Loading...
HomeMy WebLinkAbout08.J- Public Works RESOLUTION (ID#2497) DOC ID: 2497 CITY OF SAN BERNARDINO—REQUEST FOR COUNCIL ACTION Agreement/Contract Amendment From: Robert Eisenbeisz M/CC Meeting Date: 06/17/2013 Prepared by: Michael Grubbs, (909) 384- 5140 Dept: Public Works Ward(s): 7 Subject: Resolution of the Mayor and Common Council of the City of San Bernardino Approving Amendment No. 1 to a Consultant Services Agreement with Willdan for Design of a Traffic Signal at Route 210 Westbound Waterman Avenue Off-Ramp at 30Th Street(TC08-09). (#2497) Current Business Registration Certificate: Yes Financial Impact: Account Budgeted Amount: $340,800 Account No. 264-160-5504-7836-0025 Account Description: Westbound SR-210 Waterman Avenue Exit Ramp & 30th Street-New Traffic Signal (LSP) Balance as of: 05/21/13 $104,515 Balance after approval of this item: $99,515.00 1% Please note this balance does not indicate available funding. It does not include non-encumbered reoccurring expenses or expenses incurred,but not yet processed. Motion: Adopt the Resolution. Synopsis of Previous Council Action: 04/19/10 Resolution No. 2010-076 was adopted approving a Consultant Services Agreement with Willdan for design of a Traffic Signal at Route 210 westbound Waterman Avenue off-ramp at 30th Street (TC08-09). 05/20/13 Resolution No. 2013-093 adopted awarding a contract to Siemens Industry, Inc. for Traffic Signal installation at 30th Street and the 210 Freeway(Westbound Exit Ramp for Waterman Avenue),per Plan No. 12894 (TC08-009). Background: On April 19, 2010, the Mayor and Common Council adopted a resolution approving a Consultant Services Agreement with Willdan for design of a traffic signal at Route 210 westbound Waterman Avenue off-ramp at 30th Street (TC08-09). The design was completed and the traffic signal was advertised for bids. A contract for the work was awarded to the lowest bidder, Siemens Industry, Inc., in the amount of$159,995.00 on May 20, 2013. Construction is expected to begin in June 2013 and be completed by the end of December 2013. Staff is recommending that Willdan be retained for design support through the end of Updated: 6/13/2013 by Georgeann"Gigi"Hanna P�Cket Pg. 8.J 2497 construction. Willdan has submitted the attached proposal, dated May 22, 2013, offering to provide on-call design support during construction and concurring with an extension of time through December 31, 2013. This support will consist of assistance with change orders, interpretation of plans, recommendations regarding equipment/materials and advice regarding testing/operation. Correction of errors or omissions to the plans and specifications will not be an allowed cost. The cost of these services is estimated to be less than $5,000.00. Please note that the entire amount of the cost for this project, including these services, will be reimbursed by SANBAG under the Local Stimulus Program (LSP). City Attorney Review: Supporting Documents: Resolution (PDF) Exhibit "A" - Willdan Agreement Design of Traffic Signal at Rt 210 WB Off-Ramp at 30Th St (PDF) Attachment "A" Willdan Proposal 05-22-13 (PDF) Attachment "B" Willdan Fee Schedule 05-22-13 (PDF) Location Map (DOC) i 1 1 1 i i d a r i Updated: 6/13/2013 by Georgeann"Gigi"Hanna 3 8.J.a ® . E Marsh $had E Marshall Bhad s z c� 0 { Z r 7 • �.. (}� m > CL Hrarrtae Perk < Real Dream CD E Estate?3 'II CD CD LAT?' It is r'S3lana ++ Rey'eSUS eta pp R E 30th St E 30th St M 30th St tvtrrc 1 O!O#t#d�F F`Wy O s �, T MarbnA.Mauch HW � ? N F� F - m Pate tea. E 2"t St LY E 2ft St � p O E �th St 3 .'G z m Z E Country Club Ln 9 r G} i � >. 3 E 28th St E 28th St E 28th St < C < d > U E Nexander Ave E Azexander Ave Q s€>ells�ntt anise rt5 O ASwne�zt..S C O E Q ti d' N LOCATION MAP Q Traffic Signal Installation at 30th Street and the 210 Freeway (Westbound Exit c Ramp Waterman Avenue) (TC08-009) per Plan No. 12894 O J C d E t U tC r+ r� Q Packet Pg. 936 8.J.b 1 RESOLUTION NO. 2 RESOLUTION OF THE CITY OF SAN BERNARDINO APPROVING AMENDMENT NO. 1 TO A CONSULTANT SERVICES AGREEMENT WITH 3 WILLDAN FOR DESIGN OF A TRAFFIC SIGNAL AT ROUTE 210 WESTBOUND 4 WATERMAN AVENUE OFF-RAMP AT 30TH STREET (TC08-09). Cn 5 WHEREAS, on April 19, 2010 the Mayor and Common Council adopted Resolution F 0 M 6 No. 2010-076 approving a Consultant Services Agreement with Willdan for design of a traffic a CL E 7 signal at Route 210 westbound Waterman Avenue off-ramp at 30th Street(TC08-009). 8 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE o 9 CITY OF SAN BERNARDINO AS FOLLOWS: N m 10 SECTION 1. The City Manager is hereby authorized and directed to execute O 11 Amendment No. I to Consultant Services Agreement on behalf of the City, said Amendment cc 12 being attached and incorporated herein as Exhibit"A". L 13 3 14 SECTION 2. The authorization to execute the above-referenced Agreement is E 15 rescinded, if it is not executed within sixty(60) days of the passage of this resolution. L 16 o 17 18 a 19 N 20 O 21 O N CD 22 w 23 E 24 R 25 a 26 27 28 Packet Pg.437' RESOLUTION OF THE CITY OF SAN BERNARDINO APPROVING AMENDMENT 1 NO. 1 TO A CONSULTANT SERVICES AGREEMENT WITH WILLDAN FOR 2 DESIGN OF A TRAFFIC SIGNAL AT ROUTE 210 WESTBOUND WATERMAN AVENUE OFF-RAMP AT 30TH STREET (TC08-09). 3 4 1 HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor and 5 Common Council of the City of San Bernardino at a meeting 0 6 thereof,held on the day of , 2013, by the following vote,to wit: R CL 7 E cc Council Members: AYES NAYS ABSTAIN ABSENT 8 0 9 MARQUEZ N 10 JENKINS L 0 11 VALDIVIA c M 12 SHORETT 13 Y KELLEY 3 14 15 JOHNSON d L 16 MCCAMMACK o w 17 -� d 18 E Georgeann Hanna, City Clerk Q 19 The foregoing resolution is hereby approved this day of ,2013. N 20 0 21 0 22 Patrick J. Morris,Mayor City of San Bernardino 23 Approved as to form: E 24 JAMES F. PENMAN, 25 City Attorney a 26 By. 27 28 Packet`Pg.938 EXHIBIT"A" 0 AMENDMENT NO. 1 TO CONSULTANT SERVICES AGREEMENT WITH WILLDAN FOR DESIGN OF A TRAFFIC SIGNAL AT ROUTE 210 WESTBOUND _ WATERMAN AVENUE OFF-RAMP AT 30TH STREET (TC08-009) a THIS AMENDMENT is made and entered into this day of o 2013 ("Effective Date"), by and between the CITY OF SAN BERNARDINO, a charter city —�"'- ("City"), and WILLDAN("Consultant"). _ 0 WITNESSETH : N d A. WHEREAS, on April 19, 2010 the Mayor and Common Council adopted Resolution No. 2010-076 approving a Consultant Services Agreement with Willdan for design of a traffic signal at Route 210 westbound waterman Avenue off-ramp at 301h Street (TC08-009); M 0 and r �a CL B. WHEREAS, Consultant has completed all work associated with the design of a traffic M 15 signal at Route 210 westbound waterman Avenue off-ramp at 30th Street (TC08-009); and o m C. WHEREAS, on May 20, 2013 a construction contract was awarded to Siemens 3 Industry, Inc. for installation of the traffic signal at Route 210 westbound waterman Avenue off-ramp at 30th Street(TC08-009); and r D. WHEREAS, said Services Agreement with Consultant as approved on April 19, 2010 expired on December 31, 2011; and E. WHEREAS, City wishes to retain Consultant's services to provide design support during construction; and F 0 F. WHEREAS, Consultant represents that it has that degree of specialized expertise contemplated within California Government Code, Section 37103, and holds all necessary o licenses to practice and perform the services herein contemplated; and w d G. WHEREAS, City and Consultant desire to contract for specific services in connection with the project and desire to set forth their rights, duties and liabilities in connection with a the services to be performed; and = H. WHEREAS, no official or employee of City has a financial interest, within the provisions of California Government Code, Sections 1090-1092, in the subject matter of this ' Agreement. Q NOW, THEREFORE, for and in consideration of the mutual covenants and conditions contained herein, the parties hereby agree as follows: w _ lA. SERVICES PROVIDED BY CONSULTANT E Section 1.1. "Scope of Services" of said Consultant Services Agreement is hereby a C 'OA tale lts ana.`^ttf:hti yhl.,}1C ltj?<n!1\L.ix:<ii 5ci±ittts\I'cati��\',)2rurtarrati\s�r;.ti�rrr,arairtc�:itycrt.:.�;:rlk�rraruinc.i,}�a.t,?`1_'.,...ttt\14orki '�lftc-httlttr;.�.[IU'.?.duc 1 EXHIBIT"A" amended to add the following: On-call support during construction when assistance is o needed by the City Engineer for change orders or interpretation/corrections to the plans in accordance with letter proposal from Willdan dated May 22, 2013, attached and incorporated herein as Attachment"A". a 2.0. COMPENSATION AND BILLING N Section 2.1. "Compensation" is hereby amended to add the following: Consultant shall be compensated for on-call support during construction on a time and material basis, o based on Consultant's current rate schedule, a copy of which is attached hereto as 2 Attachment "B" and made a part hereof. Cost of correcting the plans due to errors or omissions by the Consultant shall not be billable. The total reimbursement for this additional w service shall not exceed $5,000.00 0 4.0 TERM r a Section 4.1. "Term" is hereby amended to add the following: The term of said Consultant Services Agreement is hereby extended retroactively from December 31, 2011 to 0 December 31,2013. m All other terms and conditions of said Consultant Services Agreement as approved by ° Resolution No. 2010-076 shall remain in full force and effect, w r C P M w 0 c a� .N d r.+ C d E d d i Q C lC a t X W w C d E t V Q M.'ines'Pi£.'mp(no��(cai "!e`tL]!iz)�\t c:l.ij?'t'��?ttliii•17:i c;�ti 171�3f:J`tl�ll'i�;i1:ri:7�1 L-s-.!'tii17'1 L�(..'.ri i,.trcliiicn its ca.CC?"�t2.c�srn\S, r`mv B,J.c EXHIBIT "A" 0 AMENDMENT NO. 1 TO CONSULTANT SERVICES AGREEMENT WITH WILLDAN FOR DESIGN OF A TRAFFIC SIGNAL AT ROUTE 210 WESTBOUND d WATERMAN AVENUE OFF-RAMP AT 30TH STREET (TC08-009) a IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their respective authorized officers, as of the date first above written. N T CITY OF SAN BERNARDINO, CONSULTANT 0 A Municipal Corporation WILLDAN d s By M Allan Parker, City Manager Signature M CL E Name and Title 0 m 0 N w Approved as to form: James F. Penman, City Attorney co in By: �C — 0 .y d 0 _ m E d a� L Q _ l0 a r x w w c CD E (low w a C':\D n u lu.ttts r, d Sctltn t> \�C1111?�?ati.t ltu rTi]t��\t:llttl�i'Yi1aTs ltlip�;if�4�i1<JS(lil'Ik'T7 A1�di110C[ijia.IQZ1^.t...?i�47\41'crt i:\��[.Yl;tlSl�i�itf� ` 3 ATTACHMENT "A" �WI LLDAN your ding Engineering I reach r co May 22, 2013 Z 0 M w tC Q. Mr. Michael Grubbs, Project Manager E City of San Bernardino rr_ Department of Development Services p Public Works Division o 300 North "D" Street, 3rd Floor N San Bernardino, CA 92418 0° R L Subject: Proposal to Provide Design Support Services during Construction for 30th ,o Street at 210 Fwy Off-Ramp (Waterman Exit) Traffic Signal v Dear Mr. Grubbs: Willdan Engineering (Willdan) is pleased to submit this proposal to provide design support services 3 for the City of San Bernardino for construction of the traffic signal installation for 30th Street at the = 210 Freeway Off-Ramp (Waterman Exit). This traffic signal is being constructed by Siemans Q E Industry, Inc. under a Caltrans Encroachment Permit. Willdan will provide the City of San Bernardino assistance during the construction process, to include but not limited to, inquiries, Q change orders, material approval, interpretation of plans and specifications, and meetings. 0 r r Willdan concurs with extending the terms of the original Agreement to December 31, 2013. c a� Willdan will provide the above services on a time-and-materials basis, not-to-exceed $5,000 based E on the attached Billing Rate Schedule. a Please indicate the City's approval and authorization to proceed by signing below and returning one N to our office. M r N Thank you for giving us the opportunity to assist the City of San Bernardino. If you have any N questions, please contact Mr. Bob Burch at (562) 908-6242. o Respectfully submitted, Approval and Authorization to Proceed By: 0 CL 0 L WILLDAN ENGINEERING CITY OF SAN BERNARDINO a c M Lew Gluesing, PE, TE, PTOE <t Director of Engineering Signature a� E Date r a Enclosure c CID BB:mh E 91005-11\06-160\P13-106 7685 w Q Engineering and Planning I Energy Efficiency and Sustainability I Financial and Economic Consulting National Preparedness and Interoperability 562.906.6200 1 900.499.4484 1 tax:562.695.2120 1 13191 Crossroads Parkway North,Suite 405,Industry,California 91746-3443 1 www.wllldan.com Packet Pg. 942 ATTACHMENT "B" WILLDAN ENGINEERING Schedule of Hourly Rates Effective July 1,2012 to June 30,2013 ENGINEERING LANDSCAPE ARCHITECTURE Principal Engineer............................................................$200.00 Principal Project Manager ...................................---,.....180.00 c Director............................................,....».........,.......,»...,...... 180.00 Principal Landscape Architect.................................,...........150:00 cn Deputy Director.................................................................. 180.00 Senior Landscape Architect................................................125.00 Principal Project Manager ............................................. ... 180.00 Associate Landscape Architect...........................................115.00 0. City Engineer...................................................................,.. 180.00 Assistant Landscape Architect ...........................................100.00 E Project Manager................................................................. 180.00 Program Manager ..._..................,.........,,.,,,,......,.»,..,..,...... 180.00 BUILDING AND SAFETY ,w Supervising Engineer..........----........ ................ 160.00 Director........................................................................,......180.00 O Senior Engineer.........................................,...,................... 145.00 Deputy Director................................................................... 180.00 0 Senior Design Manager.......................... ......, ..... .,. 145.00 Principal Project Manager .... ..,, ...,. ..................................................180.00 N Design Manager................................................................. 135,00 Supervising Plan Check Engineer.......................................150.00 00 Associate Engineer............................................................ 135.00 Building Official...........,.....................................»,.,.,.,,......,..150.00 3: Senior Designer.................................................................. 130.00 Plan Check Engineer..........................................................140.00 0 Senior Design Engineer I1................................................... 130.00 Deputy Building Official.......................................................140.00 y- Senior Design Engineer L............................... 125.00 Inspector of Record................ .........140.00 Designer II.......................................................................... 120.00 Senior Plans Examiner........................................................125.00 Designer I..... ................... ......... 115,00 Supervising Building Inspector............... ....................125.00 Design Engineer II.............................................................. 120.00 Plans Examiner....... ..... ....................... ..,................115.00 Design Engineer I..............................,.,.............................. 115.00 Senior Building Inspector................................,...................115.00 GIS Analyst III.................:.................................................. 150.00 Supervisor Code Enforcement............................................115.00 3 GIS Analyst II..............................................,...................... 130.00 Building Inspector.........................................,.......**105.00/110.00 = GIS Analyst I..................................................................,... 115.00 Supervising Construction Permit Specialist.........................105.00 m Senior Drafter..................,.................................................. 110.00 Senior Construction Permit Specialist................,................100.00 y Drafter II..........................».,.,......,,..,................................... 100.00 Senior Code Enforcement Officer.........................................95.00 L Drafter I.............................................................,..................95.00 Assistant Building Inspector...................................**95.00/110.00 Q Technical Aide......................................................................85.00 Code Enforcement Officer............ ..... .....80.00 Construction Permit Specialist..............................................80.00 r CONSTRUCTION MANAGEMENT Assistant Construction Permit Specialist...............................85.00 Director...........................................................---............ 180.00 Plans Examiner Aide.............................................................75.00 Deputy Director............................. .... 180.00 Assistant Code Enforcement Officer...... .....70.00 .,.......... .. E Project Manager..................... .. ... ..... 180.00 Q Senior Construction Manager..................----............,...... 155.00 PLANNING Construction Manager........................................................ 145.00 Director .....,..........180.00 Assistant Construction Manager......................................... 120.00 Deputy Director.....................................................----....180.00 - ...... 125.00 Principal .....150.00 N Utility Coordinator.......................................�...........:..... pal Planner...........................................,................ -- Labor Compliance Manager............................................... 120.00 Principal Community Development Planner......................,.150.00 M Labor Compliance Specialist.................. .....95.00 Senior Planner N ......................... .................................................,......,...,.,.....130.00 Senior Community Development Planner...........................130.00 cat INSPECTION SERVICES Associate Planner.........................................-... ............115.00 LO Supervising Public Works Observer................................... 120.00 Associate Community Development Planner...........---....115.00 Senior Public Works Observer........................................... 110.00 Assistant Community Development Planner..............,..,.....105.00 5 Public Works Observer.......... ..............................-100.00/110.00 Assistant Planner..........................................,.....................105.00 � Assistant Public Works Observer ........................**100.00/110.00 Planning Technician................................................,.............85.00 Community Development Technician....................................85.00 MAPPING AND EXPERT SERVICES Principal Project Manager ................................................. 180.00 ADMINISTRATIVE ti Supervisor-Survey&Mapping.......................................... 155.00 Computer Data Entry................................:.....,.....................65.00 c Senior Survey Analyst............................................... ........ 130.00 Clerical 65,00 Senior Calculator................................................................ 120.00 Word Processing.............................................,....................65.00 Calculator 11....................................................................... 110.00 Personal Computer Time................................ ....... ....30.00 'S CalculatorI......................................................................... 100.00 m Survey Analyst II ................................................................ 115.00 Survey Analyst I ................................................................. 100.00 Mileage reimbursement will be charged at the current Federal guideline rate at the time of billing. Vehicles will be charged at a monthly rate of$500.00. ** Prevailinq Wage Project, Use$110.00 Additional billing classifications may be added to the above listing during the year as new positions are created. Consultation in connection with litigation and court appearances will be quoted separately. The above schedule is for straight time.Overtime will be charged at 1.25 times,and Sundays and holidays, 1,70 times the standard Q rates.Blueprinting, reproduction,messenger services,and printing will be invoiced at cost plus fifteen percent(15%). A sub consultant management fee of fifteen percent (15%)will be added to the direct cost of all sub consultant services to provide for the cost of administration,consultation,and coordination.Valid July 1,2012 thru June 30, _ 2013,thereafter,the rates may be raised once per year to the value of change of the Consumer Price Index for the Los Angeles/Orange County/Sacramento area,but not d IC more than five percent per year E U a Packet Pg. 943