HomeMy WebLinkAbout08.A- City Manager 420000001kE
DOC ID: 2524 A
CITY OF SAN BERNARDINO—REQUEST FOR COUNCIL ACTION
Agreement/Contract
From: Allen Parker M/CC Meeting Date: 06/17/2013
Prepared by: Brandon Mims, (909) 384-5122
Dept: City Manager Ward(s): All
Subject:
Request for Authorization to Issue a Request for Qualifications/Bids for Maintenance of the City
of San Bernardino's Park System (#2524)
Current Business Registration Certificate: Not Applicable
Financial Impact:
Pursuant to the pendency plan,the City should be moving toward contracting out maintenance of
the parks. Funds for the purpose will be included in the Department's 2013-2014 Budget in
Account Number 001-380-000-5502.
Motion: Authorize the City Manager's Office to issue a Request for Qualifications/Bids for
Maintenance of the City's Park System.
Synopsis of Previous Council Action:
This item was first considered on October 15,2012 to address park and maintenance cost issues
contained in the August 29, 2012, Pre-Pendency Plan. At that time, the City Council was not
able to authorize issuance of the Request for Proposals because the bid process was considered
not specific enough to the City's landscape maintenance needs.
The City Manager's Office reviewed Public Works'proposed process and consulted extensively
with the Park Division and determined that a two step procurement process where in the City
pre-qualifies potential firms and then engages those firms in a detailed bid process will return the
most accurate bid costs.
Background:
The annual contract for parks and landscape maintenance for the City of San Bernardino has
been prepared for maintenance of all parks, medians and parkway. The City has 38 parks and 57
lawn area it maintains, approximately 500 acres of open space.
Supporting Documents:
Updated: 6/12/2013 by David Cain A Packet Pg.797
1 RESOLUTION NO.
2 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF
SAN BERNARDINO AUTHORIZING THE FINANCE DEPARTMENT TO ISSUE A
3 REQUEST FOR STATEMENTS OF QUALIFICATION AND LATER A REQUEST
4 FOR PROPOSALS FOR PARKS MAINTENANCE AND LANDSCAPE
MAINTENANCE SERVICES.
5
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE
6 CITY OF SAN BERNARDINO AS FOLLOWS:
7
8 SECTION 1. The Finance Department is hereby authorized and directed to issue a
9 Request for Statements of Qualification, and later a Request for Proposals, for Parks
10 Maintenance and Landscape Maintenance Services, attached and incorporated herein as
11
Exhibit"L"
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 ///
I RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF
SAN BERNARDINO AUTHORIZING THE FINANCE DEPARTMENT TO ISSUE A
2 REQUEST FOR STATEMENTS OF QUALIFICATION AND LATER A REQUEST
FOR PROPOSALS FOR PARKS MAINTENANCE AND LANDSCAPE
3 MAINTENANCE SERVICES.
4 I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor
5
6 and Common Council of the City of San Bernardino at a meeting
7 thereof, held on the day of , 2013, by the following vote, to wit:
8 Council Members: AYES NAYS ABSTAIN ABSENT
9 MARQUEZ
10
JENKINS
11
12 VALDIVIA
13 SHORETT
14 KELLEY
15 JOHNSON
16 MCCAMMACK
17
18
19 Georgeann Hanna, City Clerk
20 The foregoing Resolution is hereby approved this day of , 2013.
21
22
Patrick J. Morris, Mayor
23 City of San Bernardino
24 Approved as to form:
25 JAMES F. PENMAN,
City Attorney
26
27 By:
28
[EX HIBITS 1
.n... t City of San Bernardino
300 North D Street
San Bernardino, California 92418
Tel: (909) 384-5122
Fax: (909) 384-5193
-02 - Request for Statements of Qualification and Invitation
for Bids for maintenance of the City of San
Say Pruarfilo Bernardino's Park System, RFP
y No. 2014-CM-001
SM
General Information
The City of San Bernardino ("City") will (1) pre-qualify Prospective Bidders and (2)
only receive_ bids from those pre-qualified Bidders for contract landscape
maintenance services:
The work to be done, in general, consists of furnishing (and/or absorbing) all labor,
materials, tools, equipment, and incidentals necessary, except as otherwise specified,
to maintain the City of San Bernardino's park system, which includes 38 parks and 57
median and parkway sites, approximately 500 acres.
Tentative Calendar
Request Issue Date June 18, 2013
Statement of Qualification Deadline July 2, 2013 (Step 1)
Bidders' Conference/Park Tour July 9, 2013 (Mandatory)
Bidder Inquiry July 10-25, 2013
Deadline for Bids July 29, 2013 (Step 2)
Contract Award Date (Goal) August 5, 2013
Contract Award Date (Late) August 19, 2013
Work Start Date
First Day of Work (Goal) August 15, 2013
First Day of Work (Late) August 29, 2013
As part of the qualification process (Step 1), Prospective Bidder must submit a
Statement of Qualification ("SOQ") and be approved by the City to submit a bid for
landscape maintenance services. The City will pre-qualify up to five (5) of the highest
ranked Prospective Bidders (landscape maintenance contractors) to bid on the
aforementioned work.
1. City will only pre-qualify Prospective Bidders (including any potential sub-
contractors or Key Personnel) who meet the following minimum qualifications:
Request for Statements of Qualification and Invitation for Bids for the City of San Bernardino's Park
System, RFP No. 2014-CM-001
Due: July 29, 2013»»»»»»»»» Should this be July2?
Requests for Information: Myers Ha(a sbcity.org
Page 2 of 15
a. Five years of experience as a continuously operating entity engaged in the
' performance of landscape maintenance services with no record of
unsatisfactory performance.
b. Landscape maintenance services contracts of a similar nature and
complexity completed within the past five years with a contract dollar
amount of at least $100,000 each for at least three different Public
Agencies or three separate owners. Have the administrative and fiscal
ability to maintain the City's park system.
2. Key Personnel for the Prospective Bidder shall be committed to the Project for
the entire term of the contract and have the ability to make adjustments to the
maintenance operation on-site.
3. Prospective Bidder must be able to receive e-mails from the City and respond
with 48 hours.
4. The City reserves the right not to award a contract as a result of this request.
The City reserves the right to award part and/or any part of the park system to
any one and/or multiple Bidders..
Bidders' Conference/Park Tour
A Bidders' Conference/Park Tour will be held on July 9, 2013 at 10:00 a.m. at the City
of San Bernardino, City Hall, 300 North "D" Street, San Bernardino, CA 92418. While
attendance is not required, it is highly recommended.
All inquiries received and responses given prior to the close of the Bidders'
Conference/Park Tour will be posted on the City's website at: http://www.sbcity.org by
5:00 p.m. on July 13, 2013.
At any time the City may issue one or more addenda to the RFP, if the City decides
that additional information or clarification is needed. Addenda shall be emailed to the
pre-qualified bidders. Any addenda to the RFP will be also be posted on the City's
website.
Detail Notes on Preparation of the Statement of Qualification
NOTE: PROSPECIVE BIDDER'S ABILITY TO READ THE STEPS BELOW AND
UNDERSTAND THE CONTENT WILL BE CONSDIERED IN THE ASSESSMENT OF
THEIR QUALIFICATIONS.
1. Prospective Bidder's Statement of Qualification should be clear, concise and
accurate enough for a team of City staff (Parks Maintenance Division and Public
Request for Statements of Qualification and Invitation for Bids for the City of San Bernardino's Park
System, RFP No. 2014-CM-001
Due: July 29, 2013»»»»»»»»» Should this be July2?
Requests for Information: Myers Ha sbcit .or
Page 3 of 15
Works staff) to make a thorough evaluation and arrive at a sound determination
as to whether the company/contractor meets the City's requirements. Prospective
Bidder will not have an opportunity to demonstrate qualifications outside of the
approved process outlined in this document.
2. Direct all questions, inquiries and requests for information to Harriet Myers at
Myers Ha@sbcity.org no later than . Oral explanations or instructions will not be
accepted or binding upon the City. Any information provided to any Prospective
Bidder concerning this document will be furnished to all Prospective Bidders in
writing as an Addendum to this document by e-mail distributed from
Myers HaC@_sbcity.orq and posted on the City's website.
3. Statements of Qualification must be mailed first-class, postage pre-paid to:
City of San Bernardino,
City Clerk's Office,
Attn: Harriet Myers - 2014-CM-001,
300 North "D" Street,
San Bernardino, CA 92418
Statements of Qualification must be postmarked no later than the "Statement of
Qualification Deadline" date. Prospective Bidder may not personally deliver its
Statement of Qualification. . To confirm receipt of a Statement of Qualification,
Prospective Bidder must send a brief e-mail to Myers Hana sbcity ora with its agency
name and mail-date.
Request for Statements of Qualification and Invitation for Bids for the City of San Bernardino's Park
System, RFP No. 2014-CM-001
Due: July 29, 2013»»»»»»»»» Should this be July2?
Requests for Information: Myers HaCa sbcity orq
Page 4 of 15
Introduction
1. Transmittal Letter
Transmittal Letter shall name the proposed Prime Contractor, its legal structure
(i.e., corporation, partnership, limited partnership, joint venture). If a joint venture
or partnership is proposed, Prospective Bidder shall identify partners and/or
members of the joint venture and their roles and responsibilities. Prospective
Bidder shall state that the Key Personnel listed in the SOQ will be used for the
Project and that no substitutions will be allowed without the City's consent.
2. Table of Contents
Prospective Bidder shall provide a table of contents for its SOO submission,
identifying the entire contents of its SOO submission. The SOO submission shall
be stapled or otherwise bound and clearly labeled and shall contain labeled
dividers for each component of the SOO submission. The SOQ should not
exceed 30 pages excluding dividers. The SOO need not be overly ornate in
design or presentation, Prospective Bidder should use the most effective method
for conveying the merits of its firm.
3. Questionnaire
The completed Statement of Qualification Questionnaire (attached hereto) is a
requirement for the SOO package. Any submission which does not include a
completed Statement of Qualification Questionnaire will be considered
incomplete. Prospective Bidder will not be given additional time the deadline to
complete any component of this process. Prospective Bidder is required to
ensure its answers are accurate and thorough. Prospective Bidder shall include
any documents necessary to support the questionnaire.
4. Resume of Proposed Key Personnel
Prospective bidder shall provide resumes for each of the Key Personnel
(supervisor and irrigation technicians and higher) that will be committed to the
Project for the entire term of the contract. Resumes shall include the following:
a) Name and proposed assignment of Key Personnel (do not include home
addresses or any other personal information).
b) Years of landscape maintenance services related experience.
c) Education/experience of Project staff
Request for Statements of Qualification and Invitation for Bids for the City of San Bernardino's Park
System, RFP No. 2014-CM-001
Due: July 29, 2013»»»»»»»»» Should this be July2?
Requests for Information: Myers Ha(cDsbcity.org
Page 5 of 15
d) Professional designations/registrations of Project staff (Certified Landscape
Technician's, Certified Arborist, Qualified Applicators Certificate, Bay Friendly
Landscaper, CPR, Certified Water, Manager, Certified Water Auditor, etc.
e) Experience directly related to the projects listed in Section 1, General
Information, above.
f) At least three client references, including contact names, addresses and
telephone
g) Description of projects of a similar nature worked on in the past five years.
5. Capability to Provide Required Performance and Payment Bonds
Prospective Bidder shall include a letter from a surety duly licensed to do
business in the State of California, having a financial rating from A.M. Best
Company of A-, VII or better that the surety has agreed to provide Prospective
Bidder with the required performance and labor and materials payment bonds in
accordance with the Invitation for Bids. Prospective Bidder shall include a
statement authorizing the City to contact the named City of Suisun surety and
verify that the surety will, based upon the estimated construction costs contained
herein, issue the required bonds under the conditions stated.
6. Ability to Provide the Required Insurance
Prospective Bidder shall provide a letter from its insurance broker/agent or
underwriter and/or certificates of insurance, confirming that Prospective Bidder
can obtain the required insurance coverages and amounts specified in section
"Insurance" from insurer(s) having a financial rating from A.M. Best Company of
A-, VII or better. Prospective Bidder may redact renewal dates from certificates
of insurance submitted for the SOQ. However, renewal dates may not be
redacted from certificates of insurance provided by the successful Bidder upon
award of the contract for the Project.
7. Litigation History
Description of Prospective Bidder's litigation history for the past five (5) years,
including names of involved parties, nature of dispute, and disposition for each
instance.
STATEMENT OFQUALIFICATION QUESTIONNAIRE FOLLOWS ON NEXT PAGE
Request for Statements of Qualification and Invitation for Bids for the City of San Bernardino's Park
System, RFP No. 2014-CM-001
Due: July 29, 2013»»»»»»»»» Should this be July2?
Requests for Information: Myers Ha(d�sbcity.org
Page 6 of 15
STATEMENT OF QUALIFICATION FORMAT
Prospective Bidder shall complete the entire Statement of Qualification Questionnaire
and submit it in accordance with the Instructions to Prospective Bidder and provisions of
Statement of Qualification. Failure to complete the questionnaire or inclusion of any
false statement(s) shall be grounds for immediate disqualification.
CONTACT INFORMATION
OFFICIAL AGENCY/ORGANIZATION NAME AND ADDRESS: Indicate address, as it is to
appear on agreement.
Name:
Address:
City:
Zip Code:
Federal Employee ID #:
Telephone: ( )
Fax: ( )
Email:
SCOPE OF WORK
1. Furnish all labor, materials, tools, equipment, supervision, and transportation
required to maintain the Parks in an attractive condition throughout all seasons of
the year. This includes the formal Park grounds, all amenities in the Park, the
slope easements, and trail entrances into the Park.
2. Ball Fields shall be raked and clean at all times. Irrigation system is to irrigate all
areas properly to care for all areas.
3. The contractor shall have full control over ensuring water requirements are met.
All main water line repairs are included in the contract price and no additional
compensation shall be allowed.
4. Contractor shall be responsible for maintaining and repairing the entire irrigation
system starting at the meter connection. This coverage applies to all controllers,
backflows, remote control valves, gate valves, main and lateral lines, sprinkler
heads, and moisture sensing devices. Repairs due to vandalism will not be
Request for Statements of Qualification and Invitation for Bids for the City of San Bernardino's Park
System, RFP No. 2014-CM-001
Due: July 29, 2013»»»»»»»»» Should this be July2?
Requests for Information: Myers HaRsbcity oro
Page 7 of 15
considered extra work outside of this Scope of Work. The maintenance and
repair work described in this Scope of Work shall be performed as a continuous
and constant program throughout the term of the contract. This includes spring
and fall soil aeration and over-seeding as well as seasonal grub control.
5. All weeds shall be removed.
6. Nutrient care standards within parks are as required to promote good growth with
not less than the following: ground cover areas three applications per year at
appropriate spread rate and trees and shrubs one application per year for areas
outside ground cover area.
7. Lawn care standards are not less than the following: aeration once per year,
mowing weekly to height at 2 and '/Z inches to 3 inches removing excess
clippings, be courteous and mindful of park users, edging twice monthly, blown
free of all clippings, raking leaves as needed, trim trees once during term of
contract and pruning following ISA pruning standards, spraying and weeding to
control weeds and disease.
8. Contractor is to provide complete and continuous control and/or eradication of all
rodents in an appropriate manner, in accordance with all laws and regualtions.
9. With regard to general maintenance within parking areas (e.g., Metrolink facility),
contractor is expected to keep areas free and clear of litter, broken glass, or
other debris. Parking lot areas shall be cleaned twice a week.
10.All trash containers shall be inspected weekly and emptied. No trash cans shall
have foul odors.
11.Sidewalks and pathways and surfaces shall be policed and cleaned once each
week.
12.Restrooms shall be cleaned daily, water closets scrubbed, and graffiti removed.
13.Tissue and paper products shall be checked and refilled daily.
14.Contractor is to maintain all equipment and supplies required to maintain
restrooms in clean and orderly manner.
15.Contractor shall keep toilets, sinks, and drinking fountains clean and operational
16.at all times. This shall include unplugging of toilets, sinks and drinking fountains.
17.Restrooms are to be open and closed daily, pursuant to the hours established by
the Mayor and Common Council.
18.All graffiti in park areas or parking areas is to be abated by the Contractor.
19.Tot Lots and Play areas are to be cared for by the Contractor.
20.Playground areas, and skate areas shall be kept free of weeds, graffiti, litter and
debris, such as broken glass or any other objects on a daily basis. Repairs to
play equipment above under $500 shall be the responsibility of the Contractor.
21.Tables, benches, BBQ grills, gazebos, or pits shall be maintained in safe manner
by the contractor. Sports fields including tennis courts, volleyball courts, soccer
fields, horseshoe pits, handball, and tetherball courts shall be maintained and
repaired by the Contractor.
22.Contractor is responsible for graffiti abatement on courts.
Request for Statements of Qualification and Invitation for Bids for the City of San Bernardino's Park
System, RFP No. 2014-CM-001
Due: July 29, 2013»»»»»»»»» Should this be July2?
Requests for Information: Myers Ha(cr)sbcity.orq
Page 8 of 15
23.Contractor to remove dead or damaged grass, bushes, and trees and fix any
change in field elevation including cutting of sod, removing excess material or
relaying sod if necessary to allow for playing of games on field.
24.Little League baseball fields must adhere to specifications set forth by Little
League standards.
25.Contractor is expected to remove tape, balloons, strings or tape from park areas
on a weekly basis to include fenced areas.
26.Contractor to maintain fencing.
27.Paved and unpaved surfaces shall be free of litter, weeds, and debris.
28. Flower beds, shrubs, and ground cover shall be healthy and trimmed, pruned, or
otherwise to maintain healthy and attractive landscape.
29.Contractor is to monitor and maintain Seccombe Lake pH levels and add
chemicals and/or nutrients to keep lake in proper pH balance.
30.Trail areas shall be kept weed-free. Trail surfaces shall be maintained so that the
surface is smooth with no depressions or ruts. Trail surfaces shall be leveled as
needed to remove soil depression or erosion areas created by weather
conditions and public use.
31. Baseball fields at Perris Hill Park where California State University San
Bernardino baseball team plays its home games must be cared, maintained, and
prepared to NCAA rule standards.
32.Turf, edging, mound height, and all aspects of field must be maintained in order
to comply with all rules related to field maintenance during the regular baseball
season and into playoffs if necessary.
33.The cemetery requires two full time staff dedicated to maintenance at the site. In
the event of a burial service, two additional staff will be required as needed at the
site.
34.Any additional work not described in this Scope of Work shall be performed by
the Contractor upon written notice from and at the expense of the City of San
Bernardino.
Is your agency qualified to provide (maintain) the above-mentioned services?
Request for Statements of Qualification and Invitation for Bids for the City of San Bernardino's Park
System, RFP No. 2014-CM-001
Due: July 29, 2013»»»»»»»»» Should this be July2?
Requests for Information: Myers Ha(c�sbcity.orq
Page 9 of 15
CONTRACTOR LICENSING
1. Does Prospective Bidder possess valid and current California Contractor's
license C-27 required for the work proposed as specified in the Notice to
Contractors? Yes No
2. Does Prospective Bidder possess valid and current California Department of
Pesticide Regulation Qualified Applicator License in category C? Yes No
3. Does Prospective Bidder have a minimum of $2,000,000 General Liability
insurance coverage? Yes No
4. Does Prospective Bidder have a minimum of $1,000,000 Auto Liability insurance
coverage? Yes No
5. Does Prospective Bidder have a minimum of $1,000,000 Workers Comp.
insurance coverage? Yes No
6. Has Prospective Bidder's Contractor's License(s) been revoked at any time in the
last five years? Yes No
7. Has Prospective Bidder been terminated by an owner (other than for
convenience), or has a Surety completed a contract for Prospective Bidder within
the last five years? Yes No
Prospective Bidder will be immediately disqualified if any answer to questions 1 2 3 4
or 5 is No.
Prospective Bidder will be immediately disqualified if any answer to questions 6 or 7 is
Yes.
EMERGENCY PLAN
It is necessary that not only the contract schedule be maintained but that emergencies
(irrigation problems are the most common, but may other types of emergencies may
occur) and citizens' concerns are attended to as part of the contract. On a separate
sheet please explain the company plan for dealing with emergency and/or complaint
situations in a timely manner. An Emergency Plan should includes the following:
• Company contacts
• Communications methods available
• Response times for both work hours and after work hours
SAFETY, PREVAILING WAGE, DISPUTES AND BONDS
1. Has Prospective Bidder been cited by Cal/OHSA, Federal OSHA, the EPA, any
Regional Water Quality Control Board or any Air Quality Management District in
+ Request for Statements of Qualification and Invitation for Bids for the City of San Bernardino's Park
System, RFP No. 2014-CM-001
Due: July 29, 2013»»»»»»»»» Should this be July2?
Requests for Information: Myers Ha(o)sbcity.org
Page 10 of 15
the past five years? Yes No If yes, attach a copy of each citation and
describe the circumstances of each.
2. Contractor shall provide a copy of its written Injury and Illness Prevention
Program.
3. Attach your company's pest management policy.
Request for Statements of Qualification and Invitation for Bids for the City of San Bernardino's Park
System, RFP No. 2014-CM-001
Due: July 29, 2013»»»»»»»»» Should this be July2?
Requests for Information: Myers Ha(a)sbcity.orq
Page 11 of 15
PREVAILING WAGE PROVISIONS
This is a prevailing wage contract, has Prospective Bidder been fined, penalized or
otherwise found to have violated any prevailing wage or Labor Code provision? If yes,
attach a copy of each citation and describe the circumstances of each. Yes No
LICENSE PROVISIONS
Has Prospective Bidder changed names or license numbers in the past 5 years? If yes,
please describe the changes and state the reasons for changes. Yes No
If yes, attach an explanation/reason for each change.
DISPUTES
Has Prospective Bidder had any claims, litigation, or disputes ending in mediation or
arbitration, or termination for cause associated with any project in the past five (5)
years? If yes, attach description of each instance including details of total claim amount,
settlement amount, and owner's name and phone number. Yes No
Bonding (An actual Bidder's bond will be necessary at the time of bid July 29 2013)
Provide the following information and documentation of same from Prospective Bidder's
surety:
Bonding Company:
Agent:
Address:
City:
Zip Code:
California Surety #: Yes No
Is surety listed in the current edition of the California Department of the Treasury's
Listing of approved sureties? Yes No
Telephone: ( )
Fax: ( )
Request for Statements of Qualification and Invitation for Bids for the City of San Bernardino's Park
System, RFP No. 2014-CM-001
Due: July 29, 2013»»»»»»»»» Should this be July2?
Requests for Information: Myers Ha(c sbcity.orq
Page 12 of 15
Email:
Total bonding capacity?
What percent does Prospective Bidder pay for bonds?
Request for Statements of Qualification and Invitation for Bids for the City of San Bernardino's Park
System, RFP No 2014-CM-001
Due: July 29, 2013»»»»»»»»» Should this be July2?
Requests for Information: Myers Ha(aDsbcity.org
Page 13 of 15
EXPERIENCE OF PRIME CONTRACTOR
The unique nature of this Project requires that the Prime Contractor and their Key
Personnel possess experience on projects of similar nature and size. Summarize similar
project experience below and provide the detailed project information requested. Please
note, that the information, names and references must be accurate, current and
verifiable. Individual references will be nullified and will not be considered if said
references cannot be reached within a reasonable amount of time through the
reasonable efforts of the City. Any erroneous or unverifiable information provided may
be grounds for disqualification of the contractor and/or the project or reference in
question.
CERTIFICATIONS
Please list any professional registrations held by company staff, by certification and
company member's name. Examples are; Certified Landscape Technician's, Certified
Arborist, Qualified Applicators Certificate/License, Bay Friendly Landscaper, Certified
Water Manager, Certified Water, Auditor, etc.
SIMILAR PROJECTS -PRIME CONTRACTOR
List at least three (3) similar projects with a contract cost of at least $100,000 each,
completed in the past five years. The following information shall be provided for each
project, and shall be enumerated and shown in the order below:
• Project name and location
• Owner name, name of owner's contract representative and current telephone
number
• Name of Contractor's Project Manager or Supervisor
• Description of contract and scope of work performed
• Year started
• Total cost
• Originally scheduled date of completion and any extensions allowed.
EXPERIENCE OF PRIME CONTRACTOR'S PROPOSED KEY PERSONNEL
Provide detailed project information about three (3) of the most recently completed
contracts in which the proposed Supervisor and Irrigation Tech were engaged. The
following information shall be provided for each project, and shall be enumerated and
shown in the order below:
1
Request for Statements of Qualification and Invitation for Bids for the City of San Bernardino's Park
System, RFP No 2014-CM-001
Due: July 29, 2013»»»»»»»»» Should this be July2?
Requests for Information: Myers Ha .sbcity.orq
Page 14 of 15
• List the Contractor's proposed Supervisor and Irrigation Tech to be committed to
the contract.
• List above mentioned Supervisor and Tech's professional registrations.
• Project name and location
• Owner name, name of owner's contract representative and current telephone
number
• Description of project and scope of work performed
• Year started
• Total cost
• Originally scheduled date of completion and any extensions allowed
FINANCIAL INFORMATION
Fill out this form completely. Do not leave blanks.
Has Prospective Bidder ever reorganized under the protection of bankruptcy laws?
Yes No If yes, please state when
Has Prospective Bidder ever had insurance terminated by a carrier? Yes No
If yes, explain on a separate signed sheet marked with correlating cross-reference to
this paragraph of the questionnaire.
INSURANCE
List insurance carrier(s) for the various types below for last five (5) continuous years:
Workers' Cornpensation:
Carrier:
Contact Name:
Address:
Phone and Fax:
Policy Number:
General Liability:
Carrier: Contact Name:
Request for Statements of Qualification and Invitation for Bids for the City of San Bernardino's Park
System, RFP No. 2014-CM-001
Due: July 29, 2013»»»»»»»»» Should this be July2?
Requests for Information: Myers Ha Qsbcity.org
Page 15 of 15
Address:
Phone and Fax:
Policy Number:
Automotive Liability:
Carrier: Contact Name:
Address:
Phone and Fax:
Policy Number:
Policy Limit $:
A.M. Best Rating:
**END OF QUESTIONAIRE**
Denial of Pre-Qualification
A Prospective Bidder who is denied pre-qualification may appeal the City for reconsideration as follows:
Upon request of the Prospective Bidder, the public entity shall provide notification to the
Prospective Bidder in writing of the basis for the Prospective Bidder's disqualification and any supporting
evidence that has been received from others or derived as a result of examinations by the City.
The Prospective Bidder shall be given five (5) calendar days to rebut any evidence used as a
basis for disqualification and to present written evidence to the City as to why the Prospective Bidder
should be found qualified.
The Prospective Bidder may request in writing, with the submission of written rebuttal in
paragraph 4 above, to request an informal hearing with the Public Works Superintendent. The Public
Works Superintendent will consider all evidence presented and render a determination on the disposition
of the Prospective Bidder's pre-qualification status. The Public Works Superintendent's determination on
the appeal will be final.
If the Prospective Bidder chooses not to avail itself of this process, the proposed prequalification
rating and/or score will be adopted without further proceedings.