Loading...
HomeMy WebLinkAbout05.K- Public Works 3 DOC ID: 2186 A CITY OF SAN BERNARDINO—REQUEST FOR COUNCIL ACTION Street Vacation From: Tony Frossard M/CC Meeting Date: 02/18/2014 Prepared by: Ryan Sandoval, (909) 384-5140 Dept: Public Works Ward(s): 1 Subject: Authorization to Proceed and Approval of Plan No. 13013 — Proposed Street Vacation of a Portion of 3Rd Street Between "J" Street and "I" Street, and a Portion of 3Rd Street at the Intersection with"K" Street(#2186) Current Business Registration Certificate: Not Applicable Financial Impact: There is no financial impact associated with this action. The petitioner has paid the first half ($1,000) of the total processing fee of$2,000. Motion: Authorize the Public Works Director and the City Clerk to proceed with the proposed street vacation of a portion of 3rd Street between "J" Street and "I" Street, and a portion of 3rd Street at the intersection with "K" Street; and approve Plan No. 13013 showing the proposed street vacation of a portion of 3rd Street between "J" Street and "I" Street, and a portion of 3rd Street at the intersection with"K" Street. f Synopsis of Previous Council Action: 12/03/2012 Resolution No. 2012-279 was adopted, adopting General Plan Amendment No. 12- 05, to amend the San Bernardino General Plan Circulation Element to close a 225- ' foot long portion of 3rd Street between "J" Street and the railroad right-of-way to the east, close a 160-foot long segment of"I" Street between Rialto Avenue and the railroad right-of-way to the south to facilitate the construction of the downtown San Bernardino passenger rail project, and to add text to acknowledge the future passenger rail service by SANBAG. Background: San Bernardino Associated Governments (SANBAG) is currently working on the Downtown San Bernardino Passenger Rail Project (Redlands First Mile) which will expand mass transit options to commuters in San Bernardino and Redlands. The first phase of the proposed passenger rail project will extend between Downtown San Bernardino and the University of Redlands, and will help introduce passenger rail service to this area and meet future local and regional travel demands. An application was received from SANBAG, requesting the vacation of a portion of 3rd Street between "J" Street and "I" Street, and a portion of 3rd Street at the intersection with "K" Street. The portion of 3rd Street between "J" and "I" Streets currently has railroad tracks and a crossing over the street, but according to the Federal Railroad Administration, the Federal Highway Administration, the California Department of Transportation, and the California Public Utility Updated: 2/13/2014 by Linda Sutherland A Packet Pg.'171 I I� 2186 Commission (CPUC), it is a safety policy to consider closing at-grade crossings when other crossings are nearby. With the depot being the starting point to the First Mile Project, it was the CPUC's recommendation to consider permanent closure of 3rd Street and the removal of the crossing, as this would provide the highest level of crossing safety. There are four other crossings In close proximity to the 3rd Street crossing that will provide adequate access and traffic circulation. E The portion of 3rd Street at the intersection with"K" Street is proposed to be vacated to create a 3-way stop controlled intersection. This will change the formation of the currently aligned street, which will help with the safety concerns. It is proposed that SANBAG will also be acquiring portions of the properties on the east-side of "K" Street to allow widening as part of the rail project. The map of Rancho San Bernardino dedicated as public right-of-way, the portion of 3rd Street between "J" and "I" Streets, thus the City does not own any portion in fee. SANBAG has also provided the City with a preliminary title report that indicates the street being owned by the abutting owners. SANBAG owns the parcel abutting the north side of the proposed area to be vacated and as of the date of this request, Bruce Hefftner owns all of the parcels abutting the south side of the proposed portion to be vacated. Mr. Hefftner opposes the proposed vacation as indicated in the attached letter. SANBAG also requests that an easement be reserved within the vacated area for railroad purposes (3rd Street east of "J" Street where the railroad tracks will cross through the vacated area). jThe dedication of 3rd Street as public right-of-way at the intersection of "K" Street was accomplished through the recordation of separate documents. It has been determined that the City does not own any portion of the proposed area to be vacated in fee, and City only holds easements for street and highway purposes. If authorization to proceed is given, all City departments, utility companies and affected property owners will be notified to determine if any conflicts exist. Once all research is completed, the findings will need to be made by the Public Works Director that the proposed vacation of this portion of 3rd Street between "J" Street and "I" Street, and the portion of 3rd Street at the intersection with "K" Street are no longer needed for public right-of-way. A map depicting the general vicinity and Plan No. 13013 showing the details of the proposed vacation are attached. Supporting Documents: PLAN No. 13013 (PDF) Opposition Letter-Hefftner (PDF) Updated:2/13/2014 by Linda Sutherland A Packet Pg 172 5K.a�� I SHEET 1 OF 4 I THIRD STREET RIGHT-®F-WAY VACATION I [_I1 . of SAN BERNARDINO, Ir_A I I I LEGEND BASIS OI= B ARINGS I I P.G. INDICATES POINT OF COMMENCEMENT THE BASIS OF BEARINGS FOR THIS SURVEY IS THE TP.0.0 INDICATES TRUE POINT OF BEGINNING CALIFORNIA COORDINATE SYS EM, LONE 5, c:00' (EPOCH NSRS-2007) AS DETERMINED_ LOCALLY BY A E (Q tA!.�7�CIVES i �f'14 F3EARWG I NE Q C CONTtAUOS O E iNG � L (,,�R�N!F 2 t�4) C.e:vF::• -_ ::t:uty->_ LI17L .iET WELN ii C%It fIi-Y./vaF IIPL RA Itfr� 5E! �il�revr '•• 1 ® INDICATES PORAON OF THIRD STREET, STATIONS (COBS) `PMRY- AND "P612" BEING NORTH 1 a W n 1 • r i nr nr sin VACATED. 5i'13 4a rvEST (yR1D` HS DERIVED rROlvr vcOucCtta VACATION B-1 = 14,568 SQ. FT. VALUES PUBLISHED BY THE CALIFORNIA SPATIAL in VACATION B-2 = 19,362 SO. FT. REFERENCE CENTER (CSRC) AND/OR NATIONAL GEODETIC SURVEY (NGS), RESPECTIVELY. DISTANCES "' SHOWN ON THIS SURVEY ARE GRID DISTANCES IN U.S i o SURVEY FEET. TO OBTAIN GROUND LEVEL DISTANCES, MULTIPLY DISTANCES BY 110 99993920. BEARINGS FRROM I I o I REFERENCE DEEDS j MAPS MAY OR MAY NOT BE iN I TERMS OF SAID SYSTEM FOURTH ST. a (SANBAG) HISTORIC ( I I I I I ( ( °o L DEPOT GROUNDS ( ( I' I I ( _ VACATION B-2 Ei 6: THIRD ST. � —� —„J—.�— SEE SHEET 4 -� ,_ — W W N !z —SECOND ST. '` (n _ � .0 0 �I - > I VACATION 8-a -� RIALTO AVE. � SEE SHEETS 2 & 3 _ RIALTO AVE �— = ``' I SANBAG M yt�,t1 [ANO sv� CONGRESS sr. - a Gp'fTp�` G�i � a-_ C __� —_ �f I I a * Exp.dateL12_31-1h * I �— ! — c I ( a) OF CAi 1��� ( I I I Q I i B. SCOTT EDKINS, L.S 7696 DATE ( I PLAN No. 1301 3 MILL STREET — Approved: 701 B Staet,buhe BDO PROJECT DESIGN CONSULTANTS wnowwteaQ2�01 �� 1f/(� J`f Planning I Landscape Architecture i Enginearing I Survey eis.�s 71 N W82aaAWft City Engineer Date: r:' SURVEY BNOkY 5UkVEY_I)YIG PLA 7 T ACATtONS 3RD STREET 311 V I—R 5 Packet Pg. 173 5.K.a SHEET 2 OF 4 THIRD STREET RIGKr-OF-WAY VACATION 1 t%rrY n;= QAKI RIMMARnlMn C'A ,u RANCHO CAN l3BF1NAADJN0 I I W AM 1' 7 2 CCr, CUM, BLOW< T6 Ewa.. r=w• vs-ce r-=.�+.s ,Jxv-sia{. .Jl4t 1...nwn 'v.., ..-,..� Ra o PI rtCa LOT ti ' vin r n a nLd7 4 TRACK-�a LOT 8 - v A S 161/99-103 � ik do zoo 0248JO0 ;"°' N800' 2, �I C5 -a 61:4(}-- w M 342.43 SI.o „ DEDICATED PER ado v 7`50 V!� MAP BK. 7, PG. 2 , ° Ld7 14 VACATION 0 1 C2 i g�pd , APN � MB 712 PCL. 3, BK. L2 'jj��g4'k�� D138-271 02 0 3 4805, PG 81 I gr �11i APN LOT 16 g < BL i)cK (113 APN 0138-261-07 5 �' 0138-271-0l I MB 7/2 `Q I N8937'54"E PCL. 2 OF DOC. �' '� L PARCEL 2 OF BLOCK 16 0 4 2053' Na 92-514402-N, °�° --,L9 B.K. 622, PG. 157 ED 1 LP.QB. APN 0138-261-01 a a I CO CO N89'054"E 16 1 114,19' GRANTED PER ( � `, N <ij \S8935'05"W 226.18' BK. 422, PG 238 t N ! APN 01.,8 271-21 I' IIRt7 STREET PARCEL r` OF - .� , . . . �- .. , .� . ..—. �I.qa. 1 BK. 622, PG. f 57 1 APN 0138-271-20 I B I L P.O.C. J RANcHa SAN BBFINARD1NO M SOUTHWEST CORNER APN 0138-271-19 - 0 PCL. .; BK.. AMR X 6 PG. 81, O.R. I MB ( 7/2 I U 7 I ( Z { t { APN 01-38-271-18 f J Q PAPI c�L 1 t 1 t t i m a. PNl 1847-1 P1vJB 2:28/60 o 25' 1BLaGK -15 E LINE TABLE _ _ LINE BEARING LENGTH CURVE TABLE R LINE BEARING LENGTH L6 S002455"E 11.22' CURVE DELTA RADIUS LENGTH Q L1 N34'35'24"E 91.42' L7 S294428"W 27.76' Cl 5502'30" 132.08' 126.88' L2 N89!24'13"E 4.76' L8 S0062455"E 10.81' C2 5148'43" 2.00' 1.81' L3 N3735'30"E 16.09' L9 S395942"E 8.79' C3 39'51'54" 208.00' 144.72' L4 N77#2724"E 58.68' L10 S44'4029"W 36.63' C4 02040'02" 1898.28' 88.37' L5 S5977'28"W 16.34' L11 N3717'07"W 14.51' C5 09'28'37" 336.00' 55.58' C6 12'1056" 190.00' 40.40' PROJECT DESIGN CONSULTANTS amok n m� p� A� UMM7r TM;� Planning I LandscapeArchftecture tEnpinearing ISurvey 61 PLAN IY o. 818.7a1.WIBF.x RVEY_!? ORY STIR . -OWO Pl. T S t VACA NS.3RtJ ST & K Sr VACADON - SNT 2& 4-R V7501.Oti'U Packet Pg. 174 i SHEET 3 0� 4 j THIRD STREET RIGh�'1"-C)1=-1fV�►Y �fACA�lo�i 1 r%mr nr- QAM Pr-RMARn1Nn r.A o i RANCHO CAN BEHNARDIN{D _ Mf3 7/2 BLOoK -10 RAILROAD 17?ACK 2 Ld i cv 7 4 .--�� X09'28'37 L5 R=336.00 f — -02'4002. _N8p•0 2, VACATED PER DOC. �18g8.28 61.40 NO. 2000-024830 . `' `=- #�r"'s�R) — Rr_68'7 i s r� N255 ---' 3¢2.48 a L4 ai 9DOC, N 02 S77'1�.. 0"vl DEDICATED PER v e i G3 � MAP BK. 7, PG. 2 PCL. 3, I T m SK. 480., d (y. I < PG at L9 03 Co V 1 APN 0138-271--02 w g La7 i5 o APN 0138-271-01 X � 1 w T- sw<R I � M Iti l I N IQ � 16 3L0MK z I P0 L- APN 0138-271-21 a I I LINE TABLE _ LINE BEARING LENGTH CURVE TABLE m LINE BEARING LENGTH L6 N89'37'06"E 32.28' CURVE DELTA RADIUS LENGTH a L1 N34'3524"E 91.42' L7 S5917'28"W 16.34' Cl 55'02'30" 13208' 126.88' L2 N89'24'13"E 4.76' L8 50024'55"E 11.22' C2 51'48143" 2.00' 1.81' L3 N37'35'30"E 16.09' L9 S2944'28"W 27.76' C3 3951'54" 208.00' 144.72' L4 N772724"E 58.68' LID S002455"E 10.81' C4 12'10'56" 190.00' 40.40' L5 N00:33'06"W 1.45' Lll S395942"E &79' 1 PROJECT DESIGN CONSULTANTS 7SmDbMCCA9201 PlenninglLendscapi /� p� r{ 070.296.6177 ul eArchfteoturelEngineeringlSurvey �L/yltl N o. 1 30 3 018.ZN.0310 Fix !�:;3533 StlRUFy NDtzr.St I;V'Y_D;V(' PI.A S STREET VACATlDNS 3RD S BEET 38 3_ D ST& K ST YI CA JON -- SFif 3--R WSED.U1K, Packet Pg. 175 SKEET 4 OF 4 THIRD sTREET RIGHT-®F-WAY VACA11ON _TTY ar- GAN RFRNARDINQ CA � ! I .~ 1 »ANcJ-la BAN BF�I;tNA.RD1Na I 'I 1 MB 712 1 1 I' BLOCX 16 La i i ! Co n A1I..RLO n n 7nAnv 1 ; fts RAD rRAG.1% 1 1 ... 1 O Q ! l N v N 1 ! U SANRAv P) I AP"I 0,'38-23?-11 I O I I ° N40'15'25"o-' (�1 � z z f —_ --_ \ I N89'37'06"E 280 34' Q a N A--78*4 B'38 ' L1 � THIRD STREET a _R=74.00' VACATION B-4 - _ L-101.79' L2 --DEDICATED PER S87'53'43V(R) r' MAP BK. 7, PG. 2 00 i S8937'06"W 244.66 1 T.P.O.B. ; APN 0138-2/.f-03 N NORTHWEST CORNER ( I BLOCK 1, MB 3179 N8937'06"E $ 7 APN— ( °— 1 I I 1 I 5.36 �� 0138—'73 04 1 3 1 2 I S i 1 41.25'4115` BLOCK 1:2 ( APN 0138-273-01 wc, j ' CD Co �C I I I I I I BLiCx 1 I _ _ z - - - I-— - -BROADWAY ST + z 1 9Uk1VlgiaN cAH'Tr:M'S 30' 8tJBU1V181oN I i 0. 11 � MB 3/79 1 ��18 ' B170 E I I ! LINE TABLE Q j 0 I 12 I LINE BEARING LENGTH i Li S704537"E 612' L2 S0021'53"£ 0.39' CURVE TABLE PLAN N o. 13 013 CURVE DELTA LENGTH ml saMta,roseoo C1 4928'16" 1 53.75' 1 46.41' PROJECT DESIGN CONSULTANTS rkribl %CAD2101 C2 56'3746" 48.00' 47.44' Planning I landscape Archftectum I Engineering I Survey esexa&wl Tel 812234MW F.% F l 8 , SiiRVEP_f} ORY 5uti'v�Y i c, 'GA'S �E:T V1_E IONS 3R0 SIRENN 38JJ_.3R1) ST& K ST VACA110N — SHT 2 & 4—RfW 61)VX Packet Pg. 176 Law Office of Andrew K. Rauch 12526 High Bluff Drive, Suite#300 San Diego, CA 92130 Telephone(858)792-3408 Facsimile(858)792-3409 IF October 4,2011 0 Y V i� Mitchell A.Alderman,PE Y Director of Transit and Rail Programs SANBAG 1170 W. 3rd Street,2"d Floor M San Bernardino,CA 92410-1715 0 RE: Bruce Hefftner and Allgood Shower Door Corporation ° a. 0 Y Dear Mr.Alderman: a Please be advised that this office represents Bruce Heffiner and Allgood Shower Door Corporation regarding the potential acquisition of its property and/or business related to any is public project, including the Redlands Passenger Rail Project. You are kindly requested to direct all communication regarding any potential acquisition of property rights to this office. Requests for inspections,testing,surveying or other similar activities should also be directed here. d You may contact me at the address and telephone numbers listed above. 1 may also be contacted = via email at andrewkrauch @gmail.com. Also,please advise the City of San Bernardino that Mr.Hefftner and Allgood Shower Door 0 Corporation oppose any potential vacation of West 3rd Street. Please copy me on your y correspondence to the City regarding this matter. Thank you. a Ve;drew y yo s, as E Y Y a K.Rauch Packet Pg:177