Loading...
HomeMy WebLinkAbout12- Development Services ORIGINAL CITY OF SAN BERNARDINO -REQUEST FOR COUNCIL ACTION From: Valerie C. Ross, Director Subject: Authorize the Director of Development Services to execute Dept: Development Services Contract Change Order No. One with Weka, Inc. for Sanitary Sewer Date: January 6, 2010 Improvement Relocations for I-215 Freeway Widening, Segments 1, 2 and File Nos. 3.7848-1; 3.7848-2; 5 (SW09-03), per Project Plan No. 3.7848-5 12574. MCC Date: February 16, 2010 Synopsis of Previous Council Action: 07-06-09 The Mayor and Common Council signed Cooperative Agreement with San Bernardino County Transportation Authority (SANBAG) for I-215 Freeway Widening Segments 1, 2 and 5 Sewer Relocation Design Work. 07-06-09 The Mayor and Common Council adopted a Resolution awarding a contract to Weka, Inc. for Sewer and Street Improvements(SW09-03). 03-16-09 The Mayor and Common Council signed Utility Agreements with Caltrans for sewer relocations reimbursement related to the I-215 Freeway Widening Project. Recommended Motion: Authorize the Director of Development Services to execute Contract Change Order No. One with Weka, Inc. for the Sanitary Sewer Improvement Relocations for the I-215 Freeway Widening, Segments 1, 2 and 5 (SW09-03),per Project Plan No. 12574. Y&V G. Valerie C. Ross Contact Person: Robert Eisenbeisz, City Engineer Phone: Ext. 5203 Supporting data attached: Staff Report& CCO No. One Ward: 1,2,6 FUNDING REQUIREMENTS: Amount: $212.896.00 Source: (Acct.Nos.) 242-362-5504-7848 Acct. Description: Caltrans Reimbursement Finance: Agenda Item No. 2-Il1-IU CITY OF SAN BERNARDINO — REOUEST FOR COUNCIL ACTION STAFF REPORT Subject: Authorize the Director of Development Services to execute Contract Change Order No. One with Weka, Inc. for Sanitary Sewer Improvement Relocations for the I-215 Freeway Widening, Segments 1, 2 and 5 (SW09-03)per Project Plan No. 12574. Background: In March of 2009, the California Department of Transportation (Caltrans) and the City of San Bernardino entered into Utility Agreements as part of the realignment and widening of the I-215 Freeway. The agreement, which required Caltrans to reimburse the City for all engineering, inspection and construction costs associated with the relocation of conflicting sewer facilities within Segments No. 1 and No. 2, was signed by the Mayor on March 16, 2009. A similar Utility Agreement between Caltrans and the City for sewer relocations relative to Segment No. 5 was also signed by the Mayor on March 16, 2009. The sewer relocation project involves the following three freeway segments: • Segment No. 1 between Rialto Avenue and 8t' Street, which includes City sewer relocations at 2"d Street, Main Street, 3rd Street, Kingman Street, alley north of 5th Street, Spruce Street, Victoria Street, 7th Street, and 8d' Street. This has been identified as Phase 3 of the freeway improvements. • Segment No. 2 between 8t' Street and Massachusetts Avenue, which includes City sewer relocations at Temple Street, IOth Street, Olive Street, I Ith Street, Orange Street, Baseline Street, Virginia Street, and 17th Street. This has been identified as Phase 3 of the freeway improvements. • Segment No. 5 between Massachusetts Avenue at 19t Street, which includes City sewer relocation at Massachusetts Avenue. This has been identified as Phase 4 of the freeway improvements. On July 6, 2009, the Mayor and Common Council approved a Resolution to award a contract to Weka, Inc. for construction of Sanitary Sewer Improvement Relocations for State Route 215, Segments 1, 2 & 5 (SW09-03), per Project Plan No. 12574. Under the utility agreements, Caltrans will reimburse the City for all associated costs with the relocation of conflicting sewers regarding the I-215 Freeway Widening project up to $4,204,275.00 for Segments No. 1 and No. 2 and up to $286,418 for Segement No. 5, both of which reflect the estimated cost of construction with contingencies based upon the approved plans and specifications. In addition to this contract there were two other contracts awarded for sewer relocation work. All contracts related to this project are below the estimated cost of construction. 2 CITY OF SAN BERNARDINO — REQUEST FOR COUNCIL ACTION STAFF REPORT - Continued Construction Change Order No. One: During construction of the sanitary sewer improvement relocations for State Route 215, Segments 1, 2 and 5, the contractor was directed to complete additional work and/or encountered unforeseen conditions, such as discovery of abandoned railroad ties buried in the existing roadways, discovery of unsuitable material in 11 th Street, Olive Street, Kingman Street, Orange Street, Spruce Street and others that had to be removed and disposed of, removal and replacement of sewer line, storm drain line, relocation of undocumented conflicting utilities, and other tasks including additional survey, and design revisions adjusting sewer alignment per the field condition. These additional tasks were not identified on the plans prepared by Caltrans or included in the contractor's original bid. The descriptions and justification of these items are detailed in the attached copy of Contract Change Order No. One. Financial Impact: The revised estimated project costs are as follows: TOTAL Original Contract Amount $1,364,058.00 Contract Change Order No. One $ 212,896.00 Total Project Cost $1,576,954.00 This change order represents a net increase of 15.6% of the original contract amount. Sufficient funds are available in Acct. No. 242-362-5504-7848. Caltrans will reimburse the total cost of the project, including change orders, upon completion of the work. Recommendation: Authorize the Director of Development Services to execute Contract Change Order No. One with Weka, Inc. for the Sanitary Sewer Improvement Relocations for the I-215 Freeway Widening, Segments 1, 2 and 5 (SW09-03), per Project Plan No. 12574. Attachments: Change Order No. One 3 DEVELOPMENT SERVICES DEPARTMENT 300 North"D"Street•San Bernardino•CA 92418-0001 ��, Planning&Building 909.384.5057•Fax: 909.384.5080 San Bel�ndr�ino Public Works/Engineering 909.384.5111 •Fax: 909.384.5155 www.sbcity.org CONTRACT CHANGE ORDER NO. ONE FILE NO. 3.7848 W.O. NO. 7848 DATE: FEBRUARY 16,2010 PROJECT: SANITARY SEWER IMPROVEMENT RELOCATIONS FOR STATE ROUTE 215, SEGMENTS 1, 2 AND 5 (SW09-03), PER PROJECT PLAN NO. 12574 TO: WEKA,INC. 826 BROOKSIDE AVENUE,STE. G REDLANDS,CA 92373 GENTLEMEN: You are hereby compensated for performing the additional work as follows: ITEM NO: DESCRIPTION OF CHANGE COST 1-1 Remove and Recondition Unsuitable Material and Recompact it $ 105,333.25 between August 24,2009 and October 7,2009 on Various Streets 1-2 Sawcut and Remove Pipe within Caltrans' Right-of-Way $ 4,591.20 1-3 Remove and Replace Sewer Laterals $ 11,178.23 1-4 Extra Work on Virginia Street to Remove Asphalt Concrete around $ 6,990.39 Two New Manholes 1-5 Remove Unknown Utilities on 2nd Street $ 14,658.48 1-6 Remove Unknown/Abandoned Railroad Ties on Various Streets $ 5,328.03 1-7 Design Changes on Spruce Street due to Utility Conflict $ 53,188.74 1-8 Potholing for Sewer Line on Kingman Street $ 1,488.95 1-9 Sanitary Sewer Improvement Relocations for the I-215 Freeway $ 3,945.61 Widening, Segment 5 1-10 Relocate Fences to Caltrans' Right-of-Way, since there is no $ 6,193.12 Construction Easement Secured for the Project along Basline TOTAL COST CCO#1 $ 212,896.00 CHANGE ORDER NO.ONE—WEKA,Inc. SANITARY SEWER IMPROVEMENT RELOCATIONS FOR STATE ROUTE-215 SEGMENTS 1,2&5,PER PROJECT PLAN No. 12574 JUSTIFICATION: Remove and Recondition Unsuitable Material and Recompact it between August 24,2009 and October 7,2009 on Various Streets The contractor was required to rc-excavate and recondition unsuitable materials on Item 1-1 Virginia Street Orange Street, 11th Street, Olive Street, 10d' Street, Temple Street 8d' No, Street, Vine Street, 7d' Street, Victoria Street, Spruce Street, Kingman Street, 3rd Street, Main Street and 2"d Street in order to meet the compaction requirements since the materials were too saturated with moisture. Sawcut and Remove 5 feet of Moe within Caltrans'Right-of-Way 1-2 The contractor was required to sawcut and remove an additional 5 feet of pipe to clear Caltrans' right-of-way at several locations. Remove and Replace Sewer Laterals The contractor was required to remove and replace existing sewer laterals not shown on 1-3 the approved plans on 8d' Street and l e Street. In addition,the contractor was directed to video the above sewer laterals, which were not a part of the original contract bid item. Extra Work on Virginia Street to Remove Asphalt Concrete around Two New Manholes 1-4 The contractor was required to remove existing asphalt around manholes and replace it with 6" thick Portland cement concrete on Virginia Street. This additional work was not included in the original contract bid item. Remove Unknown Utilities on 2° Street The contractor was required to cut and remove an unknown 4"steel structure around an 1-5 8"sewer main. In addition,the contractor was directed to stand by due to the unknown 1"and 2"steel structures on 2nd Street not shown on the approved plans. Remove Unknown/Abandoned Railroad Ties on Various Streets During construction, it was discovered that there were unknown/abandoned railroad tics 1-6 approximately F deep spaced 3' feet apart on Yd Street and Kingman Street that needed to be disposed of This additional work was not shown on the approved plans and not a art of the original contract bid item. Design Changes on Spruce Street due to Utility Conflict During construction, it was discovered that there were conflicts between an existing 3" gas line, a %" water service line, an unmarked 11/2" electrical conduit and a 2" steel structure; and the proposed 24"jack and bore sewer line on Spruce Street. The gas line 1-7 crossed over the center of the proposed sewer line. The contractor was directed to pothole said utilities while the design engineer was looking into an alternative alignment of the proposed sewer and bore pit location. In addition, it was necessary for the contractor to standby for the design changes and wait for an approval from Caltrans at the same time. These changes were not originally anticipated and were not included in the original contract bid. Potholing for Sewer Line on Kingman Street 1-8 The contractor was directed to pothole the existing sewer line on Kingman Street,which was not shown on the approved plans. In addition, this additional work was not included in the original contract bid item. Sanitary Sewer Improvement Relocations for the 1-215 Freeway Widening, 1-9 Segment 5 During construction, it was discovered that an existing 4" sewer line collapsed and had to removed and replaced due to void. Relocate Fences to Caltrans' Right-of-Wav, since there is no Construction 1-10 Easement Secured for the Project along Baseline The contractor was required to relocate the fences outside the unsecured construction easement,which had not yet been acquired for the project. 2 CHANGE ORDER NO.ONE—WEKA,Inc. SANITARY SEWER IMPROVEMENT RELOCATIONS FOR STATE ROUTE-215 SEGMENTS 1,2&5,PER PROJECT PLAN No. 12574 SUMMARY OF CONTRACT COSTS The estimated revised contract cost is as follows: Original Bid Amount. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........................$ 1,364,058.00 Contract Change Order No.One . . . . . . . . . . . . . . . . . . . . . . . . . . . . .....................$ 212.896.00 Revised Construction Contract Cost. . . . . . . . . . . . . . . . . . . . . . . . . . ....................$ 1,5769954.00 Additional time to complete Contract due to this Change Order..........................30 Working Days This change order represents 15.61 %of the original contract amount. WEKA,INC. CITY OF SAN BERNARDINO CONTRACTOR DEVELOPMENT SERVICES Accepted Approved By: By: VALERIE C.ROSS Title: Director of Development Services Date: Date: Approved By: CHARLES E.McNEELY City Manager Date: February 16, 2010 Item No. 3 DEVELOPMENT SERVICES DEPATMNTT y. . C a F U 300 North"D"Street•San Bernardino•CA 92418-0001 Planning&Building 909.384.5057•Fax: 909.384.5080 San Bernar ino Public Works/Engineering 909.3845111 •Fax: 909.384.5155 www.sbcity.org CONTRACT CHANGE ORDER NO. ONE FILE NO. 3.7848 W.O. NO. 7848 DATE: FEBRUARY 16,2010 PROJECT: SANITARY SEWER IMPROVEMENT RELOCATIONS FOR STATE ROUTE 215, SEGMENTS 1, 2 AND 5 (SW09-03), PER PROJECT PLAN NO. 12574 TO: WEKA,INC. 826 BROOKSIDE AVENUE,STE. G REDLANDS,CA 92373 GENTLEMEN: You are hereby compensated for performing the additional work as follows: ITEM NO: DESCRIPTION OF CHANGE COST 1-1 Remove and Recondition Unsuitable Material and Recompact it $ 105,333.25 between August 24,2009 and October 7,2009 on Various Streets 1-2 Sawcut and Remove Pipe within Caltrans' Right-of-Way $ 4,591.20 1-3 Remove and Replace Sewer Laterals $ 11,178.23 14 Extra Work on Virginia Street to Remove Asphalt Concrete around $ 6,99039 Two New Manholes 1-5 Remove Unknown Utilities on 2"d Street $ 14,658.48 1-6 Remove Unknown/Abandoned Railroad Ties on Various Streets $ 5,328.03 1-7 Design Changes on Spruce Street due to Utility Conflict $ 53,188.74 1-8 Potholing for Sewer Line on Kingman Street $ 1,488.95 1-9 Sanitary Sewer Improvement Relocations for the I-215 Freeway $ 3,945.61 Widening, Segment 5 1-10 Relocate Fences to Caltrans' Right-of-Way, since there is no Construction Easement Secured for the Project along Basline $ 6,193.12 TOTAL COST CCO#1 $ 212,896.00 CHANGE ORDER NO.ONE—WEKA,Inc. SANITARY SEWER IMPROVEMENT RELOCATIONS FOR STATE ROUTE-215 SEGMENTS 1,2&5,PER PROJECT PLAN No. 12574 JUSTIFICATION: Remove and Recondition Unsuitable Material and Recompact it between August 24,2009 and October 7,2009 on Various Streets The contractor was required to re-excavate and recondition unsuitable materials on Item 1-1 Virginia Street, Oranr Street, Il'h Street, Olive Street, 10th Street, Temple Street, 8h No. Street, Vine Street, 7 Street, Victoria Street, Spruce Street, Kingman Street, 3`d Street, Main Street and 2nd Street in order to meet the compaction requirements since the materials were too saturated with moisture. Sawcut and Remove 5 feet of Pipe within Caltrans'Right-of-Way 1-2 The contractor was required to sawcut and remove an additional 5 feet of pipe to clear Caltrans' right-of-way at several locations. Remove and Replace Sewer Laterals The contractor was required to remove and replace existing sewer laterals not shown on 1-3 the approved plans on 8th Street and 10'h Street. In addition,the contractor was directed to video the above sewer laterals, which were not a part of the original contract bid item. Extra Work on Virginia Street to Remove Asphalt Concrete around Two New Manholes 1-4 The contractor was required to remove existing asphalt around manholes and replace it with 6" thick Portland cement concrete on Virginia Street. This additional work was not included in the original contract bid item. Remove Unknown Utilities on 2°d Street 1-5 The contractor was required to cut and remove an unknown 4"steel structure around an 8 sewer main. In addition,the contractor was directed to stand by due to the unknown 1"and 2"steel structures on 2"d Street not shown on the approved plans. Remove Unknown/Abandoned Railroad Ties on Various Streets During construction, it was discovered that there were unknown/abandoned railroad ties 1-6 approximately P deep spaced 3' feet apart on 3`d Street and Kingman Street that needed to be disposed of This additional work was not shown on the approved plans and not a art of the original contract bid item. Desien Changes on Spruce Street due to Utility Conflict During construction, it was discovered that there were conflicts between an existing 3" gas line, a %" water service line, an unmarked 1'/2" electrical conduit and a 2" steel structure; and the proposed 24"jack and bore sewer line on Spruce Street. The gas line 1-7 crossed over the center of the proposed sewer line. The contractor was directed to pothole said utilities while the design engineer was looking into an alternative alignment of the proposed sewer and bore pit location. In addition, it was necessary for the contractor to standby for the design changes and wait for an approval from Caltrans at the same time. These changes were not originally anticipated and were not included in the original contract bid. Potholing for Sewer Line on Kingman Street 1-8 The contractor was directed to pothole the existing sewer line on Kingman Street,which was not shown on the approved plans. In addition, this additional work was not included in the original contract bid item. Sanitary Sewer Improvement Relocations for the 1-215 Freeway Widening, Segment 5 1-9 During construction, it was discovered that an existing 4" sewer line collapsed and had to removed and replaced due to void. Relocate Fences to Caltrans' Right-of-Way, since there is no Construction 1-10 Easement Secured for the Project along Baseline The contractor was required to relocate the fences outside the unsecured construction easement,which had not yet been acquired for the project. 2 CHANGE ORDER NO.ONE—WEKA,Inc. SANITARY SEWER IMPROVEMENT RELOCATIONS FOR STATE ROUTE-215 SEGMENTS 1,2&5,PER PROJECT PLAN No. 12574 SUMMARY OF CONTRACT COSTS The estimated revised contract cost is as follows: Original Bid Amount. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........................$ 1,364,058.00 Contract Change Order No.One . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....................$ 212.896.00 Revised Construction Contract Cost . 195769954.00 Additional time to complete Contract due to this Change Order..........................30 Working Days This change order represents 15.61 %of the original contract amount. WEKA,INC. CITY OF SAN BERNARDINO CONTRACTOR DEVELOPMENT SERVICES Accepted/ By: Approved By: G VALERIE C. ROSS Title: Director of Development Services Date: Z9/0 Date: 2 l0 Approved By: LIRA E. MiLNUVY City Manager Date: February 16,2010 Item No. 12 3