Loading...
HomeMy WebLinkAbout08.I- Public Works DOC ID: 2522 B CITY OF SAN BERNARDINO—REQUEST FOR COUNCIL ACTION Agreement/Contract Amendment From: Robert Eisenbeisz M/CC Meeting Date: 06/17/2013 Prepared by: Mark Raab, (909) 384-5140 Dept: Public Works Ward(s): Subject: Request for Approval of Contract Change Order No. 1 to Nikola Corporation for the "H" Street Sewer Improvement Project Between 17Th Street and Highland Avenue, Per Plan No. 12621 (SW 11-002) (#2522) Current Business Registration Certificate: Financial Impact: This project was initially funded by two sources through Capital Project No. SW 11-002 (Account No. 132-160-5504-7901-0025) and Capital Project No. SW08-003 (Account No. 245- 160-5504-7762-0025). The approved contract amount is $674,000.00 with an additional contingency amount of$67,400.00. The adopted budget for FY 2012-13 identified$60,000 for this project to cover remaining construction expenses. The proposed change order amount is $19,897.23, which is within the contingency budget. The contractor has been paid$640,300 and there is a retention amount of$33,700 currently held by the City. Account Budgeted Amount: $60,000.00 Account No. 245-160-5504-7762-0025 Account Description: 17th Street& "H" Street Sewer Main Replacement Street (SW08-003) Balance as of May 30, 2013: $60,000.00 Cost of this item: $19,897.23 Balance after approval of this item: $40,102.77 Please note this balance does not indicate available funding. It does not include non-encumbered reccurring expenses or expenses incurred,but not yet processed. Motion: Authorize the Director of Public Works and the City Manager to execute Contract Change Order No. One with Nikola Corporation for the "H" Street Sewer Improvements between 17th Street and Highland Avenue, per Plan No. 12621 (SW11-002) in the amount of$19,897.52. Synopsis of Previous Council Action: 07-05-11 The Mayor and Common Council adopted the FY 2011-12 to FY 2015-16 Capital Improvement Program (5-year CIP). 04/16/12 The Mayor and Common Council awarded a contract to Nikola Corporation for Sewer Improvements on "H" Street and the Adjacent Alleys between 17th Street and Highland Avenue,per Plan No. 12621 (SW11-002). Background: On April 16, 2012, the Mayor and Common Council awarded a contract to Nikola Corporation Updated:6/11/2013 by Henry Empeno Jr.B [Packet Pg.930 8.1 2522 for the replacement of approximately 7,600 lineal feet of sewer line in "H" Street between 17th Street and Highland Avenue. The contract included replacement of existing sewer mainline and manholes, as well as some repairs to sidewalk, curb and gutter, driveway approaches and street surfaces impacted by the pipe construction. A Notice to Proceed was issued to the contractor, and work was scheduled to begin Monday April 30, 2012. The following day, staff was contacted by the contractor that several areas marked by Southern California Gas Company appeared to be in direct conflict with the City's sewer line replacements. These conflicting facilities were recently installed by the Gas Company in a location that was unexpected. On May 7, the Gas Company agreed to meet with staff and Nikola on-site to review and investigate these conflicts and to help determine what could be done to minimize further construction delays on this project. Nikola was directed to continue with construction in "H" Street, and begin construction in one of the alleys to determine the extent of the conflicts and the associated additional cost anticipated for replacement of the mains along all of the alleys. All of the extra costs for this time and material work have been reflected in this change order. After careful consideration of the gas line conflicts, it was determined that the best course of action was to eliminate several alley mains from the contract and deduct their associated cost from the scope of work. There were additional time delays and impacts to the project from existing storm drain laterals that were unmarked, and an overly deep 14-inch water main that ran parallel to the proposed sewer line in "H" Street. Several sewer manholes were changed from a standard type manhole to a drop sewer manhole to avoid conflicts with the aforementioned water main. Additional changes to the scope of work include additional potholing,pavement repairs, and changes to unit pricing allowed by the contract as a result of deducting the alley work. The contractor has been paid $640,300 for all work completed to date, with $33,700.00 held in retention. The net effect of this Change Order No. 1 will result in an additional $19,897.23 (2.95%) due the contractor,which is under the approved contingency amount for this project. Supporting Documents: Exhibit A-CCO#1 to Nikola (PDF) Updated: 6/11/2013 by Henry Empeno Jr. B Packet Pg. 931 8.La EXHIBIT "A" PUBLIC WORKS DEPARTMENT 300 North D Street• San Bernardino • CA 92418-0001 Engineering 909.384.5111•Fax: 909.384.5155 Facilities 909.384.5244-Fax: 909.384.5155 www.sbcity.org San Bernar ino sa L CONTRACT CHANGE ORDER NO. ONE U) L 0 FILE NO. 1.7901 W.O. NO. 7901 DATE: JUNE 17, 2013 d PROJECT: STREET SEWER IMPROVEMENT PROJECT ON "H" STREET, BETWEEN d 17TH STREET AND HIGHLAND AVENUE, PER PLAN NO. 12621 (SS-11-002). o a TO: NIKOLA CORPORATION L 18012 COWAN, STE. 240 3 IRVINE, CA 92614 in GENTLEMEN: z6 L 0 You are hereby compensated for performing the additional work as follows: O d ITEM NO. DESCRIPTION OF CHANGE COST c Perform time and material work to identify unexpected gas line conflicts in existing alleys, resolve unexpected conflicts with existing storm drain, 1-1 resolve unexpected conflicts with existing 14-inch water, resolve issues $ 203,532.92 with change of sewer manhole type, perform additional potholing, and o perform additional pavement repairs. v Final pay adjustment due to increases/deductions in actual quantities of 1-2 $-183,635.43 N construction pay items. N TOTAL COST: $ 19 897.52 c� 6 JUSTIFICATION: Z 0 Perform time and material work to identify gas line conflicts in existinE alleys During construction, several conflicts with the existing gas lines in each of the alleys were v discovered. Time and material charges were authorized in order to pay the contractor to c� pothole and excavate areas to assess the conflicts. a Resolve conflicts from existing storm drain line in "H"Street During construction, a conflict was discovered with an existing storm drain catch basin lateral, requiring a change in pipe gradients between adjacent manholes. This change order w ITEM provides for payment to the contractor for additional work due to the increased depth of NO. 1-1 pipe. m Resolve conflicts from existing 14-inch water main During construction, it was discovered that an existing water line was overly deep, and r required a change in sewer manhole type to accommodate the connecting pipes. This a change order provides for the additional work required in order to make the manhole changes and changes in pipe gradients. Additional potholing and pavement repairs Due to changes in the project scope referenced above, additional potholing was required prior to and during construction to identify and evaluate underground conflicts. This change 1 Packet Pg.932 CHANGE ORDER NO.ONE—NIKOLA CORPORATION STREET SEWER IMPROVEMENT PROJECT ON"H"STREET,BETWEEN 17TH STREET AND HIGHLAND AVENUE, PER PLAN NO. 12621 (SS-11-002). order provides for payment of this additional work and the consequential pavement repairs. m L Final pay adjustment due to increases/Deductions in actual construction pay items(s) c`n ITEM I-2 This change order provides for the elimination from the contract items that were = NO. subsequently completed as extra work, along with associated deductions from the contract ,o quantities. d SUMMARY OF CONTRACT COSTS a� 0 L 0. The estimated revised contract cost is as follows: E E Original Total Bid Amount:................................................................. $ 674,000.00 Contract Change Order No. 1 .............................................................. $ 19,897.52 C? Revised Construction Contract Amount.................................................. $ 693,875.52 0 z Additional Time to Complete Contract due to this Change Order.............. 0 Working Days 0 The current change order represents an overall increase of 2.95% of the original contract amount. _ U NIKOLA CORPORATION CITY OF SAN BERNARDINO � CONTRACTOR PUBLIC WORKS DEPARTMENT w 0 Accepted Approved U By: By: N TONY FROSSARD N Title: Director of Public Works 0 Y Date: Date: z 0 r Approved *� By: v ALLEN PARKER v City Manager Q Date: ° X W c E MCC date approved: June 17,2013 Agenda Item No. w Q i i I i 93 2 Pck: Pg 3