Loading...
HomeMy WebLinkAbout04- Development Department D E V E L O P M E N T D E P A R T M E N T OF THE CITY OF SAN BERNARDINO REQUEST FOR COMMISSION/COUNCIL ACTION From: KENNETH J. HENDERSON Subject: 201 NORTH "E" STREET BUILDING Executive Director HEATING & AIR CONDITIONING CONTROLS Date: May 18, 1993 ------------------------------------------------------------------------------- Svnopsis of Previous Co®ission/Council/Committee Action(s): None. ------------------------------------------------------------------------------- Recommended Motion(s): (Community Development Commission) MOTION: That the Community Development Commission receive and file the attached staff report informing the Commission of the O processing of a purchase order with Ontario Refrigeration Company in the amount of $15,874 to design and install heating and air conditioning controls in two second floor suites of building 201. 0"jAij Administrator KENNETH J. HEN#ERSON Executive Director ------------------------------------------------------------------------------ Contact Person(s): Ken Henderson/Gary Clermont Phone: 5081 Project Area(s): Central City Ward(s): N/A Supporting Data Attached: Staff Report FUNDING REQUIREMENTS: Amount: $15.874.00 Source: Central City Project Bond Proceeds Budget Authority: 7302 (Approved when FY93/94 budget adopted) ------------------------------------------------------------------------------- COmmission/CO cil Notes: KJH:GC:aw:0024Q COMMISSION MEETING AGENDA Meeting Date: 05/24/1993 Agenda Item No: �� ECONOMIC DEVELOPMENT AGENCY STAFF REPORT 201 North "E" Street Building - Heating and Air Conditioning Controls The second floor of the 201 North "E" Street building currently has two (2) suites occupied by tenants with long term leases. The suites are occupied by Assemblyman Baca and the San Bernardino International Airport Authority. When they were improved, the existing heating and air conditioning controls, ducts and thermostats were left in place. The existing heating and air condition system was initially designed for open space offices, and the it is not suitable for the modified suite improvements that have offices enclosed. Unfortunately, the system is not balanced, is enclosed, needs to be ducted differently and redesigned. Because we do not have long-term tenants identified for other areas of the 2nd floor at the present time, we do not think it is practical to convert the entire 2nd floor until modifications are made in conjunction with future leases. Proposals were solicited to redesign the system and provide necessary installation and responses were received from two companies as follows: 1. Thiem Mechanical Co. Inc, at $17,374.00 2. Ontario Refrigeration at $15,874.00 In accordance with the most recent amendment to the Agency's Procurement Policies and Procedures, a purchase order in the amount of $15,874 will be executed after the Community Development Commission receives and files this report. Based ��upon /n� the foregoing, staff recommends adoption of the form motion. KENNETH J. HE*ERSON, Executive Director Development Department ------------------------------------------------------------------------------- KJH:GC:aw:0024Q COMMISSION MEETING AGENDA Meeting Date: 05/24/1993 Agenda Item No: Cdy of San Bernardino REQUISITION/ TO GUARANTEE PAYMENT,THIS ECONOMIC DEVELOPMENTA GENCY NUMBER MUST APPEAR ON ALL 201 North E Street 7hird h7oor PURCHASE ORDER INVOICES,PACKAGES, ETC. San Be—cf-,CA 9240 1-150 7 (909)384-5061•FAX(909)888-9413 PURCHASE ORDER NO. 7 r i ONTARIO REFRIGERATION N UNLESS OTHERWISE SPECIFIED: w 635 SOUTH MOUNTAIN AVE. I City of San Bernardino o ONTARIO, CA 91762 P ECONOMIC DEVELOPMENT AGENCY a T 201 North E Street,Third Floor L_ J L San Bernardino,CA 92401-1507 J DATE ISSUED DELIVERY DATE I F.O.B.POIW TAXABLE NON-TAX TERNS DESTINATION NET QUANTITY RDERE Y UNIT DESCRIPTION OF SUPPLIES OR SERVICE ORDERED UNIT PRICE EXTENSION 1 JOB PROVIDE ALL LABOR, SUPPLIES AND MATERIAL TO DESIGN AND INSTALL A VVT ZONED SYSTEM IN THE SUITE OF THE AIRPORT AUTHORITY A14D ASSEMBLYMANS BACA'S OFFICES ON THE SECOND FLOOR OF BUILDING 201 NORTH "E" ST. SAN BERNARDINO. SEE ATTACHED PROPOSAL $15,874.00 $15,874.00 TOTAL S 15,874.00 PLEASE NOTIFY US IMMEDIATELY IF YOU ARE UNABLE TO DELIVER BY DATE SPECIFIED. By BUYER BUDGET LINE ITEM REQUESTED BY: AUTHORIZED BY: 7332 GARY CLERMONT TIMOTHY STEINHAUS APPROVED APPROVED DD#171 �) Instructions: All applicable items under the column must be chocked for completeness and all required information must be submitted with each requisition. EAdvedi�semenl ase Cost 0 to$500.00 $501.0010 $5,001.00 to Over ;5,000.00 $25,000.00 $25,000 Signature Required Manager Administrative Executive Board Dtroctor d Informal Informal 3 Informal 3 Formal nt Placed N/A Optional brat OM Required Go vernment Purchase?rce City/County Required Attachments: Bid Abstract Indicate bids received on this sheet or attach separate list Attach background report Advertisement N/A H ads placed,attach copies Required Vendor Justification Indicate reason for vendor selection on this sheet or attach separate memo. BIDS RECEIVED BIDDER DATE BID B/C• COMMENTS 1. TMCI 5-17-93 $17,374 2, ONTARIO REFRIGERATION 5-12-93 $15,874 3. Business Classification: Small(S) Local(L) Minority(M) Women Owned(W) Other(0) SELECTED SUPPLIER NAME ONTARIO REFRIGERATION COMMENTS/JUSTIFICATION: (Sole source,lowest price,most qualified,etc.) LOWEST PRICE L TEL: May 12 93 15 :31 No .002 P . 01 Ontario 635 SOuIP Moun188BAvenue Refrigeration Ontario. Calitornia 91752 DATE:_ ti_ ly _ ei3 NO. OF PAGES: 3 (INC. COVER) TO: jG-p,;> '10 1 - S,YR 94113 FROM: _ FELIX J BACA ONTARIO REFRIGERATION FAX: (909) 988.2522 NOTES: �Srza ouoT� Tore fs aeA 's gvfr�¢ .�./t� ALO�PVZr f�/ � 1 � 7tei "7Ti 9aaT r — �'� 7AlE �✓iav� �ii'� 7�r T / /3t.Zmws� �Oe2 Corot �7 cry �ls- ME Au 2VA �'rrz��cES 14/s IF THIS THIS�FAX IS INCOMPLETE OR NOT LEGIBLE, PLEASE CALL (909) 984-2771 THANK YOU /Hs1zl�S 4;z(jC ®8 E P V I C E MECHANICAL SYSTEM DESIGN,BUILD.LINC Sarvlce- L, TEL : May 12 93 1532 N0-.D62 0� Ontario (909)884-2771 Refrigeration 835 South Mountain Avenue Ontario. California 91782 May 12, 1993 City of San Bernardino Economic Development Department 201 N. "E" Street, Third Floor San Bernardino, CA 92401-1507 Attn: Mr. Gary Clermont Subject: MODIFICATION OF EXISTING A/C SYSTEM FOR AIRPORT AUTHORITY AND BACA'S OFFICE UPGRADE TO VVT ZONED SYSTEM Dear Gary: We are pleased to submit the following quotation for the heating and air conditioning scope of work for the above referenced project. Our quotation and scope of work is as follows: - Design/Build Engineering Demolition of existing VAV boxes Demolition of ducting as needed - Furnish and install 6 new Carrier brand Zone Dampers with Slave thermostats New supply air ducting as needed to install zones and new registers for proper air distribution throughout suites (flexible ducting) (34) All new supply air registers Isosat and modem Patching of primary supply air duct where existing ducting is removed v - Air balance and report for entire suites by Ontario Refrigeration S E R V I C E MECHANICAL SYSTEM DESIGN.RUI1 D,UNC Servire' LI TEL : May 12 93 15 :32 No .002 P .03 V City of San Bernardino Economic Development Department Mr. Gary Clermont Page 2 - Permits - As-built mechanical drawings - After hours labor Bid Total $15 ,87q.00 EXCLII SIONS - overtime - Carpentry Please note that allowances have been made to replace all supply air registers to a more quiet model. In comparison to our previous bid, these (2) suites account for 46% of the zones for the floor. Labor accounts for 34% of total labor required to modify the floor. In conclusion, these suites represent the lion's share of work for the current lay-out. Sincer Felix J. Baca FJB/dm LJ TELEPHONE: P.O. 8OX 30700 809-888-7974 „ SAN BERN RD O 35 24 1-800-772-4070 O, CA 13 CA CONTT R. LI 9 924 Heating & Air Conditioning Contractors To : ECONOMIC DEVELOPMENT AGENCY May 17 , 1993 201 North "E" Street Third Floor San Bernardino, Ca. 92401-1507 Attn: Gary Clermont , Human Resources Manager Subj : 2nd Floor Tower Space HVAC-Tenant Improvement Ref : Carrier VVT Controls and Re-Zoning Serving "Common Area" and "Airport Authority" Space. Dear Mr . Clermont , Our company is pleased to provide a Quotation to you on the above mentioned project . We will furnish a design/build project to install as follows : (2 ) 7.D-12 VVT Zone Damper - (2) ZD-14 VVT Zone Damper - ( 2 ) ZD-16 VVT Zone Damper ' (6) SSPOlE Slave Stats ( 1 ) EXT/RE Bus Extender (Lot ) Communication bus inter-locked to existing 3rd floor equipment . (Lot ) Power wiring and transformer to energize all said damper actuators and controllers . (* ) Re-Program existing 2nd floor primary air valves and bypass dampers for optimum available air flow. ( *) Provide engineering drawings showing new proposed interior/exterior zone control with dampers , ducting and registers . - (*) Provide new registers , grills and flex duct for the above mentioned plans and installation. Quote price for the above is $ 9 , 985. 00 Page 1 of 2 fJ Page 2 Economic Development Agency, (cont ' d) Exclusions : Prevailing wages and bond fees . Clarification: All Carrier/Parker controls listed in above quotation have been quoted and offered by Carrier Separately per attached. Total for this is $ 7 ,389.00 Total Value of entire said project installed and supervised is : Total . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 17 ,374 . 00 Very Truly Yours , r"1 Jim Carter V.P./Manager of Installation Page 2 of 2 L� g < � s 11 •0 Hp i.. �: � N Z ?\�\ M �j °• A N � � W 0 w Cl ❑ C: i (9 0 r < N ■ ■ ■ Q� �� � r• 0' m R$ p 0 0 0 in p'n n a r 0 5 � m (D A I R p c w y M (D r 4 t7 fA r 7 n 0 k7 a ° ro H o fl A H w m ❑ ® CCFFF��]777 to b o ro �• i � z en* o• � p wOw�� n o ~ 3 N C N O 9 Z H - ^ N W q C IF zQ " � �pgSt ' n I' alt Q� ryr to iv 3rd rr iiT '�I