HomeMy WebLinkAbout22- Public Works 1 ORIGINAL CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION From: Nadeem Majaj, Director Subject: Resolution approving Amendment No. 2 to Agreement for Professional Dept: Public Works - Engineering Architectural and Engineering Services for the Metrolink Parking Date: February 10, 2011 Structure at Santa Fe Depot with Owen Design Group, Inc. for design and construction of the Santa Fe Depot Metrolink Parking Structure project (GB04-19). MCC Date: March 7, 2011 Synopsis of Previous Council Action: 05-01-06 Adopted Resolution No. 2006-114 approving an Agreement for Professional Architectural and Engineering Services with Owen Design Group, Inc. for design and construction of the Santa Fe Depot Parking Structure project (GB04- 19). 11/16/09 Adopted Resolution No. 2009-352 approving Amendment No. 1 to Agreement for Professional Architectural and Engineering Services with Owen Design Group, Inc. for design and construction of the Santa Fe Depot Parking Structure project (GB04-19) Recommended Motion: Adopt Resolution. Signature Contact Person: Robert Eisenbeisz, City Engineer Phone: 5203 Staff Report, Resolution& Supporting data attached: Exhibit"A"(Amendment) Ward: 1 FUNDING REQUIREMENTS: Amount: $44,098 Source: (Acct. No) 242-160-5504-7576-0025 Acct. Description: Santa Fe Depot Parking Structure (GB04-19) Finance: lye 50 �o / �� Agenda Item No. oa-o7-AOC� I CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION STAFF REPORT Subject: Resolution approving Amendment No. 2 to Agreement for Professional Architectural and Engineering Services for the Metrolink Parking Structure at Santa Fe Depot with Owen Design Group, Inc. for design and construction of the Santa Fe Depot Metrolink Parking Structure project(GB04-19). Background: The Santa Fe Depot Metrolink Parking Structure (GB 04-19) was first introduced into the Capital Improvement Program (CIP) during the 2005/2006 fiscal year. The project consists of construction of a three level parking structure to provide parking for approximately 350 cars primarily for use by Metrolink riders. Funding for the project consists of a combination of Federal Congestion Management & Air Quality (CMAQ) and SANBAG Local Transportation funds. On November 7, 2005, Resolution No. 2005-370 was adopted approving an Agreement for Professional Services with Transtech Engineers, Inc. to provide program management services for the Santa Fe Depot Metrolink Parking Structure Project. The City entered into a separate Agreement with an architectural firm to provide architectural and structural design services for the structure. On May 1, 2006, Resolution No. 2006-114 was adopted approving a separate Agreement for Professional Architectural and Engineering Services in the amount of $399,608.00 with Owen Design Group, Inc. for services related to the design and construction of the parking structure. The original term of the Agreement with Owen Group was 3 years. On November 16, 2009, Amendment No. 1 was approved, extending the term from May 1, 2009 to June 30, 2011. During construction, the Architect was required to provide additional services that were beyond the scope of services identified in the agreement. These services include: 1. Attendance at additional meetings and site visits beyond the scope of the original contract. 2. Change approved lighting design from standard fluorescent to Light Emitting Diode (LED). 3. Eliminate wheel stops at all tiers (except accessible stalls), add barrier cables around the perimeter of the structure at Tier 1, and add wiring for future cameras at Tier 1 though 3. 4. Provide support services during elevator installation to insure proper set up of elevator recall system that causes the elevator to return to the main level in case of a fire alarm. The modifications to the Architect's scope of services are explained in more detail in the attached Change Order Nos. 3 and 4 (Attachment "1") from the Consultant dated January 20, 2011. The total amount of the requested amendment is $44,098, which will cover the anticipated cost of services through the completion of construction. Staff feels this amount is fair and reasonable for the extra work involved. 2 CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION STAFF REPORT—Continued Financial Impact: Adequate funding to cover the cost of this amendment in the amount of$44,098 is available in the FY 10/11 CIP budget for Project No. GB04-19 (Account No. 242-160-5504-7576-0025) "Santa Fe Depot Parking Structure." The cost of this project is being reimbursed from a Federal Congestion Management Air Quality (CMAQ) grant at the rate of 88.53%. San Bernardino Associated Governments (SANBAG) is providing matching funds for the grant. Account: 242-160-5504-7576-0025 Budgeted Amount: $10,477,700 Balance as of 02/10/11: $6,138,049 Balance after the approval of this item: $6,093,951 Please note, this balance does not indicate available funding. It does not include non- encumbered reoccurring expenses or expenses incurred but not yet processed. Recommendation: Adopt Resolution. 3 1 RESOLUTION NO. 2 RESOLUTION OF THE CITY OF SAN BERNARDINO APPROVING 3 AMENDMENT NO. 2 TO AGREEMENT FOR PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES AT THE METROLINK PARKING STRUCTURE AT 4 SANTA FE DEPOT WITH OWEN DESIGN GROUP, INC. FOR DESIGN AND CONSTRUCTION OF THE SANTA FE DEPOT PARKING STRUCTURE PROJECT 5 (GB04-19). 6 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY 7 OF SAN BERNARDINO AS FOLLOWS: 8 SECTION 1. That the City Manager is authorized to execute Amendment No. 2 to 9 Agreement for Professional Architectural and Engineering Services at the Metrolink Parking 10 Structure at Santa Fe Depot with Owen Group, Inc. to provide Professional Architectural and 11 Engineering Services for the Santa Fe Depot Parking Structure (G1304-19) (attached and 12 incorporated herein as Exhibit"A"). 13 SECTION 2. This Amendment No. 2 shall not take effect or become operative until 14 15 fully signed and executed by the parties and no party shall be obligated hereunder until the time 16 of such full execution. No oral agreements, amendments, modifications or waivers are intended 17 or authorized and shall not be implied from any act or course of conduct of any party. 18 SECTION 3. The authorization to execute this agreement is rescinded if the parties fail 19 to execute it within sixty(60) days of passage of this resolution. 20 21 22 23 24 25 26 27 28 - 1 - 1 RESOLUTION OF THE CITY OF SAN BERNARDINO APPROVING AMENDMENT NO. 2 TO AGREEMENT FOR PROFESSIONAL ARCHITECTURAL 2 AND ENGINEERING SERVICES AT THE METROLINK PARKING STRUCTURE AT 3 SANTA FE DEPOT WITH OWEN DESIGN GROUP, INC. FOR DESIGN AND CONSTRUCTION OF THE SANTA FE DEPOT PARKING STRUCTURE PROJECT 4 (GB04-19). 5 I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and 6 Common Council of the City of San Bernardino at a meeting thereof, held 7 on the day of , 2011, by the following vote, to wit: 8 9 Council Members: AYES NAYS ABSTAIN ABSENT 10 MARQUEZ 11 VACANT 12 BRINKER 13 SHORETT 14 KELLEY 15 16 JOHNSON 17 MC CAMMACK 18 19 Rachel Clark, City Clerk 20 The foregoing resolution is hereby approved this day of , 2011. 21 22 Patrick J. Morris, Mayor 23 City of San Bernardino 24 Approved as to form: 25 JAMES F. PENMAN, City Attorney 26 27 By; e' ,,....� 28 - 2 - Exhibit"A" AMENDMENT NO. 2 TO AGREEMENT FOR SERVICES This Amendment No. 2 to Agreement for Professional Architectural and Engineering Services at the Metrolink Parking Structure at Santa Fe Depot by and between the City of San Bernardino (Agency) and OWEN GROUP, INC., doing business in California as OWEN DESIGN GROUP, INC., a Nevada corporation (Consultant), is made and entered into effective as of the day of 2011 by and between the Agency and the Consultant. WITNESSETH: A. WHEREAS, on May 1, 2006 the Mayor and Common Council of the Agency adopted Resolution No. 2006-114 approving an Agreement for Services with Owen Design Group, Inc. for design and construction of the Santa Fe Depot Parking Structure project (GB04- 19); and, B. WHEREAS, on November 16, 2009 the Mayor and Common Council of the Agency adopted Resolution No. 2009-352 approving Amendment No. 1 to an Agreement for Services with Owen Design Group, Inc. for design and construction of the Santa Fe Depot Parking Structure project(GB04-19); and, C. WHEREAS, the Agency has a continuing need for the Consultant to provide Professional Architectural and Engineering Services for the Santa Fe Depot Parking Structure (GB04-19) during construction of said structure; and, D. WHEREAS, Consultant has requested additional compensation for work not included in its original scope of work of the original Agreement or Amendment thereto; and C. WHEREAS, City concurs that the additional services for which compensation is requested were not in the original scope of services of the original Agreement or Amendment No. 1. NOW THEREFORE, the parties hereto agree as follows: 1. Section 3 "Scope of Services" of the Original Agreement as approved by Resolution No. 2006-114 is hereby amended to include items described in detail in the attached Change Order Nos. 3 and 4 from Consultant dated January 20, 2011 and attached hereto as Attachment"I": 2. Section 5(a) of the Original Agreement as approved by Resolution No. 2006-114 is hereby amended as follows: Over the term of this Agreement, Consultant shall be compensated for said Agreement as follows: Exhibit "A" Amendment No.2 to Agreement for Services—Owen Design Group,Inc. Page 2 of 3 a) Agreement for Services approved per Reso.No. 2006-114. . . $399,608.00 b) Amendment No. 1 approved per Reso. 2009-352 0.00 c) Amendment No. 2 (this Amendment) $44,098.00 Total not-to-exceed amount . . . . . . . . . . . . $443,706.00 3. All other terms and conditions of said Agreement for Services and Amendment No 1 approved by Resolution No. 2006-114 and Resolution No. 2009-352 shall remain unchanged. i i I i i i 2 Exhibit"A" Amendment No.2 to Agreement for Services—Owen Design Group,Inc. Page 3 of 3 AMENDMENT NO. 2 TO AGREEMENT FOR SERVICES IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date shown below. OWEN GROUP, INC., doing business in California as OWEN DESIGN GROUP, INC., a Nevada corporation. Date: by: Signature Print Name/Title CITY OF SAN BERNARDINO Date: by: Charles E. McNeely, City Manager City of San Bernardino ATTEST: Rachel Clark, City Clerk Approved as to form: James F. Penman City Attorney B -0 y• 3 ATTACHMENT "1" CHANGE ORDER AUTHORIZATION 806.2109.1, 0806.2109.2 AND DATE .JANUARY 20,2011 OWEN DESIGN# 0806.2109.3 SAN BERNARDINO CHANGE PROJECT PARKING STRUCTURE ORDER# :. ' #003 OWEN DESIGN AND ORIGINATOR ANGELA GOLDINE FIRM MANAGEMENT, INC. CITY REPRESENTATIVE ROBERT EISENBEISZ FIRM CITY OF SAN BERNARDINO In accordance with your request,this letter constitutes an agreement to perform the following additional services on the subject project: 0806.2109.01 —Additional time/meetings beyond allocated contract amount. 1. Additional meeting/site meeting beyond contract scope. a. Date 10-28-2010(71irs) 2. Estimated meetings/site visits through end of April 2011: a. Date 01-06-2011 Architect(estimated 6 hrs.) b. Date 01-27-2011 Architect(estimated 6 hrs.) c. Date 02-10-2011 Architect(estimated 6 hrs.) d. Date 02-24-2011 Architect(estimated 6 hrs.) e. Date 03-10-2011 Architect(estimated 6 hrs.) f. Date 03-24-2011 Architect(estimated 6 his.) g. Date 04-07-2011 Architect(estimated 6 his.) h. Date 04-21-2011 Architect(estimated 8 hrs.) i. Date 04-21-2011 Engineer(estimated 8 hrs.) 3. It is anticipated that additional support/time for completion of Close-Out processes will be required from January 02,2011 through June 31, 2011 (contract completion date). As such, these additional Office Administration hours will be supported by the following: Associate/Project Manager(Angela Goldine) estimated 104 hours. Project Engineer (Moosa Kazemzadehpaisi)estimated 50 hours. Our fee for this scope is as follows: 1. $ 7,054.00 Meetings/Site Visit-Architectural(57 hrs) 2. $ 857.00 Meetings/Site Visit-Electrical(8 hrs.) 3. $ 10,872.00 Office CA-Architectural(104 hrs) 4. $ 5,355.00 Office CA -Electrical (50 hrs) ------------------------------------------------------ Total: $ 24,138.00 0806.2109.02—LED Fixture and Conduit change—Per Owner's request 1. Changed approved design from standard fluorescent lighting design to LED lighting per Owner's request. 2. Revised drawings both architectural and electrical to accommodate LED lighting. 3. Worked directly with electrical supplier to provide the most efficient design. 4. Review shop drawings and incorporate all site questions/revisions into final record drawings. Z:\WBA_11\9048-Owen SFPS\8061806.2109.1 Santa Fe Parking Struclure\Project Management\Change Orders\Change Order 003\Change Order Auth 003•Rev.doc ATTACHMENT "1" 5. Review final installation/site and perform report/punch list. Our fee for this scope of work is for hours already spent and hours estimated to complete this portion of work(see attached breakdown for hours already charged): 1. $ 5,200.00 Architectural 2. $ 7,160.00 Electrical ------------------------------------------------------ Total: $ 12,360.00 0806.2109.03—VF Items proposed and accepted by the City of San Bernardino which include eliminate wheel stops on all tiers(except accessible stalls),add barrier cables around the perimeter of the structure at Tier 1, add cameras locations Tiers 1 thru 3.. 1. Incorporate VE items within record drawings 2. Review barrier cable shop drawings for exterior perimeter conditions. 3. Review final installation and perform a punch list. Our fee for this scope of work is for hours already spent and hours estimated to complete this portion of work(see attached breakdown for hours already charged): Total: $ 2,000.00 Architectural Our overall total fee for 0806.2109.01,0806.2109.02 and 0806.2103 is as follows: 1. 0806.2109.01 -$24,138.00 2. 0806.2109.02 -$ 12,360.00 3. 0806.2109.03 -$ 2,000.00 ------------------------------------------------------ Overall Total : $ 38,498.00 Invoices are payable upon receipt. We understand that you concur with the aforementioned proposal and are, therefore proceeding with the subject project tasks. Please return(1) one copy of this letter with the proper authorized party's signature and/or initials where indicated. This will constitute our written authorization to perform these services. All other provisions of this agreement will remain the same. 0 WEN DESIGN an d MANAGEMENT,Inc. Accepted by: Al Sign re Date Signature Date Angela G dine, Associate/Project Robert Eisenbeisz, City Engineer Name/Title Name/Title Please notify the writer if you take exception or if there are any errors or omissions. If no notice is received within 3 days, we will assume that you are in agreement. CC: BEEKYU OWN(ACCOUNTING) SENT BY: ANGELA GOLDINE MICHAEL CHEGINI OWEN DESIGN GROUP, INC. EDDY JAN(CITY OF SAN BERNARDINO) MICHAEL ACKERMAN Z:1WBA_1119048-Owen SFPW061806.2109.1 Santa Fe Parking StructureTroject Management\Change Orders\Change Order 0031Change Order Auth 003-Rev.doc ' ATTACHMENT 661" CHANGE ORDER AUTHORIZATION - ` JANUARY 20,2011 806.2109.1 SAN BERNARDINO PARKING STRUCTURE #004 OWEN DESIGN AND ANGELA GOLDINE MANAGEMENT, INC. ROBERT EISENBEISZ CITY OF SAN BERNARDINO In accordance with your request,this letter constitutes an agreement to perform the following additional services on the subject project: 0806.2109.01—Provide Elevator Recall System (Fire Alarm). 1. Per Elevator Specifications: Section 14240 Hydraulic Elevators,2.02 Systems and Equipment, L2,an elevator recall detecting system shall be installed at each elevator to cause elevator to return to main floor if activated. A request was made by the design team to assist during construction in providing this information in lieu of the Elevator Sub-contractor. a. Direct contractor on how to install system. b. Generate drawings and submit sketches to contractor. c. Reviewed first set of shop drawing package; returned revise and resubmit. d. Review shop drawings once resubmitted by contractor. e. Review final installation. I Our fee for this scope of work is for hours already spent and hours estimated to complete this portion of work(see attached breakdown for hours already charged): 1. $ 1,000.00 Architectural 2. $ 4,600.00 Electrical ------------------------------------------------------ Total: $ 5,600.00 Invoices are payable upon receipt. s J:\Projects\806\806.2109.1 Santa Fe Parking Structure\Project Management\Change Orders\Change Order 0041Change Order Auth 004,doc ATTACHMENT 661" We understand that you concur with the aforementioned proposal and are, therefore proceeding with the subject project tasks. Please return (1) one copy of this letter with the proper authorized party's signature and/or initials where indicated. This will constitute our written authorization to perform these services. All other provisions of this agreement will remain the same. OWEN DESIGN and MANAGEMENT,Inc. Accepted by: to Date Signature Date Angela Goldine,Associate/Project Robert Eisenbeisz, City Engineer Name/Title Name/Title Please notify the writer if you take exception or if there are any errors or omissions. if no notice is received within(3)days,we will assume that you are in agreement. I R 1� J:\Projects\806\806.2109.1 Santa Fe Parking Structure\Project Management\Change Orders\Change Order 004\Change Order Auth 004.00