HomeMy WebLinkAbout09- Public Works CITY OF SAN BERN. JtDINO - REQUEST F..R COUNCIL ACTION File No. 1.471 ROGER G. HARDGRAVE Approval of Contract Change Order From: Subject: No. TWO - Box Culvert - Little Public Works/Engineering League Drive and Cable Creek Dept: Channel, per Plan No. 8442 - BOB BRITTON, INC. Date: 2-4-93 Synopsis of Previous Council action: June, 1989 - Allocation of $710 , 000 approved in 1989/90 Street Construction Fund Budget. 01-06-92 - Mitigated Negative Declaration, for Public Works Project No. 91-07, adopted. 09-21-92 - Resolution No. 92-387 adopted awarding a contract to Bob Britton, Inc. for the low bid price. 10-27-92 - Resolution No. 92-427 adopted authorizing execution of Program Supplement No. 71 . 10-27-92 - Resolution No. 92-428 adopted authorizing execution of Program Supplement No. 72 . Recommended motion: That Contract Change Order No. TWO to the contract with Bob Britton, Inc. , for construction of a Box Culvert and Channel Improvements at Little League Drive and Cable Creek Channel, in accordance with Plan No. 8442, be approved; to authorize the Contractor to provide additional rock slope protection along existing rail and wire revetment, at an increase in the contract price of $8,558 . 55; from $269 , 134. 15 to $277, 692. 70 . cc: Shauna Clark Barbara Pachon Sfqnliurev Contact person: Roger G. Hardgrave Phone: 5025 Staff Report, Supporting data attached: CCO c9 Ward: 5 FUNDING REQUIREMENTS: Amount: _$8 , 558 . 55 (Street Construction Fund) Source: _(Acct. No.) 242-362-57471 Acct. Description) Little League Drive Box Culvert - Cable Creek Channel Finance•ozl?'� Council Notes: 75-0262 Agenda Item No. .0? CITY OF SAN BERNAQDINO - REQUEST F�_ �q COUNCIL ACTION STAFF REPORT The plans direct the Contractor to grade the bottom of the Cable Creek Flood Control Channel, downstream of the box culvert being constructed at Little League Drive. This work was necessary in order for the channel flowline to meet the invert elevation of the new box culvert. These plans were prepared in accordance with the San Bernardino County Flood Control District' s requirements. During the unusually heavy rain storms in January, the channel bottom eroded below the rail and wire revetments along both sides of the flood control channel. The District' s Inspec- tor has directed that 1/4 ton grouted rock slope protection be installed from the box culvert to a point 340 feet downstream, in order to provent further damage from future storm flows. The quantity of rock slope protection is estimated to be 182 tons. The Contractor has agreed to do this extra work for the lump sum of $8, 558. 55, which is based upon the bid price of $45/ton for grouted rock slope protection, plus 4j$ for another move-in. There is an available balance of $55, 824 . 25 in contin- gencies that can be used to finance the cost of this change order. Federal-Aid Bridge Replacement Fund will be used to finance 80% of the cost for this extra work. We recommend that Change Order No. Two be approved. 2-4-93 15-0264 0 CONTRACT CHANGE ORDER NO. 2 REV NO. SUPPL. NO. ROAD Box Culvert-Little League Drive SHEET 1 OF 1 FED NO. BRL-5033 (004) CONTRACT NO. 8442 TO: BOB BRITTON, INC. You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the State Highway-Engineer Description of work to be done, estimate of quantities, and prices to be paid. Segregate between additional work at contract price, agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time The last percentage shown is not accumulated increase of decrease from the original quantity in the Engineers Estimate. EXTRA WORK AT AN AGREED PRICE: Install 182 Cubic Yards of 1/4 Ton Rock, at the toe of 340 lineal feet of existing rail and wire revetment, as directed by the Resident Engineer, at the agreed price of $8,558.55. ESTIMATED COST DECREASE $ INCREASE $ 8,558.55 By reason of this order the time of completion will be adjusted as follows: 20 working days Submitted by: Resident Engineer, Date: Approval Recommended: Date: Approved: City Engineer Date: We the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all material, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above Accepted Date: Contractor: By: Title: If the contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the work and filing a written protest within the time therein specified.