Loading...
HomeMy WebLinkAbout05.U- Public Works RESOLUTION (ID #2790) DOC ID: 2790 C CITY OF SAN BERNARDINO—REQUEST FOR COUNCIL ACTION Request for Proposal From: Tony Frossard M/CC Meeting Date: 12/16/2013 Prepared by: Linda Dortch, (909) 384-5140 Dept: Public Works Ward(s): 1 Subject: Resolution of the Mayor and Common Council of the City of San Bernardino Authorizing the Director of Public Works to Issue a Notice of Inviting Bids for Carpet and Carpet Installation. RFP F-14-23 (#2790) Current Business Registration Certificate: Not Applicable Financial Impact: Account Budgeted Amount: $79,501.92 Account No. 001-110-0000-4924 Account Description: Damage Claim Recovery Balance as o£ December 9, 2013 $80,000 Balance after approval of this item: $498.08 Please note this balance does not indicate available funding. It does not include non-encumbered reoccurring expenses or expenses incurred, but not yet processed. Motion: Adopt the Resolution. Synopsis of Previous Council Action: December 16, 2013 - Report to the Mayor and Common Council of the City of San Bernardino Regarding the Payment to Disaster Kleenup/Better Floors &Restoration for Emergency Clean Up Services at the Feldheym Library, 555 W 6th Street. Background: The Public Works Department, Operations&Maintenance Division, is responsible for the maintenance of City buildings. On May 17, 2013, the first and second floors of the Feldheym Library sustained water damage due to contractor negligence. Staff is requesting to replace carpet in those areas of the library that have been damaged by water. The contractor responsible for the broken pipe has submitted payment in the amount of$112,844.40. Of this amount, $33,342.48 has been expended for the initial clean up. Staff is requesting that remaining funds $79,501.92 be used for carpet and carpet installation. In order to ensure the best possible price, staff prepared a list of vendors who provide carpet and carpet installation services. The Request for Proposals (UP) will also be advertised in the San Bernardino County Sun Newspaper, sent to the San Bernardino Area Chamber of Commerce and posted on the City of San Bernardino website. A list of known vendors is included with this report. City Attorney Review: Supporting Documents: Updated: 12/11/2013 by Jolena E.Grider C 5U 2790 reso 2790 (PDF) Bid Packet (DOC) Updated: 12/11/2013 by Jolena E.Grider C Packet Pg. 390 5.U.a 1 RESOLUTION NO. 2 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AUTHORIZING THE DIRECTOR OF PUBLIC WORKS TO 3 ISSUE A NOTICE OF INVITING BIDS FOR CARPET AND CARPET 4 INSTALLATION. RFP F-14-23 5 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE 6 CITY OF SAN BERNARDINO AS FOLLOWS: 7 SECTION 1. The Director of Public Works is authorized to issue a "Notice of 8 Inviting Bids for Carpet and Carpet Installation" RFP F-14-23, attached and incorporated -2 j 9 herein as Exhibit"A." E 10 11 12 0 13 14 15 CU U 16 17 / N O 18 °' O 19 20 21 22 Ill a 23 24 25 26 27 IlI 28 111 Packet Pg. 391 1 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AUTHORIZING THE DIRECTOR OF PUBLIC WORKS TO 2 ISSUE A NOTICE OF INVITING BIDS FOR CARPET AND CARPET INSTALLATION. RFP F-14-23 3 I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor 4 and Common Council of the City of San Bernardino at a meeting 5 thereof, held on the day of , 2013,by the following vote,to wit: 6 7 Council Members: AYES NAYS ABSTAIN ABSENT L 8 MARQUEZ 1° J 9 JENKINS E d t 10 VALDIVIA 11 SHORETT = 12 .0 13 VACANT c 14 JOHNSON 0a 15 MULVIHILL U 16 0 17 Georgeann Hanna, City Clerk 18 N 19 The foregoing resolution is hereby approved this day of , 2013. L 20 E 21 Patrick J. Morris,Mayor 22 City of San Bernardino Q 23 Approved as to form: GARY D. SAENZ, 24 City Attorney 25 BY. �`cr 26 27 28 5.U.b RFP F-14-23 Page 1 of 6 City of San Bernardino TECHNICAL SPECIFICATIONS RFP F-14-23 CARPET AND CARPET INSTALLATION NOTICE: "SPECIAL INSTRUCTIONS TO THE BIDDER" The Public Works Department, Operation & Maintenance Division, is responsible for maintaining the Feldheym Library located at 555 West 6th Street. The intent of this document is to solicit proposals from qualified CONTRACTOR'S with J experience in providing carpet and carpet installation on the second floor of the library. The City is looking for the most responsive and responsible CONTRACTOR that will be committed to provide the City of San Bernardino with U_ carpet and carpet installation. Through a competitive qualification and bid based procurement process, the City of San Bernardino intends to enter into an o agreement with a qualified CONTRACTOR for video inspection of the sewer system. c Services: Bidder shall complete right-hand column indicating brief reasoning for exemptions to requirements when not applicable. State CD. I "Acceptable" if requirements are agreeable as set forth in left-hand column. 0 a) FAILURE TO COMPLETE RIGHT HAND COLUMN WILL INVALIDATE BID v CATEGORY I ACCEPTABLE / � AS SPECIFIED m I. SCOPE OF WORK E Furnish all labor, materials, equipment, tools and incidentals necessary to provide carpet and carpet installation at the a Feldheym Library. • The carpet will be of a commercial grade and type with the carpet specification provided at the job walk and the color will be chosen by the Public Works Director or his designee from samples provided by the selected contractor. • Top set base will be removed and replaced at existing locations with the color to be chosen by the Public Works Director or his designee. Packet Pg. 393 5.U.b RFP F-14-23 Page 2 of 6 • The CONTRACTOR will be responsible for field measurements to verify the square footage of carpet to be replaced. • All furniture, book racks, cabinets, and objects on the floor will be removed and relocated by the CONTRACTOR. • The CONTRACTOR is responsible for debris removal from the site and will place debris in a container for haul away. • Work must take place between the hours of 7:00 a.m. and 4:00 p.m. Monday thru Friday. The Library is closed on Fridays and work that will impact the public will be scheduled on Fridays. J E 2. REFERENCE LIST Provide three (3) local government agencies and/or company's r previous or current contact references that support your ability to provide cleaning and video inspection of sewer main lines. 3. CONTRACT LENGTH The length of this contract shall be approximately on or about CL February 1, 2014 to June 30, 2014. U 4. LICENSES a ti The CONTRACTOR represents that it has all licenses, permits, qualifications and approvals of whatever nature that are legally required to provide carpet and carpet installation, including a City a Business License, and that such licenses and approvals shall be m maintained throughout the term of this Contract. r d E 5. CONTRACTOR NON-COMPLIANCE A. If the Public Works Department Director, or his designee, a determines that there are deficiencies in the performance of this Agreement, the Public Works Director, or his designee, will provide a written notice to the CONTRACTOR stating the deficiencies and specifying a time frame to correct the specified deficiencies. This time frame shall be reasonable, as determined by the Public Works Director, or his designee, to correct the specified deficiencies. B. Should the CONTRACTOR fail to correct any deficiencies within the stated time frame, the Public Works Director, or his designee, may exercise the following measures: Packet Pg. 394 RFP F-14-23 Page 3 of 6 1. Deduct from the CONTRACTOR'S payment the amount necessary to correct the deficiency, including City overhead costs and impose a deficiency deduction. 2. Withhold the entire or partial payment. 3. Terminate the contract and award to second bidder. L J O t d LL t0 C O r c0 w N C d Q L U 0 a> ti N w d Y V CU a m w c o� E a w a 5.U.b RFP F-14-23 Page 4 of 6 PRICE FORM REQUEST FOR QUOTES: RFQ F-14-23 DESCRIPTION OF RFQ: CARPET AND CARPET INSTALLATION COMPANY NAME: ADDRESS: L M L J PRINT E NAME OF AUTHORIZED REPRESENTATIVE U- r Provide pricing that is a Firm Fixed Fee per square foot. •° M FEE Cd $ square foot a L (Q U 0 rn ti N ANNUAL PURCHASE ORDER Effective on or about February 1, 2014 through June 30, 2014. a 'm Are there any other additional or incidental costs which will be required by your firm in order to meet the requirements of the Technical Specifications? Yes / No (circle one). If you answered "Yes", please provide detail of said additional costs: w w a Please indicate any elements of the Technical Specifications that cannot be met by your firm. Packet Pg. 396 S.U.b RFP F-14-23 Page 5 of 6 Have you included in your bid all informational items and forms are requested? Yes / No (circle one). If you answered "No", please explain: This offer shall remain firm for 90 days from RFQ close date. Terms and conditions as set forth in this RFQ apply to this bid. Cash discount allowable % days; unless otherwise stated, payment terms , are: Net thirty (30) days. In signing this bid, Bidder warrants that all certifications and documents E requested herein are attached and properly completed and signed. From time to time, the City may issue one or more addenda to this RFQ. Below, U_ please indicate all Addenda to this RFQ received by your firm, and the date said Addenda was/were received. g Verification of Addenda Received N od Addenda No: Received on: �- Addenda No: Received on: Addenda No: Received on: 0 0 ti AUTHORIZED SIGNATURE: PRINT SIGNER'S NAME AND TITLE: M a m DATE SIGNED: COMPANY NAME & ADDRESS: E PHONE: FAX: a EMAIL: IF SUBMITTED A "NO BID", PLEASE STATE REASON(S) BELOW: Packet Pg. 397 (tiejgl-1 WA8gPl8 j le uollellelsul lg ladjeo:06LZ) laPed P!8:luOwg3e4ib 00 of M CL d l; Y O U V R a 0 0 V cC O O .a Q b0 O VO w � Y � O O m � •cC y V o E E ca ce O C C L U O y � ' Y V y b o > F F a`i Q U :F,% a. d C h Z U o •� c � v � O co r.5 N o, a, 00 o t- � 'cnr- mn l� M O O V V �( a0 M N 7 M ¢ 00 00 �O 00 00 00 � w 00 M 00 M 00 M C,. 0, O\ O, 0T T ak Q 17, O, O, a, Q1 ¢ m l-- m 00 M O M 00 O �o 00 7 U 00 ,O Z 00 It N O, O m O 00 00 ,0 00 00 00 s o0 00 00 Of n m a o, aa, c a ° ° o ° 17, a, a, a, N _m W a m Q Fn uuuuuu v_a � W F d 'O b 'D b 'D 7t7 E E E E l~ � � F 0 U O 0. cC A G ¢ y cn W . :� xo3Qnw � a` N N n N 0�0 GA C. W i 0 > ¢ z u � ; $ � > p � o •,��, °� X23 �3 > O z o y o > ou U u u F r .� z S > Q W x3wo F O 14!H Ca