HomeMy WebLinkAbout04- Development Department D E V E L O P M E N T D E P A R T M E N T
OF THE CITY OF SAN BERNARDINO
REQUEST FOR COMMISSION/COUNCIL ACTION
From: KENNETH J. HENDERSON Subject: 201 NORTH "E" STREET BUILDING
Executive Director HEATING & AIR CONDITIONING
CONTROLS
Date: May 18, 1993
-------------------------------------------------------------------------------
Svnopsis of Previous Co®ission/Council/Committee Action(s):
None.
-------------------------------------------------------------------------------
Recommended Motion(s):
(Community Development Commission)
MOTION: That the Community Development Commission receive and file
the attached staff report informing the Commission of the
O processing of a purchase order with Ontario Refrigeration
Company in the amount of $15,874 to design and install
heating and air conditioning controls in two second floor
suites of building 201.
0"jAij
Administrator KENNETH J. HEN#ERSON
Executive Director
------------------------------------------------------------------------------
Contact Person(s): Ken Henderson/Gary Clermont Phone: 5081
Project Area(s): Central City Ward(s): N/A
Supporting Data Attached: Staff Report
FUNDING REQUIREMENTS: Amount: $15.874.00 Source: Central City Project
Bond Proceeds
Budget Authority: 7302 (Approved when FY93/94
budget adopted)
-------------------------------------------------------------------------------
COmmission/CO cil Notes:
KJH:GC:aw:0024Q COMMISSION MEETING AGENDA
Meeting Date: 05/24/1993
Agenda Item No: ��
ECONOMIC DEVELOPMENT AGENCY
STAFF REPORT
201 North "E" Street Building - Heating and Air Conditioning Controls
The second floor of the 201 North "E" Street building currently has two
(2) suites occupied by tenants with long term leases. The suites are
occupied by Assemblyman Baca and the San Bernardino International Airport
Authority. When they were improved, the existing heating and air
conditioning controls, ducts and thermostats were left in place.
The existing heating and air condition system was initially designed for
open space offices, and the it is not suitable for the modified suite
improvements that have offices enclosed. Unfortunately, the system is
not balanced, is enclosed, needs to be ducted differently and
redesigned. Because we do not have long-term tenants identified for
other areas of the 2nd floor at the present time, we do not think it is
practical to convert the entire 2nd floor until modifications are made in
conjunction with future leases.
Proposals were solicited to redesign the system and provide necessary
installation and responses were received from two companies as follows:
1. Thiem Mechanical Co. Inc, at $17,374.00
2. Ontario Refrigeration at $15,874.00
In accordance with the most recent amendment to the Agency's Procurement
Policies and Procedures, a purchase order in the amount of $15,874 will
be executed after the Community Development Commission receives and files
this report.
Based
��upon
/n� the foregoing, staff recommends adoption of the form motion.
KENNETH J. HE*ERSON, Executive Director
Development Department
-------------------------------------------------------------------------------
KJH:GC:aw:0024Q COMMISSION MEETING AGENDA
Meeting Date: 05/24/1993
Agenda Item No:
Cdy of San Bernardino REQUISITION/ TO GUARANTEE PAYMENT,THIS
ECONOMIC DEVELOPMENTA GENCY NUMBER MUST APPEAR ON ALL
201 North E Street 7hird h7oor PURCHASE ORDER INVOICES,PACKAGES, ETC.
San Be—cf-,CA 9240 1-150 7
(909)384-5061•FAX(909)888-9413 PURCHASE ORDER NO.
7 r
i ONTARIO REFRIGERATION N UNLESS OTHERWISE SPECIFIED:
w 635 SOUTH MOUNTAIN AVE. I City of San Bernardino
o ONTARIO, CA 91762 P ECONOMIC DEVELOPMENT AGENCY
a T 201 North E Street,Third Floor
L_ J L San Bernardino,CA 92401-1507 J
DATE ISSUED DELIVERY DATE I F.O.B.POIW TAXABLE NON-TAX TERNS
DESTINATION NET
QUANTITY
RDERE Y UNIT DESCRIPTION OF SUPPLIES OR SERVICE
ORDERED UNIT PRICE EXTENSION
1 JOB PROVIDE ALL LABOR, SUPPLIES AND MATERIAL TO
DESIGN AND INSTALL A VVT ZONED SYSTEM IN THE
SUITE OF THE AIRPORT AUTHORITY A14D ASSEMBLYMANS
BACA'S OFFICES ON THE SECOND FLOOR OF BUILDING
201 NORTH "E" ST. SAN BERNARDINO.
SEE ATTACHED PROPOSAL $15,874.00 $15,874.00
TOTAL S 15,874.00
PLEASE NOTIFY US IMMEDIATELY IF YOU ARE
UNABLE TO DELIVER BY DATE SPECIFIED. By
BUYER
BUDGET LINE ITEM REQUESTED BY: AUTHORIZED BY:
7332 GARY CLERMONT TIMOTHY STEINHAUS
APPROVED APPROVED
DD#171 �)
Instructions: All applicable items under the column must be chocked for completeness and all required information must be
submitted with each requisition.
EAdvedi�semenl ase Cost 0 to$500.00 $501.0010 $5,001.00 to Over
;5,000.00 $25,000.00 $25,000
Signature Required Manager Administrative Executive Board
Dtroctor
d Informal Informal 3 Informal
3 Formal
nt Placed N/A Optional brat OM Required
Go vernment Purchase?rce City/County
Required Attachments:
Bid Abstract Indicate bids received on this sheet
or attach separate list Attach background report
Advertisement N/A
H ads placed,attach copies Required
Vendor Justification Indicate reason for vendor selection on this sheet or attach separate memo.
BIDS RECEIVED
BIDDER DATE BID B/C• COMMENTS
1. TMCI 5-17-93 $17,374
2, ONTARIO REFRIGERATION 5-12-93 $15,874
3.
Business Classification: Small(S) Local(L) Minority(M) Women Owned(W) Other(0)
SELECTED SUPPLIER
NAME ONTARIO REFRIGERATION
COMMENTS/JUSTIFICATION: (Sole source,lowest price,most qualified,etc.)
LOWEST PRICE
L
TEL: May 12 93 15 :31 No .002 P . 01
Ontario
635 SOuIP Moun188BAvenue
Refrigeration Ontario. Calitornia 91752
DATE:_ ti_ ly _ ei3 NO. OF PAGES: 3 (INC. COVER)
TO: jG-p,;>
'10 1 - S,YR 94113
FROM: _ FELIX J BACA
ONTARIO REFRIGERATION
FAX: (909) 988.2522
NOTES: �Srza ouoT� Tore fs aeA 's gvfr�¢ .�./t�
ALO�PVZr f�/ � 1 � 7tei "7Ti 9aaT
r
— �'� 7AlE �✓iav� �ii'� 7�r T / /3t.Zmws� �Oe2
Corot �7 cry �ls- ME Au 2VA �'rrz��cES 14/s
IF THIS THIS�FAX IS INCOMPLETE OR NOT LEGIBLE, PLEASE CALL (909) 984-2771 THANK YOU
/Hs1zl�S
4;z(jC
®8 E P V I C E MECHANICAL SYSTEM DESIGN,BUILD.LINC Sarvlce-
L,
TEL : May 12 93 1532 N0-.D62 0�
Ontario (909)884-2771
Refrigeration 835 South Mountain Avenue
Ontario. California 91782
May 12, 1993
City of San Bernardino
Economic Development Department
201 N. "E" Street, Third Floor
San Bernardino, CA 92401-1507
Attn: Mr. Gary Clermont
Subject: MODIFICATION OF EXISTING A/C SYSTEM FOR AIRPORT
AUTHORITY AND BACA'S OFFICE UPGRADE TO VVT ZONED
SYSTEM
Dear Gary:
We are pleased to submit the following quotation for the
heating and air conditioning scope of work for the above
referenced project.
Our quotation and scope of work is as follows:
- Design/Build Engineering
Demolition of existing VAV boxes
Demolition of ducting as needed
- Furnish and install 6 new Carrier brand Zone Dampers
with Slave thermostats
New supply air ducting as needed to install zones and new
registers for proper air distribution throughout suites
(flexible ducting)
(34) All new supply air registers
Isosat and modem
Patching of primary supply air duct where existing
ducting is removed
v - Air balance and report for entire suites by Ontario
Refrigeration
S E R V I C E MECHANICAL SYSTEM DESIGN.RUI1 D,UNC Servire'
LI
TEL : May 12 93 15 :32 No .002 P .03
V
City of San Bernardino
Economic Development Department
Mr. Gary Clermont
Page 2
- Permits
- As-built mechanical drawings
- After hours labor
Bid Total $15 ,87q.00
EXCLII SIONS
- overtime
- Carpentry
Please note that allowances have been made to replace all
supply air registers to a more quiet model. In comparison to
our previous bid, these (2) suites account for 46% of the
zones for the floor. Labor accounts for 34% of total labor
required to modify the floor. In conclusion, these suites
represent the lion's share of work for the current lay-out.
Sincer
Felix J. Baca
FJB/dm
LJ
TELEPHONE: P.O. 8OX 30700
809-888-7974 „ SAN BERN RD O 35 24
1-800-772-4070 O, CA 13
CA CONTT R. LI 9 924
Heating & Air Conditioning Contractors
To : ECONOMIC DEVELOPMENT AGENCY May 17 , 1993
201 North "E" Street
Third Floor
San Bernardino, Ca. 92401-1507
Attn: Gary Clermont , Human Resources Manager
Subj : 2nd Floor Tower Space
HVAC-Tenant Improvement
Ref : Carrier VVT Controls and Re-Zoning
Serving "Common Area" and "Airport Authority" Space.
Dear Mr . Clermont ,
Our company is pleased to provide a Quotation to you on
the above mentioned project . We will furnish a design/build
project to install as follows :
(2 ) 7.D-12 VVT Zone Damper
- (2) ZD-14 VVT Zone Damper
- ( 2 ) ZD-16 VVT Zone Damper
' (6) SSPOlE Slave Stats
( 1 ) EXT/RE Bus Extender
(Lot ) Communication bus inter-locked to existing 3rd
floor equipment .
(Lot ) Power wiring and transformer to energize all said
damper actuators and controllers .
(* ) Re-Program existing 2nd floor primary air valves and
bypass dampers for optimum available air flow.
( *) Provide engineering drawings showing new proposed
interior/exterior zone control with dampers , ducting
and registers .
- (*) Provide new registers , grills and flex duct for the
above mentioned plans and installation.
Quote price for the above is $ 9 , 985. 00
Page 1 of 2
fJ
Page 2
Economic Development Agency, (cont ' d)
Exclusions : Prevailing wages and bond fees .
Clarification: All Carrier/Parker controls listed in
above quotation have been quoted and
offered by Carrier Separately per
attached.
Total for this is $ 7 ,389.00
Total Value of entire said project installed and supervised
is :
Total . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 17 ,374 . 00
Very Truly Yours ,
r"1
Jim Carter
V.P./Manager of Installation
Page 2 of 2
L�
g
< � s
11 •0 Hp i.. �: � N Z
?\�\ M �j °• A N � � W 0
w Cl ❑ C:
i (9 0 r < N ■ ■ ■ Q� �� �
r• 0' m R$ p
0 0 0 in p'n
n a r 0 5 � m (D A I R p
c w y M (D r 4 t7
fA
r 7 n 0 k7
a °
ro H o
fl
A H w m ❑ ® CCFFF��]777
to
b
o ro �•
i � z en* o• � p
wOw��
n o ~ 3 N
C N O 9
Z H -
^ N W q C
IF
zQ " � �pgSt ' n I' alt Q� ryr
to
iv
3rd
rr
iiT '�I