Loading...
HomeMy WebLinkAbout22- Public Works ORIGINAL CITY OF SAN BERNARDINO -REQUEST FOR COUNCIL ACTION From: Robert G. Eisenbeisz, City Engineer Subject: Authorize the City Engineer to execute Contract Change Order No. Dept: Public Works Two with Bomel Construction Co., Inc. for Metrolink Parking Structure Date: September 30,2010 at the Santa Fe Depot (GB 04-19), per Project Plan Nos. 12591, 12328, File Nos. 7.10-7576 12336, 12337, 12327, 12348. Meeting Date: November 1, 2010 Synopsis of Previous Council Action: 10-04-10 The Mayor and Common Council signed Contract Change Order No. 1 with Bomel Construction Co., Inc. for the Metrolink Parking Structure at the Santa Fe Depot(GB 04-19), per Project Plan Nos. 12591, 12328, 12336, 12337, 12327, 12348. 02-16-10 The Mayor and Common Council adopted Resolution No. 2010- awarding a contract to Bomel Construction Co., Inc. for the Metrolink Parking Structure at the Santa Fe Depot(GB 04-19), per Project Plan Nos. 12591, 12328, 12336, 12337, 12327, 12348. 06-23-09 The Mayor and Common Council adopted the FY 2009/10 to 2013/14 Capital Improvement Program. 07-16-07 Adopted Resolution No. 2007-247 authorizing the execution of Amendment No. 5 to the Cooperative Agreement with the San Bernardino Associated Governments (SANBAG) for Metrolink Commuter Rail Station and the Santa Fe Depot Rehabilitation Project, Contract No. 04-040. 09-19-05 Adopted Resolution No. 2005-317 authorizing the execution of Amendment No. 3 and ratifying Amendment No. 2 to the Cooperative Agreement with the San Bernardino Associated Governments(SANBAG) for the Metrolink Commuter Rail Station and the Santa Fe Depot Rehabilitation Project, Contract No. 04-040. Recommended Motion: Authorize the City Engineer to execute Contract Change Order No. Two with Bomel Construction Co., Inc. for the Metrolink Parking Structure at the Santa Fe Depot (GB 04-19), per Project Pi n Nos. 12591, 12328, 12336, 12337, 12327, 12348. Robert G. senbeisz Contact Person: Robert Eisenbeisz, City Engineer Phone: Ext. 5203 Supporting data attached: Staff Report&CCO No. Two Ward: 1 & 3 FUNDING REQUIREMENTS: Amount: $0 Source: (Acct.Nos.) 242-160-5504-7576-0025 Acct.Description: Santa Fe Depot Prkg. Structure CIP No. GB04-019 Finance: Council Notes: Agenda Item No. 1I- DI-261' 1 CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT Subject: Authorize the City Engineer to execute Contract Change Order No. Two with Bomel Construction Co., Inc. for Metrolink Parking Structure at the Santa Fe Depot (GB04-19), per Project Plan Nos. 12591, 12328, 12336, 12337, 12327, 12348. Background: In September of 2005, the San Bernardino Associated Governments (SANBAG) and the City of San Bernardino entered into a cooperative agreement as part of the Metrolink Commuter Rail Station and the Santa Fe Depot Rehabilitation Project, Contract No. 04-040. The agreement, which required SANBAG to reimburse the City for all engineering, inspection and construction costs associated with its construction, was approved by the Mayor and Common Council on July 16, 2007. Under the agreement, SANBAG agreed to reimburse the City for all costs associated with the project up to an amount of$3,500,000. In addition, the City received an approval on June 22, 2009 from the California Department of Transportation (Caltans) to proceed with the construction phase of the project under the Congestion Mitigation and Air Quality (CMAQ) improvement program with a reimbursement ratio of 88.53% of the construction costs. On February 16, 2010, the Mayor and Common Council approved a Resolution to award a contract to Bomel Construction Co., Inc. for the Metrolink Parking Structure at the Santa Fe Depot (GB04-19), per Project Plan Nos. 12591, 12328, 12336, 12337, 12327, and 12348. On October 4, 2010, the Mayor and Common Council authorized the City Engineer to execute Contract Change Order No. One with Bomel Construction Co., Inc. for the Metrolink Parking Structure at the Santa Fe Depot (GB 04-19), Per Project Plan Nos. 12591, 12328, 12336, 12337, 12327, 12348. Construction Change Order No. Two: During construction, the contractor was directed to provide a trailer for the City's construction management team to perform their daily monitoring tasks along with amenities such as electricity, telephone, internet service and restroom facilities. Staff was unable to secure alternative space in the SANBAG offices to accommodate this need. SANBAG agreed to provide the space for the trailer located in the overflow parking lot, west of the Mt. Vernon Bridge. This request for a trailer was not included in the contractor's original bid. The cost is based upon actual costs to date plus projected costs through the month of December of this calendar year. The descriptions and justification of these items are detailed in the attached copy of Contract Change Order No. Two. The second item included in this change order is the substitution of the proposed light emitting diode fixture system (commonly known as LED) for the originally specified fluorescent light fixture system. Both of these materials help reduce overall energy consumption. LED is used to provide savings in energy consumption and maintenance costs with greater durability and reliability over a longer service life. 2 10/13/2010 CITY OF SAN BERNARDINO —REQUEST FOR COUNCIL ACTION STAFF REPORT—Continued The development of LED technology has led to a greater efficiency and light output. In addition, our construction management team, along with Facilities Management have reviewed a life cycle cost analysis and determined the LED fixtures to be more cost effective than the specified fluorescent fixtures over their service life. Staff concurs with their recommendations to use LED fixtures throughout the structure as they will last longer and have less maintenance costs than the specified fluorescent fixture system. The last item included in this change order provides for the additional costs of changing methods for construction of a retaining wall footing. The wall in question makes up a portion of the exterior foundation along the Southerly and Westerly side of the parking structure, and its completion was critical in the timing for pouring the first deck of the structure. In order to save time from conventional pouring methods, a pumper was used to speed up production and reduce curing times. This resulted in a substantial saving in curing time which allowed a faster start to the first deck pour. Financial Impact: The revised estimated project costs are as follows: TOTAL Original Contract Amount $ 4,167,526.00 Contract Change Order No. One $ (27,850.00) Adjustment due to Reduced/Deleted Items ($40,653.70) Contract Change Order No. Two $103,230.64 Total Construction Contract Amount $ 4,202,252.94 The net change order amount of $34,726.94 represents an increase of 0.83% of the original contract amount. This increase does not significantly change the total project cost and is less than the contingency amount estimated in the design phase, so no additional funds are currently needed for this project. In addition, the City will be reimbursed 88.53% of the final construction cost from Caltrans and SANBAG including eligible change orders. Account: 242-160-5011-7576-0025 Budgeted Amount: $ 10,477,200 Balance as of 06/30/2010: $5,935,984 Balance after approval of this item: $ 5,901,257 Please note this balance does not indicate available funding. It does not include non-encumbered reoccurring expenses or expenses incurred but not yet processed. It also does not reflect the amount that has been obligated from the federal CMAQ program. 3 10/13/2010 CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT—Continued Recommendation: Authorize the City Engineer to execute Contract Change Order No. Two with Bomel Construction Co., Inc. for Metrolink Parking Structure at the Santa Fe Depot (GB04-19), per Project Plan Nos. 12591, 12328, 12336, 12337, 12327, 12348. Attachments: Change Order No. Two a 10/13/2010 PUBLIC WORKS DEPARTMENT 300 North"D"Street.- San Bernardino -CA 92418-0001 Engineering 909.384.5111• Fax:909.384.5155 Facilities 909.384.5244 -Fax: 909.384.5155 www.sbcity.org San Bernar lino CONTRACT CHANGE ORDER NO. TWO FILE NO. 7.10-7576 W.O. NO. 7576 DATE: NOVEMBER 1,2010 PROJECT: METROLINK PARKING STRUCTURE AT 1275 W. 3rd STREET AT THE SANTA FE DEPOT (GB 04-19), FEDERAL PROJECT NO. CML-5033(039), EA #08-9248831, PER PROJECT PLAN NOS. 12591, 12328, 12336, 12337, 12327, 12348 TO: BOMEL CONSTRUCTION CO., INC. 8195 E KAISER BOULEVARD ANAHEIM HILLS, CA 92808 GENTLEMEN: You are hereby compensated for performing the additional work as follows: ITEM NO: DESCRIPTION OF CHANGE COST 2-1 Trailer and Utilities Usage $ 5,504.00 2-2 Lighting Alternative $ 92,866.64 2-3 Retaining Wall Work $ 4,860.00 TOTAL COST CCO#2 $ 103,230.64 JUSTIFICATION: Trailer and Utilities Usage The contractor was directed to provide a trailer along with utilities such as electricity, Item 2-1 telephone and internet service provider, and restroom facilities for City's construction No. management team during the construction phase. The costs provided herein are based upon the actual expenses and projected costs through the end of December 2010. This request was not originally anticipated and was not included in the original bid. Lighting Alternative 2-2 The contractor was directed to replace the fluorescent light fixtures with a more efficient light emitting diode (known as LED) lighting system. These alternative lighting fixtures system will reduce the cost of energy usage over their service life. Retaining Wall Work During construction, it was discovered that there were conflicts in structural details 2-3 between 8" block wall and 12" block wall. The contractor was required to standby for the design changes to correct the condition. These changes were not originally anticipated and were not included in the original contract bid. • ENGINEERING DIVISION - SUMMARY OF CONTRACT COSTS The estimated revised contract cost is as follows: Original Bid Amount . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........................$ 4,167,526.00 Adjusted Contract Amount(Reduced/Deleted Items). . . . . . . . . . . . . . . . . . . . .....$4,126,872.30 Contract Change Order No.One . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..... ...$ (27,850.00) Contract Change Order No.Two . . . . . . . . . . . . . . . . . . . . . . . . . . . . .....................$ 103,230.64 Revised Construction Contract cost . . . . . . . . . . . . . . . . . . . . . . . . . . ....................$ 4,202,252.94 Reimbursement by Caltrans(Federal CMAQ Funds). . . . . . . . . . . . . . . . . . . . . . . $3,720,254.53 Additional time to complete Contract due to this Change Order..........................0 Working Days The net contract change represents an increase of 0.83 % of the original contract amount. BOMEL CONSTRUCTION CO.,INC. CITY OF SAN BERNARDINO CONTRACTOR PUBLIC WORKS DEPARTMENT Accepted Approved By: By: ROBERT G.EISENBEISZ Title: City Engineer Date: Date: Approved By: CHARLES E.McNEELY City Manager Date: November 1, 2010 Item No. ENGINEERING DIVISION