Loading...
HomeMy WebLinkAbout08.I- Public Works RESOLUTION (ID# 1865) DOC ID: 1865 CITY OF SAN BERNARDINO—REQUEST FOR COUNCIL ACTION Agreement/Contract From: Jim Smith M/CC Meeting Date: 07/16/2012 Prepared by: Michael Grubbs, (909) 384- 5140 Dept: Public Works Ward(s): All Subject: Resolution of the Mayor and Common Council of the City of San Bernardino Approving an Agreement with the California Department of Transportation (Caltrans) for Sharing Cost of State Highway Electrical Facilities. Financial Impact: The annual cost associated with this agreement is estltimated not to exceed$1,500 and will be paid from the City's existing annual electrical maintenance budget. Motion: Adopt Resolution. Synopsis of Previous Council Action: 01/01/84 Agreement approved by Resolution No. 1984-058 with Caltrans for cost sharing of State Highway Electrical Facilities became effective. Backeround: Effective January 1, 1984, the Mayor and Common Council adopted Resolution No. 1984-058, approving an Agreement with Caltrans for sharing cost of State Highway Electrical Facilities. This Agreement has, for many years,been the Master Agreement with Caltrans detailing how the cost of maintaining electrical equipment installed, owned and maintained by Caltrans on State Highways will be apportioned between Caltrans and the City. In most cases, the electrical equipment consists of traffic signals and safety lighting improvements on State Highways, which intersect City Streets. Caltrans plans to construct new traffic signals for the ramps on I-215 at Palm Avenue interconnected with Kendall Drive. Prior to proceeding with construction, an agreement for maintenance and electrical energy-cost sharing with the City is required. Under terms of the Agreement, Caltrans will install the signals at no cost to the City. Caltrans will be responsible for the operation of the signals while the maintenance and electrical energy costs will be shared on a 50150 basis between the City and Caltrans. Packet Pg. 928 8.1 1865 The list of electrical equipment covered by this Master Agreement is shown in Exhibit A, attached to the Agreement. From time to time, electrical equipment is added to Exhibit A by way of a"Cost Distribution Agreement for Traffic Signals and Lighting." Attached is a copy of the Cost Distribution Agreement for Traffic Signals and Lighting, defining the cost sharing responsibilities for the new signals at the intersection of the I-215 ramps with Palm Avenue and Kendall Drive,marked Attachment`B." Staff is requesting approval of the Master Agreement with Caltrans for sharing cost of State Highway Electrical Facilities, which is attached hereto and marked as Attachment "A" and that the Director of Public Works be authorized to execute the agreement for "Cost Distribution for Traffic Signals and Lighting" (Attachment `B") with Caltrans. Also, it is requested that the Director of Public Works be authorized to execute future amendments to"Cost Distribution for Traffic Signals and Lighting"with Caltrans when new shared electrical equipment is added to or removed from the inventory. City Attorney Review: Suaoortine Documents: Resolution (DOC) Attachment A Master Agreement (PDF) Attach B Rte215@ PahnAvenueKendalldriveCityofSB50-1 (DOC) Attachment Rl Existing Electrical Maint Agreement (PDF) O PacketPg. 929 8.I.a 1 RESOLUTION NO. 2 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO APPROVING AN AGREEMENT FOR SHARING COST OF 3 CALTRANS HIGHWAY ELECTRICAL FACILITIES. 4 WHEREAS, effective January 1, 1984, the Mayor and Common Council approved a m 5 "Master" Agreement for Sharing Cost of State Highway electrical facilities with the c California Department of Transportation (CALTRANS), a copy of which is attached hereto as 'c 6 Reference Attachment"Rl'; and W WHEREAS, CALTRANS has requested approval of a new "Master" Agreement for d 8 sharing cost of State highway electrical facilities, attached hereto as Attachment "A" and w made a part hereof, to be effective as of the date of approval by the Mayor and Common o 9 Council and to remain in effect until amended or terminated; and U c m 10 C WHEREAS, CALTRANS is also requesting that the City approve a "Cost 11 Distribution Agreement for Traffic Signals and Lighting" specifically for two new traffic signals to be installed by CALTRANS at no cost to the City at the intersection of the I-215 12 Freeway ramps with Palm Avenue and Kendall Drive, said Agreement being attached hereto as Attachment`B" and made a part hereof; and w 13 0 14 WHEREAS, the City has determined that participation in these cost sharing c Agreements is in the best interest of the City. R 15 16 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE r CITY OF SAN BERNARDINO AS FOLLOWS: E 17 SECTION 1. The City Manager is hereby authorized and directed to execute said E 18 Attachment"A"on behalf of the City. 19 20 SECTION 2. The Director of Public Works is hereby authorized and directed to to 21 execute said Attachment"B"on behalf of the City. o 22 SECTION 3. The Director of Public Works is further authorized to execute future N d 23 submittals of"Cost Distribution Agreement for Traffic Signals and Lighting" on behalf of the d 24 s City when new signals or electrical equipment requiring maintenance are added to the 25 a 26 inventory and the City is obligated to pay its fair share of maintenance and electrical costs. 27 SECTION 4. The authorization to execute the above-referenced Agreement is 28 rescinded, if it is not executed within ninety(90) days of the passage of this resolution. PacketPg. 930 8.I.a 1 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO APPROVING AN AGREEMENT FOR SHARING COST OF 2 CALTRANS HIGHWAY ELECTRICAL FACILITIES. 3 I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor 4 and Common Council of the City of San Bernardino at a meeting d 5 a thereof,held on the_day of 2012, by the following vote, to wit: 6 w 7 Council Members: AYES NAYS ABSTAIN ABSENT v d 8 MARQUEZ w `o 9 JENKINS 10 VALDIVIA c 11 12 SHORETT d r 13 KELLEY `o w 14 JOHNSON 15 MCCAMMACK 16 3 17 18 Georgeann Hanna, City Clerk v m rn 19 The foregoing resolution is hereby approved this day of 2012. a 20 21 2 Patrick J. Moms, Mayor S 22 City of San Bernardino 0 m 23 Approved as to form: JAMES F. PENMAN, d 24 City Attorney r U 25 By: a 26 27 Packet Pg.931 8.I.b ATTACHMENT "A" AGREEMENT FOR SHARING COST OF CALTRANS HIGHWAY ELECTRICAL FACILITIES WITH CITY OF SAN BERNARDINO THIS AGREEMENT is made effective this day of , 2012, by and between v the CALTRANS of California, acting by and through the Department of Transportation also E known as Caltrans, hereinafter referred to as "CALTRANS", and the CITY of SAN -, BERNARDINO, hereinafter referred to as CITY. w m v I. This Agreement shall supersede any previous Agreement and/or Amendments thereto for sharing Caltrans-incurred costs with the CITY. w w 0 II. The cost of operating and maintaining flashing beacons, traffic signals, traffic signal systems, safety lighting, and sign lighting now in place at the intersection of any CALTRANS Highway Route and any CITY street shall be shared as shown in d Exhibit"A"attached hereto and made a part hereof. m III. Basis for Billing: m R r A. It is agreed that monthly billings for flashing beacons, traffic signals, and traffic signal systems shall be based on actual intersection costs,which are as follows: w c m • Maintenance - Labor,including overhead assessment - Other expenses - Equipment 3 c - Materials E - Miscellaneous expenses rn • Electrical energy LO to m B. It is agreed that monthly billings for safety lighting and sign lighting shall be based on calculated unit costs derived by averaging CALTRANS's District-wide costs each month. Costs are as follows: E d m • Maintenance ¢ - Labor,including overhead assessment d - Other expenses - Equipment ¢ - Materials c - Miscellaneous expenses E E U • Electrical energy a C. It is agreed that monthly billings invoiced to CITY for CALTRANS-owned and maintained electrical facilities identified in Exhibit "A" will be based on actual r v costs paid by CALTRANS, when derived from utility company billings. x CALTRANS will bill CITY monthly in arrears for any CITY share of electrical ¢ facilities expenses shown in Exhibit"A". I Papket P'g:932 ATTACHMENT "A" IV. Exhibit "A" will be amended, as necessary by written concurrence of both parties, to reflect changes to the system. V. CALTRANS costs and expenses assumed under the terms of this Agreement are conditioned upon the passage of the annual CALTRANS of California Budget by the z Legislature, the allocation of funding by the California Transportation Commission as E appropriate, and the encumbrance of funding to the District Office of CALTRANS to 5 pay the billings by CITY. w m U VI. This Agreement shall remain in full-force and effect until amended by the mutual consent of the parties or terminated by either party upon thirty (30) days'notice to the d other party. w 0 d U VII. Neither CITY nor any officer or employee thereof is responsible for any injury damage or liability occurring by reason of anything done or omitted to be done by v CALTRANS under or in connection with any work, authority or jurisdiction arising under this Agreement. It is understood and agreed that CALTRANS shall fully defend, indemnify and save harmless the CITY and all of its officers and employees 0 from all claims, suits or actions of every name, kind and description brought forth r under, including, but not limited to, tortious, contractual, inverse condemnation and other theories or assertions of liability occurring by reason of anything done or omitted to be done by CALTRANS under this Agreement with the exception of those actions of CALTRANS necessary to cure a noticed default on the part of CITY. U VIII. Neither CALTRANS nor any officer or employee thereof is responsible for any injury, damage or liability occurring by reason of anything done or omitted to be done 3 by CITY under or in connection with any work, authority or jurisdiction arising under this Agreement. It is understood and agreed that CITY shall fully defend, indemnify and save harmless CALTRANS and all of its officers and employees from all claims, suits or actions of every name, kind and description brought forth under, including, but not limited to, tortious, contractual, inverse condemnation or other theories or assertions of liability occurring by reason of anything done or omitted to be done by CITY under this Agreement. d E IX. Labor Code Compliance: Prevailing Wages d rn a If the work performed on this Project is done under contract and falls within the Labor Code section 1720(a)(1) definition of a "public work" in that it is construction, alteration, demolition, installation, repair or maintenance CITY must conform to the provisions of Labor Code sections 1720 through 1815, all applicable regulations and a coverage determinations issued by the Director of Industrial Relations. CITY agrees to include prevailing wage requirements in its contracts for public work. Work performed by CITY'S own forces is exempt from the Labor Code's prevailing wage M requirements. a X. Prevailing Wage Requirements in Subcontracts E U U A CITY shall require its contractors to include prevailing wage requirements in all a subcontracts funded by the Agreement when the work to be performed by the subcontractor is a "public work" as defined in Labor Code Section 1720(a)(1). 2 Packet Pg. 933 ATTACHMENT "A" Subcontracts shall include all Prevailing Wage requirements set forth in CITY'S contracts. The PARTIES are empowered by Street and Highways Code Section 114 & 130 to enter into this Agreement and has delegated to the undersigned the authority to execute this c Agreement on behalf of the respective agencies and covenants to have followed all the E necessary legal requirements to validly execute this Agreement. 6 W R IN WITNESS WHEREOF,the parties hereto have set their hands and seals the day and year first above written. 5 W 46 THE CITY OF SAN BERNARDINO CALTRANS OF CALIFORNIA w u C DEPARTMENT OF TRANSPORTATION c W c By: By: m CITY Manager MALCOLM DOUGHERTY t Director of Transportation 0 w r c N By: Deputy District Director Maintenance L Approved as to Form: N By: By: CITY Attorney **Attorney Department of Transportation m r **Approval by CALTRANS'SAttorney is not required unless changes are made to this form, in E which case, the draft will be submitted to Headquarters for review and approval by d CALTRANS's Attorney as to form and procedures. a d a R Q c m E t U A Q r C d E t U A Q 3 8.Lb ATTACHMENT "A" Exhibit A d TRAFFIC SIGNAL AND LIGHTING AGREEMENT p, Caltrana and City of See Bernardino '2 Effective July 1,2011 Q W BASIS OF COST DISTRIBUTION a State-Owned and Maintained Billed by the State y W w O COST m SIGNAL SAFETY ILLUMINATED DISTRIBUTION S4 MM ESL LOCATION FA LIGHTS UNITS SIGNS UNITS STATE CDY % C m 1 10 24.800 HUMPS LANE S 5. 70w BPS 50 2 10 25.100 CLUB CENTER DRIVE, 0003 3-20OW UPS 1.3 3-IIOW MR 6.0 So 50 WIN OFF RAMP m m 3 10 25.300 WATERMAN AVENUE OC 10- 7OW MPS 5.0 = SO 50 t) 5-200w RPS 25 50 50 L O 4 10 25.4011 CARNEGIE DRIVE, 0013 4-20OW BPS 2.0 t- SSW SNA 1.0 25 75 w N W/B OFF RAMP 1-110W SNR 2.0 25 75 1- 75W SNC 1.0 25 75 L 1-150W SND 2.0 25 75 U 5 18 6.100 ROUTE 210 EN RAMPS, 0218 2-200W MPS 1.0 75 25 ,s.. WATERMAN AVENUE 3 6 18 6.240 30i0 STRF.ETtLEROY STREET 0220 3-200W HPS 1.5 50 50 c 1-310w HPS 1.0 N SD 50 E 7 18 6.400 MARSHALL BOULEVARD 0221 3-200W MPS 1,5 50 50 m 8 18 7.100 PARKDALE DRIVE 0222 2-20OW MPS 1,0 50 50 Q 9 18 7.210 30 STRM 0223 2-20OW BPS 1.0 66.7 33.3 � m 10 18 7.550 40m STREET 0224 - 4-20OW HPS 2.0 50 50 `- 11 18 7.700 44i0 STREET PLASHER 03M So 5o N 12 66 10390 MERHIIAN AVENUE 0260 3-20OW HIS 1.5 50 50 40j 13 66 20.900 MACYNTRSET 0259 2-280W BPS I.0 2-SSW SNA 2.0 647 33.3 Q L 14 66 21A00 4i°3TREC1' 0255 5-200W MPS 25 66.7 333 N N IS 66 21.889 MEDICAL CEarM DRIVE 10 0257 4206W HPS 2.0 66.7 333 16 66 22.080 CABRERAAVENUE 0256 4-20OW HPS 2.0 100 17 66 22A75 MOUNT VERNON AVENUE 0255 4-200W BPS 2.0 4- SSW SNA 4.0 50 50 m 18 66 22.690 L STREET L 82554 2-200W HPS LO 66.7 33.3 19 66 23.156 4"'SPREEC AT H STREET 0357 3.40OW MV 3.0 5o SO a 20 66 23.285 510 STREET AT B STREET 1184 4-200W MPS 2.0 75 15 c 6 21 66 23.408 67 STREET AT H MWEr r 0253 4.200W IH'S 2.0 50 SO s V 22 210 21.300 MACY STRELT,WMI »@. oz39 2-20Ow UPS 1.o so so 4 1 Packet Pg. 9 55 8.I.b ATTACHMENT "A" Exhibit A (continued) c m TRAFFIC SIGNAL AND LIGHTING AGREEMENT E a Cal[rsa0 and City of Sea Bernardino Effective Jnly 1,TOIL w BASIS OF COST DISTRIBUTION v State-Oweed add Maintained Haled by the State m W SIGNAL SAFETY ILLUMNATED DISTRIBUTION N cow No. ROUTE p=R, LOCATION �1 LIGHTS Mrs SIGNS UIBfS STATE CITY % c 23 210 21.500 STATESTRF,ET--check 0240 2-200W HP3 1.0 62.5 37.5 c 24 210 21.000 CALIFORNIA STREET"*check 0241 2-20OWQPS 1.0 62.5 37.5 25 210 22.925 H STREET W/B RAMP OW 2-310W HPS 2.0 1-110 W SNB 2.0 50 50 m 26 210 22927 HSTREET FJB RAMP 0182 2-31OW UPS 2.0 1-110WSNB 2.0 50 SU to 27 210 23.330 E STREET lJ8 OFF RAMP 0130 2-2 W W HPS 1.0 66.7 33.3 w 28 210 z5.200 GOLDEN AVENUE N 4-25OW MV 4,0 IOU m 29 210 25.615 DEL ROSA AVENUE FJB RAMPS 0215 4- 70W UPS 2.0 100 R 2-20OW HPS 1.0 50 50 U .L 30 210 25.616 DEL ROSA AVENUE WB RAMPS 0216 2-200W HPS 1.0 50 50 '3 31 210 26.524 HIGHLAND AVENUE, 0212 2-2UOW IIPS 1.0 50 50 C I:/B OFF RAMP N E 32 210 26.644 MG HLAND AVENUE, 0210 4-200W HPS M 2.0 50 50 W/B ON RAP Q 33 210 27A45 ARDEN AVENUE, 0569 2-20Owll7`$ lA 5o 50 FJB ON RAMP W) m 34 210 27A63 HIGHLAND AVENUE, wB OFF RAMP 0567 4-20OW HPS 2.0 50 50 c 35 215 5.000 ORANGE SHOW ROAD,N/H 0193 3-200W HPS 15 50 50 E d 36 215 5.020 ORANGE SHOW ROAD 5-20OW HPS 2.5 50 5o T 37 215 5.100 ORANGE SHOWROAD,&B 0192 3-200W UPS IS Q 50 50 � 38 213 5.501 INLAND CENTF.I1 DRIVE,NB 1159 50 w A 39 215 558E INLAND CENTER D R><'Fi SID 1153 2-310W HPS 2.0 50 50 Q 40 215 5900 MILL STREET NIB OFF RAMP 2-200W BPS 7.0 50 511 O 41 215 6.070 MILL STREET,SIB OFF RAMP 2-20OW HPS 1.0 50 50 .0 U 42 213 6.630 RIALTO AVENUE UC 4. 70W HPS 2,0 mp 16 43 215 6.787 2"O STREET,SIB Q 0202 3.20OW IIPS 1.5 50 50 44 215 6" 2'm STREET,NB c 8201 5-200W HPS 25 4) 50 50 E t 43 215 7AW IWW STREET,NB ON RAMP 1-20OW UPS .5 33.3 66.1 Q 2 Packet Pg. 936 B.I.b ATTACHMENT `°A" oExhibit A (continued) TRAFFIC SIGNAL AND LIGHTING AGREEMENT C W&ns and City of San Bernardino E FTledlve duly 1,2011 '3 U w BASIS OF COST'DWRIBUTION SINWOW—ned and Maintained v Billed by the State u d w SIGNAL SAFETY COST ILLUMINATED DISTRIBUTION o All ROUTE EX LOCATION E8 LIGHTS UNBS SIGNS UNITS STATE CITY v ova c 46 215 8.000 ORANGE SIREET,SiB ON RAMP 1-200W HPS 5 50 50 c 47 215 9.720 27'"SIRELrI• 5-IOOWHPS 25 50 50 m 4-310W HPS 4.0 50 50 a 48 215 1Lail UNIVMRSrry PARKWAY,WB 0348 2-310WHPS 2.0 4-170WSNB 8.0 50 50 m t 49 215 11.634 UNIVERSITY PARKWAY UC 2. 70W BPS 1.0 100 2- TOW HPS 1.0 50 50 O w 50 215 11.644 UNIVBIBSrry PARKWAY,N/B 0320 2-310W LIPS 2.0 4-110WSNB 8.0 50 50 0 L 51 259 A95 HIGHLAND AVENUE,NB 0249 2.100W WS I.0 50 50 ` 3-200WHPS 1,5 50 50 m U 52 259 •573 HIGHLAND AYSNUF,SB 0248 3-200W HVS 15 50 50 1 53 259 .800 27"S['REB]' 2- 70W HPS 1.0 100 .3 G 54 259 1.040 RSPRRLTUC w 4- TOW BPS 2.0 100 E 55 330 29.540 HIGHLAND AVENUE,N/B 0571 3-280W HPS 15 50 25 01 56 330 29.630 HIGHLAND AVE Q NUE,9/B 0573 3-200W BPS 1S 50 25 .. m c D1Hlty-Owned and Maintained d Baled by the State m O rn SIGNAL SAFETY 8-LUMIRATEO DISTRIBUTION Q COST No. ROUTE P.M.. LOCATION E# LIGHTS UNIT SIGNS UNRS STATE CITY % 1 18 8.046 48" .Mrl r 2400W MV 2.0 66.7 333 Q d E s U m Q c m E z U © a 3 Packet Pg. 937 8.I.c ATTACHMENT"B" Cost Distribution Agreement for Traffic Signals and Lighting EA OM400 Project ID 0800020070 ; m w Project Location: SR 215 Northbound and Southbound Palm Avenue and o Kendall Drive Ramps in the City of San Bernardino. o c m c d Traffic signals and safety lighting will be installed on Route 215 at Palm Avenue. The City of San Bernardino (City) and the California Department of a Transportation (Caltrans) agree to the cost distribution stated below. m s Maintenance and Electrical Enerev Costs S w N C Commencing upon construction and continuing until determined otherwise by ca mutual agreement, City agrees to pay Caltrans for City's proportionate share of the ongoing monthly maintenance and electrical energy costs for the traffic signals and safety lighting at the intersection in accordance with "Agreement 3 for Sharing Cost of State Highway Electrical Facilities with the City of San d Bernardino" as approved by the Mayor and Common Council of City on July 16, 2012. a LO On Route 215 at Palm Avenue City's share is 50% of maintenance and electrical energy costs. Caltrans will pay 50% of maintenance and electrical energy costs. o m Caltrans will own, maintain and operate the traffic signal and lighting system o and pay 100% of the operating costs. d Maintenance. Repair and Replacement of Emergency Vehicle Preemption System o R If installed, all costs for the maintenance repair and replacement of an v Emergency Vehicle Preemption System is the responsibility of City. Y d c When necessary for repair or replacement, Caltrans will test, remove and a' reinstall Preemption System upon notification by the City. a Maintenance and Materials for Internally Illuminated Street Name Signs N d If installed, City agrees to purchase all materials for installation and ongoing maintenance of internally illuminated street name signs, including signs, sign m panels and all hardware. a L U A Q 1 Packet Pg.938 8.I.c ATTACHMENT "B" Cost Distribution Agreement 2 SR 215 at Palm Avenue/Kendall Drive u Page 2 w 0 0 d U C Caltrans agrees to maintain the internally illuminated street name signs. Caltrans will notify City when materials are required for repair and maintenance of the signs. d A copy of Exhibit "A" updated to include the proposed traffic signals and safety lighting improvements on Route 215 at Palm Avenue and Kendall Drive is en attached hereto and made a part hereof. @ At any time City wishes to terminate this agreement, the signs will be replaced with signs of reflective sheeting. .3 i E d d b Approved a I .. City of San Bernardino Caltrans j Agency Agency m I 0 T U d Signature Date Signature Date R v m Y d Director of Public Works Maintenance Manager c' Please Print Name Please Print Name > Q E M IL Return signed copies to: @) N d Caltrans Electrical Maintenance Office z m Attention: Cynthia Ellick r 175 W. Cluster Street o San Bernardino, CA 92408 c v E U U Q 2 Packet P9. 939 ATTACHMENT"Rl" AGREEMENT FOR SHARING COST OF STATE HIGHWAY ELECTRICAL FACILITIES WITH CITY 0 ca c d This AGREEMENT, made and executed in duplicate this let day of w January, 19849 by and between the State of California, acting by ° and through the Department of Transportation, hereinafter referred U to as "STATE" and the CITY of San Bernardino, hereinafter referred as to CITY. d c WITNESSETH: g v d AGREEMENT: M r This agreement shall supersede any previous agreement and/or `o amendments thereto for sharing State incurred costs in the CITY N with the CITY, c m ELECTRICAL FACILITIES s Electrical facilities include flashing beacons, traffic signals, traffic-signal systems, safety lighting, and sign lighting on the c State Highway System. d The cost of operating and maintaining flashing beacons, traffic signals, traffic-signal systems, safety lighting, and sign light- ing now in place at the intersection of any state highway route and any city street shall be shared as shown in Exhibit A. m Basis for billing: E d It is agreed that monthly billings for flashing beacons , m traffic signals, and traffic-signal systems shall be a based on actual intersection costs which are as follows: r o Maintenance m v - Labor including overhead assessment -. Other expenses d w Equipment c • Materials a • Miscellaneous expenses w Electrical energy d It is agreed that monthly billings for safety lighting and E sign lighting shall be based on calculated unit costs derived � by averaging District-wide costs each month. Costs are as Q follows: c d E t d R EXHIBIT "A" a ATTACHMENT"RI" _2- d w w 0 o Maintenance - labor including overhead assessment d - Other expenses • Equipment • Materials ° • Miscellaneous expenses s N Electrical energy N C R It is agreed that monthly billings for utility-owned and , maintained lighting will be based on calculated unit costs L) derived from utility company billings. 3 Exhibit A will be amended as necessary by written concurrence of both parties to reflect changes to the system. E v a This Agreement shall become effective January 1 , 1944, and � shall remain in full force and effect until amended or Q term"%nated. LO co co The Agreement as above may be amended or terminated at any time uaon mutual consent of the parties thereto. This Agreement may also be terminated by either party upon E thirty (30) da;rs ' notice to the other party. m rn c R v •c M V _d W C W X W o: c m E r v a c m E r v a s.t.d ATTACHMENT "Rl" I m U V N IN WITIMS WHEREOF, the parties hereto have set their hands w and seals the day and year first above written. d U CITY OF SAN RNA d .. g c .E r v d L s N ty Clerk R L m U STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION 3 M C E d G7 L a LEO TRO"U ATORE Director of Transportation N co m Approved as to form: m E E m B�*r Q Ci y _tt re r i tr1-t Di c BY U Y U _d W C 41 X W r r C W E r U A z a d E r U z a sa.a EBHIBIT "A" ATTACHMENT "RI" Effective January 1 , 1984 v •2 V d ELECTRICAL FACILITIES OPERATION AND MAINTENANCE w T T o w U C Billed and Maintained by the STATE d c M 2 v Location/ Percent Intersection Cost Distribution L Route Description State City U) SIGNALS -j;-mw M , 18 Marshall Blvd. 50 50 Parkdale 50 50 s 38th Street 66 2/3 33 1/3 3 40th Street 30th & Leroy 50 50 d Waterman & So. Ramp 30 75 25 E 30th & Waterman 100 8 m 30 Lincoln 50 50 a LO Macy Street 50 50 State Street 62 112 37 112 California Street 62 112 37 1/2 Muscott Street Western Avenue 50 50 E Ht. Vernon Avenue 50 50 m Highland Avenue Telemeterin�r 75 25 a Del Rosa Ramps WB 50 50 c Del Rosa Ramps EB 50 50 Highland & Fwy. Off-Ramp 66 2/3 33 1/3 Arden Avenue 50 50 " Victoria Palm Avenue 50 50 y Orange Street ;O 50 w rn 66 Pepper Avenue F7 1/2 12 112 N Placy Street 66 2/3 33 1/3 W 2OG Little Mountain Drive 50 50 w "E" Street & S/Ranp 30 66 213 33 1/3 E 215 27th Street =0 50 v M x y ¢ fob I�p O � Ao ffMrX o .bra r v a B.Ld ATTACHMENT "RI" SIGNAIS - MAINTENANCE ONLY m v . d w Location/ Percent o Intersection Cost Distribution Route Description State City c 30 Highland Avenue at Muscott 50 50 c 30 Highland Avenue at 50 50 Muscupiabe v 66 Foothill Blvd. at 50 50 v Meridian Avenue t 66 Fourth Street 66 2/3 33 1/3 y 66 Fifth Street at Muscott 66 2/3 33 1/3 w 66 Fifth Street at "L" Street 50 50 66 Sixth Street at "H" Street 50 50 66 Cabrera 0 100 ? 66 Mt. Vernon 50 50 206 "E" Street at Marshall Blvd. 50 50 215 SB Freeway: Ramps & 50 50 3 Colton Avenue 215 NB Freeway Ramns & 50 50 E Colton Avenue d L. rn a LIGHTS CD CD Location/ Percent Intersection Cost Distribution Route Description State City E d m 10 Waterman Avenue UC 0 100 rn 1O Waterman Avenue Ramps 50 50 a 2i gill St. i3B Rar..ps at "H" St. 33 i/3 66 2%; 215 Hill St. SB Off-Ramp at 33 1/, 66 2/3 g "T" t S \ L . 215 3ialto Ave. UC O 100 215 Thirteenth St. Ramns 25 %5 v 215 Oran a Show Road Ramps ,O 50 w 215 Orange Shots Road OC 100 rn 215 dill St. B On-Ramps 25 75 r 18 :?arshall �O 5O y 18 Parkdale 50 5O w 18 3^th Street 66 ^/� 43 1/3 18 40th Street 5O 50 18 Leroy St. & 30th Street 50 50 E 18 Frw-r Off-Rai1p at ;0th St. 75 25 t 18 Water-.an at Fwy Off-Ramp. 75 2.5 m° ;0 Macy Street 50 r0 � 30 State Street 62 112 37 1/2 a 70 California Street 62 112 ;`j 1/2 d 30 Western Avenue 50 50 £ 30 Mt. Vernon Ave. 50 50 u 30 Oranse Street 50 50 a M 8;I.d ATTACHMENT I'M" LIGMS (Continued) � i Location/ Percent Intersection Cost Distribution /44(- d Route Description State City --� w w 0 30 Davidson Ave. 66 2/3 33 1/3 30 Lincoln St. 50 50 C, 30 "H" Street Ramps 50 50 v 30 27th Street UC 0 100 30 "F" Street Ramps 25 75 30 Golden Avenue UC 0 100 30 Del Rosa UC 0 100 30 Del Rosa Reaps 50 50 30 Highland & Front Off-Ramps 66 2/3 33 1/3 30 Arden Avenue 50 50 w 30 Victoria Avenue I2�L day 66 Palm Avenue 50 50 " 66 'Pepper Avenue 97 1/2 12 112 66 Cabrera 0 100 66 Foothill Blvd. �;, Meridian 50 50 w 66 Fourth Street �� 66 2/3 33 1/3 66 Firth St. at �1, . 50 50 66 Sixth St. & "E" St. 50 50 E 66 Fit. Vernon Avenue 50 50 d 66 Macy Street 66 2/3 33 1/3 a 206 Frw off-Ramp 66 2/3 33 1/3 •• 206 Little Mountain Drive 50 50 w 30 "H" Street UC 0 100 co Ao4 NFL l� 501 30 d LIGHTS - 7AIITTENAITCE ONLY E d m 66 Fifth & Muscott 33 1/3 66 2/3 a c M v u m W rn c .y W K c d E t U A Q i.; c d E L U R a