HomeMy WebLinkAbout17- Development Services . 1 1 CITY OF SAN.BERNAkbINO - REQUEST FOR COUNCIL ACTION From: William Woolard, Interim Director Subject: Authorization to execute Change Order No. Two to contract with David T. Dept: Development Services Wasden, Inc. for storm drain improvements in "E" Street from 4th Street to 5th Street, Date: December 6, 2000 and pavement rehabilitation from 4"' Street to 6th Street. File No. 4.7207 MCC Date: 12/18/2000 Synopsis of Previous Council Action: 07/10/00 Allocation of $50,000 for pavement rehabilitation at "E" Street (Account No. 129- 367-5504-7192), and $200,000 for storm drain improvement at "E" Street from 4`' to 5' Streets (Account No. 248-368-5504-7207) in 2000/01 Capital Improvement Program budget. 10/02/00 Adopted Resolution awarding contract to David T. Wasden, Inc. in the amount of $178,798.50 for construction of storm drain improvements on "E" Street from 4'h to 5"' Streets, and pavement rehabilitation on "E" Street from 4`h to 6' Streets. 12/04/00 Authorized execution of Change Order No. One to contract with David T. Wasden, Inc. in the amount of $7,452.34. Recommended Motion: That the Mayor and Common Council approve Contract Change Order No. Two to the contract with David T. Wasden, Inc. for storm drain improvements in "E" Street from 4th Street to 5th Street, and pavement rehabilitation from 4th Street to 6`h Street and authorize the Purchasing Manager to increase Purchase Order 994408 by an amount equal to $26,493.70 to cover the cost of this change order. > William Woolard Contact person: Michael Grubbs, Field Engineer Phone: 5179 Supporting data attached: Staff Report and Change Order Ward: 1 FUNDING REQUIREMENTS: Amount: $26,493.70 Source: (Acct. No.'s) 248-368-5504-7207, 129-367-5504-7192 & CDBG 99-0039 Acct. Description: "B" Street pavement rehab.; storm drain improvements at "E" St.; and street resurfacing downtown area Finance: Council Notes Agenda Item No. CITY OF SAN BERNARDINO — REQUEST FOR COUNCIL ACTION STAFF REPORT Subject: Authorization to execute Change Order No. Two to contract with David T. Wasden, Inc. for storm drain improvements in "E" Street from 4th Street to 5th Street, and pavement rehabilitation from 4"' Street to 6`h Street. Background: On May 15, 2000, the Mayor and Common Council awarded a contract to David T. Wasden, Inc. in the amount of $178,798.50 for storm drain improvements in "E" Street from 4th Street to 5th Street and pavement rehabilitation from 4" Street To 6`h Street. During construction, subsurface conditions were encountered which were different from the conditions shown on the plans. Under Section 3-4 "Changed Conditions" of the Standard Specifications, the contractor is allowed to recover additional costs due to "subsurface or latent physical conditions differing materially from those represented in the contract.99 The Mayor and Common Council on 12/04/00 approved contract Change Order No. One in the amount of $7,452.34. This change order reimbursed the contractor for pot holing of utilities, on October 16-19, 2000, that were encountered during construction. The costs incurred due to this change order were primarily due to utility conflicts and are described in detail in the attached Change Order No. Two. The total net cost of the change is $26,493.70. This project was awarded on an accelerated working/calendar day schedule with a mandatory completion date of November 18, 2000, subject to a liquidated damage penalty of $1,500 per day for each calendar day used past November 18, 2000. David T. Wasden, Inc. worked closely with City staff to assure completion of the project within the specified time limit. The contractor also incurred some delays awaiting field design changes to the storm drain due to the utility conflicts. However, those delays were minimal due to the level of cooperation between staff and the contractor and therefore there were no additional charges associated with the delays. Although the total cost of the project ($212,744.54) exceeds the original bid amount plus contingencies ($178,798.50+$26,881.50=$205,680.00), it was still $10,034.36 less than the second lowest bid amount of$222,778.90 and well within the total budget originally authorized for the project. STAFF REPORT continued Financial Impact: Sufficient funds are available for the cost of this change order, Change Order No. One, and remaining inspection and testing costs, from the unencumbered balance in Account No. 248- 368-5504-7207 (Storm drain improvements at "E" Street - $26,771) and Account No. 129- 367-5504-7192 (Pavement rehab at "E" Street - $15,818). Recommendation: That the Mayor and Common Council authorize execution of Change Order No. Two to contract with David T. Wasden, Inc. for storm drain improvements in "E" Street from 4th Street to 5th Street, and pavement rehabilitation from 4' Street to 6" Street and authorize the Purchasing Manager to increase Purchase Order No. 994408 by an amount equal to $26,493.70. Rnwi DEVELOPMENT SERVICES DEPARTMENT ICITY OF 300 North"D"Street•San Bernardino•CA 92418-0001 San Berflardln0 Planning&Building 909.384.5057•Fax: 909.384.5080 s, Public Works/Engineering 909.384.5111 •Fax: 909.384.5155 www.ci.san-bernardino.ca.us CONTRACT CHANGE ORDER NO. TWO FILE NO. 4.7207 DATE: DECEMBER 6,2000 PROJECT: STORM DRAIN IMPROVEMENTS IN "E" STREET FROM 4TH STREET TO 5TH STREET AND PAVEMENT REHABILITATION FROM 4TH STREET TO 6TH STREET. TO: David T. Wasden, Inc. 3220 Star Canyon Circle Corona, CA 91720 GENTLEMEN: You are hereby compensated for performing additional work as follows: Description of Change Cost Item 1: Increase in item 6 (24" RCP) due to increased trench depth $ 9,636.00 Item 2: Increase in item 7 (18" RCP) due to increased trench depth $ 2,490.00 Item 3: Increase in item 8 (manhole No 2) due to increase in trench $ 6,000.00 depth. Item 4: Increase in item 9 (CB no 1, w=3.50') due to increase in trench $ 1,500.00 depth. Item 5: Increase in item 10 (CB no 2, w=7.00') due to increase in trench $ 1,750.00 depth. Item 6: Increase in item 11 (CB no 3, w=14.00') due to increase in $ 2,250.00 trench depth. Subtotal of Items I through 6...................... $ 23,626.00 Contract Change Order No. Two Storm Drain Improvements in "E" St. from 4th St. to 5th St. & Pavement Rehab from 4th St. to 6th St Page 2 of 3 Item 7: Modification to concrete collar at d/s outlet to provide for two 18" $ 2,000.00 RCP's. Item 8: Slurry backfill on 5th Street crossing to assure proper support for $ 1,000.00 utilities. Item 9: Replace 24 feet of 18" RCP n/s of 5th in flat section with 24" $ 7,079.53 elliptical RCP 2000-D, including concrete collar. Subtotal items 7through 9........................... S 10,079.53 GRAND TOTAL COST OF CHANGE ORDER NO. TWO..... $ 33,705.53 JUSTIFICATION Items 1-6: As a result of the pot-holing authorized by CCO #1 it was determined that a cluster of GTE fiber optic ducts crossing at Station 15+03 in "E" Street was in conflict with the proposed location of the storm drain. Additionally, a sewer main at Station 11+95 was found to constrain the lower limit of the storm drain To get over the sewer main and under the cluster of fiber optic ducts, surveyors determined accurate elevations of the utility lines and staff re-designed the profile of the storm drain. The re-design involving lowering the storm drain so as to "squeak" between the utilities. This change resulted in an increase in the depth of the storm drain varying from 1 foot at the downstream end to 3 feet at the upstream end (15% to 50% increase in depth). Increasing the depth of the storm drain resulted in additional costs for the contractor. Item 7: In order to get under a bank of Pacific Bell Telephone conduits at the downstream end of the project ("E" Street just north of 4th Street) the plan had to be modified by substituting two 18" RCP pipes in place of one 24" RCP pipe. This replacement solved the clearance problem but required a more complex concrete collar to join the two 18" RCP's to the existing catch basin structure. Item 8: In order to install the storm drain across 5th Street just west of "E" Street it was necessary to close 5th Street for one day to accommodate the installation. To minimize impact on traffic, the work was accomplished on Saturday October 28, 2000. The installation procedure involved excavating across the street, installing the storm drain pipe, backfilling and restoring the pavement. When backfilling the trench with native soil proper compaction must be achieved in order to avoid settlement of the pavement. To expedite reopening of the street to traffic, the contractor was authorized to backfill the trench with a one sack cement-sand slurry mix, eliminating the need for compaction testing. This allowed 5th Street to be reopened to traffic the r Contract Change Order No. Two Storm Drain Improvements in `B" St. from 4th St. to 5th St. & Pavement Rehab from 4' St. to 6th St. Page 3 of 3 same day and allowed the City to avoid the cost of having a soils technician available on an overtime basis to perform the required compaction testing. In order to slip through the utilities in 5th Street it became necessary to reduce the slope of the proposed 18 inch RCP for a length of approximately 24 feet. Reducing the slope of the pipe resulted in a reduction in the amount of flow the pipe could carry. To assure that the storm drain would be able to carry flow equal to the original design it was necessary to change the 18 inch RCP to an elliptical 24" RCP. The elliptical pipe had to be used in order to achieve proper clearance from the pavement surface. The total project cost is summarized as follows: Original Contract Amount $178,798.50 Contract Change Order No. One $ 7,452.34 Proposed Contract Change Order No. Two $ 33.705.53 Total Original Contract Cost plus Change Orders $219,956.37 Increase (decrease) in cost due to overruns/underruns ($ 7.211.83) Adjusted Contract Amount $212,744.54 Net Increase in project cost due to Change Order#2: $ 26,493.50 ($33,705.33 - $7,211.83) Additional time to complete Contract due to Change Order.................0 Working Days DAVID T. WASDEN, INC. CITY OF SAN BERNARDINO CONTRACTOR DEVELOPMENT SERVICES Accepted Approved: By: By: Bill Woolard Title: Interim Dir. of Development Svcs. Date: Date: Approved By Mayor and Common Council: Item Number: Approval Date