00 p.m. and 6:00 a.m., shall not exceed 86dbA at the distance of 50 feet. This requirement in no way relieves the Contractor from responsibility for complying with local ordinances regulating noise levels. 25 Said noise level requirements shall apply to all equipment on the job or related to the job, including but not limited to trucks,transit mixers, or transient equipment that may or may not be owned by the Contractor. The use of loud sound signals shall be avoided in favor of light warnings except those required by safety laws for the protection of personnel. 6-1.03 PERMITS AND LICENSE--The Contractor shall obtain a City Business Registration, prior to the execution of the contract. 6-1.04 EXTRA HOURS -- Any extra work done shall conform to the provisions of Section 3.3, "Extra Work", of the Standard Specifications, subject to the restrictions of Section 20452 and 20455 of the Public Contract Code. However, equipment rental rates shall conform to State of California Business and Transportation Agency, Department of Transportation, Division of Construction, "LABOR AND EQUIPMENT RENTAL RATES", latest edition, unless the extra work is done for a negotiated price. 6-1.05 HOURS OF LABOR-- In the event that the Engineer is required by the Contractor's operations to work more than forty(40) hours in any given week, or on any Saturday, Sunday or Holiday, in the setting of Lines and Grades or performing inspections, the Contractor shall pay an amount to the City equal to one-and-a-half(1 1/2)times the Engineer's normal wages and fringe benefits. Such amount shall be deducted from the next progress payments. Designated legal Holidays are; January Vt., the third Monday in January, the last Monday in May, July 4a'., the first Monday in September, November 11'x'., Thanksgiving Day, and December 25th. When a designated legal holiday falls on a Sunday, the following Monday shall be a designated legal holiday. When a designated legal holiday falls on a Saturday, the preceding Friday shall be designated as a legal holiday. 6-1.06 PAYMENTS -- Attention is directed to Section 9-3, "Payments", and 9-3.2, "Partial and Final Payment", of the Standard Specifications and these Special Provisions. No partial payment will be made for any materials which are furnished but not incorporated in the work. The Contractor shall submit "As-Built" project drawings to the Construction Engineer(City) prior to the release of final payment and/or bonds. 6-1.07 PROJECT APPEARANCE -- The contractor shall maintain a neat appearance to the work. In any area visible to the public, the following shall apply: When practicable, broken concrete and debris developed during clearing and grubbing shall be disposed of concurrently with its removal. If stockpiling is necessary, the material shall be removed or disposed of weekly. 6-1.08 DISPOSAL OF EXCESS EXCAVATED OR REMOVED MATERIAL -- Unless otherwise specified, all excess excavation or removed material shall become the property of the Contractor and shall be disposed of by him away from the site of work. Full compensation for conforming to the requirements of Section 6 shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor. 6-1.09 ATTORNEY'S FEES --The prevailing party in any legal action to enforce or interpret any provisions of this Agreement will be entitled to recover from the losing party all attorney's fees, court costs, and necessary disbursements in connection with that action. The costs, salary and expenses of the City Attorney, and members of his office, in connection with that action shall be considered as attorney's fees for the purposes of this Agreement. 17 SECTION 7 BLANK AV �R SECTION 8 8-1 DESCRIPTION OF WORK 8-1.01 DESCRIPTION-- The City of San Bernardino wishes to obtain the design/construction services of a professional firm to prepare the Plans, Specifications, and Construction Bids for the Steel Building Renovation to the Locker-room Warehouse at the San Bernardino City Yard and to complete construction of said project. Plans and Specifications must conform to the requirements of the City of San Bernardino and the requirements listed in the Standard Specifications for Public Works Construction(Green Book). 79 SECTION 9 THROUGH SECTION 55 BLANK 30 TECHNICAL SPECIFICATIONS F 01-42 LOCKER-ROOM WAREHOUSE RENOVATION OWN 31 O� $a17 B '�f'10 Request for Pro- als to os Provide Professional Design/Build Services for Steel building renovation San Bernardino City Yard Locker-room/Warehouse Building Facilities Management Department August 17, 2000 City of San Ber crew Table of Contents SERVICESREQUIRED..................................................................................... 1 DESCRIPTION OF PROJECT............................................................................ 2 RFQREQUIREMENTS ..................................................................................... 3 I11trodu tkm Services Required The City of San Bernardino wishes to obtain the design/construction services of a professional firm to prepare the Plans, Specifications and Construction Bids for the Steel Building Renovation to the Locker- room/Warehouse at the San Bernardino City Yard and to complete construction of said project. Plans and Specifications must conform to the requirements of the City of San Bernardino and the requirements listed in the Standard Specifications for Public Works Construction (Green Book). k i I' L�OC .'1'L�'100111 W11' 11114mme Description of Project The project, in general, will consist of preparation of Plans, Specifications and Construction Bid for the modification of the Locker-room/Warehouse at the City Yard. It will also include completion of a turnkey installation of the project as designed. Attached is a proposed layout of the project. Upon completion of the work, the City should have in hand complete Plans, Specifications and Construction As-builts with all supporting data, calculations and details used in the project in a format acceptable to the City. Plans do not exist for the Locker-room/Warehouse as it was constructed in the1950's. Measurements in the Locker-room/Warehouse may vary from room to room. The design/build firm is expected to verify all measurements. The scope of work is to include the following items: Demolition of existing restroom, locker room and lunchroom interior walls, plumbing, electrical, heating and ventilation, ceiling, flooring, lockers, lighting and miscellaneous. Removal and replacement of exterior sheathing/roofing, construct ridge vent and skylights. Utilize existing backbone structure Remove existing sliding exterior doors and replace with three 12' x 12' roll up doors and two hollow metal exterior doors Construct gutters and downspouts on front of building and rear side walls Construct new restroom and locker room facilities to include the following: Rest room facilities for 120 men and 10 women to include Ceramic tile, privacy partitions, mirrors, trash disposal containers �" Locker room facilities for 120 men and 10 women, including double tier lockers and benches Two Showers for men, one shower for women Lunchroom facilities to include storage, microwave, refrigerator, dishwasher, cooking facilities, sink, garbage disposal, ice machine , drinking fountain, instant hot water dispenser Lunch room to include eating area with tables Lunchroom shall have moveable privacy partition to separate portion of lunchroom for meeting area Provide windows in lunchroom area Evaluate existing air conditioning system for usability for remodeled area Evaluate existing electrical system suitability for remodel and to allow expansion to include an additional 4,000 square foot office addition Exterior walls and ceiling area for restroom and lunch room to be insulated All modifications to be consistent with latest building codes and handicapped accessibility regulations The successful vendor should expect to meet with the City on a regular basis for updates on project progress, problems and accomplishments. Preliminary contact with utilities affected by the work is also considered to be part of the work, if applicable. Inclusions and FOri nat RFP Requirements A. Three (3) copies of the letter of qualification will be submitted to Jim Sharer, Director of Facilities Management, City of San Bernardino, 300 North D Street, San Bernardino, CA 92418, no later than September 28, 2000 at 4:00 p.m. B. The letter of qualification will indicate the following in a detailed manner: 1. A proposed design to be used in the ADA improvements to the Locker-room/Warehouse. 2. Previous design/build experience and previous experience on Steel buildings and tenant improvements. 3. Staff persons specifically assigned with the project at the professional level. Provide name, position, and experience summary. 4. Support personnel to be used on this project, including names and titles 5. Consultants and subcontractors to be used for specific aspects of the project, including a summary of previous working arrangements on similar types of work. 6. A time chart for completion of the work, showing work time, as well as a calendar time, including allowances for review periods. 7. IN A SEPARATE, SEALED ENVELOPE, provide a quote/bid associated with each of the tasks identified in the proposal to complete the design/build work and a total project quote/bid for all aspects of the work, including construction. A form is included in this package for your bid. C. This "Request for Proposals" does not commit the City to award a contract, to pay any costs incurred in the preparation of a proposal in response to this request, or to procure or contract for any services. The City reserves the right to accept or to reject, in part or in its entirety, the request for qualifications if such action is deemed to be in the best interest of the City. r " D. Qualifications will be reviewed and supplemental interviews will be conducted at a later date and prior to the selection of any one of the firms submitting proposals. E. Any contract entered into as a result of this proposal will be considered to include the items of work detailed in the proposal unless specifically deleted at the request of the City. F. Any request for additional information or clarification should be submitted to Jim Sharer, Director of Facilities Management, at (909) 384-5244 or(909) 384-5012 for Fax. j • r i I I � i ® i----- -------- - ------ ------------- ILL I �• 0 LC I � cc