CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
` From: Nadeem Majaj,Director Subject: Authorize the Director of Public
Works to execute Contract Change
Dept: Public Works-Engineering Order No. One with All American
Asphalt for Street Improvements on
Date: February 10,2011 Cajon Boulevard Related to Federal
EDA Award No. 07-01-06147, per
File Nos. 1-7802 Project Plan No. 12155.
MCC Date: March 7, 2011
Synopsis of Previous Council Action:
02-16-10 The Mayor and Common Council adopted Resolution No. 2010-63 awarding a
contract to All American Asphalt for Street Improvements on Cajon Boulevard
related to Federal EDA Award No. 07-01-06147, per Project Plan Nos. 12155.
12-21-09 The Mayor and Common Council adopted Resolution No. 2009-375 approving a
contract with RBF Consulting for Construction Management Services for Street
Improvements on Cajon Boulevard related to the North San Bernardino Industrial
Park/FedEx Project.
10-06-08 The Mayor and Common Council adopted Resolution No. 2008-379 approving a
reimbursement agreement with Hillwood related to the North San Bernardino
Industrial Park/FedEx Project.
05-05-08 The Mayor and Common Council authorized the Finance Director to create a new
capital improvement project for the North San Bernardino Industrial Park/FedEx
Project.
04-07-08 The Mayor and Common Council adopted Resolution No. 2008-115 accepting a
grant from the Federal EDA.
Recommended Motion:
Authorize the Director of Public Works to execute Contract Change Order No. One with All
American Asphalt for Street Improvements on Cajon Boulevard related to EDA Award No 07-
01-06147, per Project Plan Nos. 12155.
Signature
Contact Person: Robert Eisenbeisz, City Engineer Phone: Ext. 5203
Supporting data attached: Staff Report& CCO No. One Ward: 6
FUNDING REQUIREMENTS: Amount: $ 18,613
Source: (Acct.Nos.) 242-160-5504-7802-0025
Acct. Description: Hillwood Reimbursement
Finance:
Council Notes:
Agenda Item No.
03-07-�0�/
CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
STAFF REPORT
Subject:
Authorize the Director of Public Works to execute Contract Change Order No. One with All
American Asphalt for Street Improvements on Cajon Boulevard Related to Federal EDA Award
No. 07-01-06147, per Project Plan No. 12155.
Background:
On April 7, 2008, the Mayor and Common Council adopted Resolution No. 2008-115, accepting a
$1,500,000 Federal Economic Development Administration Grant for infrastructure improvements
on Cajon Boulevard related to Hillwood FedEx project. As a condition of approval, Hillwood was
required to construct approximately 5,452 linear feet of curb, gutter, sidewalk, street lights, and
pavement rehabilitation to the street center line. The estimated cost of improvements was
$3,750,000. After subtracting the grant amount, the remaining balance of $2,250,000 was the
City's share. Hillwood has agreed to pay the City's share.
On October 6, 2008, the Mayor and Common Council adopted Resolution No. 2008-379, which
approved a Reimbursement Agreement with Hillwood for the City's share of the cost for the
improvements. On April 5, 2010, the Mayor and Common Council adopted Resolution No. 2010-
63 to award a contract to All American Asphalt in the amount of$740,827.60 for construction of
street improvements on Cajon Boulevard related to EDA Award No. 07-01-06147, per Project
Plan No. 12155.
Construction Change Order No. One:
During construction, a revised Southern California Edison site plan was introduced in the field,
requiring the contractor to install an additional conduit and a transformer pad for the project. In
addition, the contractor was directed to perform additional removal of asphalt concrete along
Cajon Boulevard to meet the structural pavement requirements, when it was discovered in the field
that the existing pavement was inadequate and failing. This additional work was not included in
the contractor's original bid. The last two items included in this change order were the additional
striping work on the northeasterly side of the street, which is in the County, to accommodate
adequate lane widths. The descriptions and justification of these items are detailed in the attached
copy of Contract Change Order No. One. This change order results in an increase to the project by
an amount of$18,612.66.
I Financial Impact:
i The revised estimated contract costs are as follows:
TOTAL
Original Contract Amount $ 740,827.60
Contract Change Order No. One $ 18,612.66
Total Construction Contract Amount $ 759,440.26
z
02/17/2011
CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
STAFF REPORT—Continued
This change order represents an increase of 2.51% of the original contract amount. The change
order did not increase the total project cost, which was less than estimated in the original design
phase for budget purposes. Therefore, no additional funds are needed for this project. In
addition, the City will be reimbursed 40% of the final construction cost from Federal EDA,
1 including this change order amount and Hillwood will reimburse the remaining cost. Funds for
this change order are appropriated in the Public Works Department budget, FY 10-11 (Account
No. 242-160-5504-7802-0025) SS08-035 "Cajon Blvd. Street Widening from South of Glen
Helen" as follows:
Account No.: 242-160-5504-7802-0025 Budgeted Amount: $3,744,300
Balance as of 02/14/11: $2,859,061 Balance after the approval of this item: $2,840,448
Please note this balance does not indicate available funding. It does not include non-encumbered
recurring expenses or expenses incurred but not yet processed. It reflects the amount allocated but
not necessarily obligated and authorized by the US Department of Commerce (Federal EDA),
which will only reimburse the City for actual costs incurred.
Recommendation:
Authorize the Director of Public Works to execute Contract Change Order No. One with All
American Asphalt for Street Improvements on Cajon Boulevard related to Federal EDA Award
No. 07-01-06147,per Project Plan No. 12155.
Attachments:
Change Order No. One
I
3
02/28/2011
PUBLIC WORKS DEPARTMENT
300 North"D" Street• San Bernardino• CA 92418-0001
Engineering 909.384.5111• Fax: 909.3 84.5155
Facilities 909.384.5244 •Fax: 909.384.5155
www.sbcity.org
San Bernalio
Sv
CONTRACT CHANGE ORDER NO. ONE
FILE NO. 1-7802 W.O. NO. 7802 DATE: MARCH 7,2011
PROJECT: STREET IMPROVEMENTS ON CAJON BOULEVARD RELATED TO
FEDERAL EDA AWARD NO. 07-01-06147 (SS 08-35), PER PROJECT PLAN NO.
12155
TO: ALL AMERICAN ASPHALT
P.O. BOX 2229
CORONA, CA 92878-22298
GENTLEMEN:
You are hereby compensated for performing the additional work as follows:
ITEM NO: DESCRIPTION OF CHANGE COST
1-1 Southern California Edison(SCE) Site Plan $ 3,507.06
1-2 Remove Existing Asphalt Concrete Pavement $ 11,439.00
1-3 Install 4"PVC Conduit $ 1,840.00
1-4 4" Wide Thermoplastic White Lane Line $ 1,080.40
1-5 4"Wide Thermoplastic White Edge Line $ 746.20
TOTAL COST CCO#1 $ 18,612.66
JUSTIFICATION:
Southern California Edison (SCE) Site Plan
Item During construction, it was discovered that the contractor was required to perform
No. 1-1 additional conduit installation and a transformer pad for the project; therefore, it was
necessary for the contractor to complete the said addition on a time and material basis
er SCE requirements.
Remove Existine Asphalt Concrete Pavement
1-2 The contractor was directed to perform additional asphalt concrete removal work when
it was discovered in the field that the existing pavement did not meet structural
requirements. This additional work was not included in the original contract bid.
ENGINEERING DIVISION
Install 4"PVC Conduit
1-3 The contractor was required to install an additional 4" PVC conduit to accommodate
SCE requirements.
a 4"Wide Thermoplastic White Lane Line
1-4 During construction, it was discovered that the contractor was required to perform
additional striping on the County side to accommodate adequate lane widths.
4"Wide Thermoplastic White Edge Line
1-5 During construction, it was discovered that the contractor was required to perform
i
additional striping on the County side for adequate lane widths.
s
SUMMARY OF CONTRACT COSTS
The estimated revised contract cost is as follows:
Original Bid Amount . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........................$ 740,827.60
Contract Change Order No. One . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....................$ 18,612.66
Revised Construction Contract cost . . . . . . . . . . . . . . . . . . . . . . . . . . ....................$759,440.26
Reimbursement by EDA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..........................$303,776.10
Additional time to complete Contract due to this Change Order.......................... 0 Working Days
This change order represents 2.51 %of the original contract amount.
ALL AMERICAN ASPHALT CITY OF SAN BERNARDINO
CONTRACTOR PUBLIC WORKS DEPARTMENT
Accepted Approved
By: By:
NADEEM MAJAJ
Title: Director of Public Works
Date: Date: