HomeMy WebLinkAbout04- Public Works DEVELOPMENT DEPARTMENT OF THE CITY OF SAN BERNARDINO REQUEST FOR COMMISSION/COUNCIL ACTION From: Roger G. Hardgrave, Dir. Subject: Approval of Contract of Public Works/City Engr. Change Order No. 1 - Improvement of Hunts Lane Grade Crossing Date: April 8, 1993 No. B-541.0, per Plan No. 8297 -- SULLY- MILLER CONTRACTING COMPANY ---------------------------------------------------------------- Synopsis of Previous Commission/Council/Committee Action: 06-14-88 - Resolution No. 4613 adopted, approving Owner Partici- pation Agreement, including $317,500 for improving Hunts Lane crossing. 08-06-84 - Resolution No. 4654 adopted authorizing execution of an Agreement with Colton relating to improvement of -----------Hunts-Lane Grade Crossing. (Cont. on second page) ----------------------------------------------- Recommended Motion: That Contract Change Order No. 1 to the contract with Sully- Mlller Contracting Company, for the improvement of Hunts Lane Grade Crossing No. B-541 . 0, per Plan No. 8297, be approved, for the construction of additional improvements necessary to match the raised grade of the reconstructed rails at that location, at an increase to the contract "of $39, 335 rom $51, 216.00 to $90, 551 . 61. Ro . of P.W. /C.E. cc: K. Henderson Timothy Steinhaus, Agency Administrator ---------------------------------------------------------------- Contact Person: Roger G. Hardgrave Phone: 5025 South Valle Project Area: _. Redevelopment Project Ward(s) : 3 Staff Report, Supporting Data Attached: CCO #1 Acct. No. FUNDING REQUIREMENTS: Amount: $ 39 , 335. 61 Source: 650-0097 Budget Authority: ------------------------------------------------------- Commission/Council Notes: Agenda Item No. : Hunts Lane Grade Crossing Synopsis of Previous Commission/Council/Committee Action (Cont. ) 03-07-88 - Resolution 87-71 adopted authorizing execution of - Agreement with Southern Pacific Transportation Co. relating to installation of pre-exemption circuit at the Hunts Lane crossing. I1-21-88 - Resolution No. 88-441 adopted authorizing execution of Program Supplement No. 50, to obligate Section 203 Federal-Aid Funds. 03-20-89 - Resolution 89-83 adopted granting authorization to execute and accept Indenture to Install Storm DRain System at Grade Crossing No. B-541.0. 03-05-90 - Resolution No. 90-68 adopted authorizing the execution of an Agreement with the Southern Pacific Transportation Company. 01-21-92 - Plans approved and Director of Public Works/City Engineering authorized to advertise for bids. 08-03-92 - Bid rejected and authorization granted to re- advertise. 12-07-92 - Resolution No. 5346 adopted awarding a contract for low bid price of $51 ,216.00 . �• DEPARTMENT OF PUBLIC WORKS STAFF REPORT Approval of Contract Change Order No. 1 improvement of Hunts Lane Grade Crossing No. B-541.0 In the reconstruction of the Hunts Lane Railroad crossing, Southern Pacific Railroad was responsible for the installation of the rubber crossing material, flashing lights and automatic gates. Ordinarily, when the railroad installs the rubber padding, they also remove the existing track and install new track as well. When the three tracks were reinstalled, they were reconstructed at a substantially higher elevation than is indicated on the plans, with the track on the southern end of the crossing being approximately 14 inches above the elevation indicated on the plans, and the track on the northern end of the crossing being approximately 3 inches higher than the elevation indicated on the plans. The plans called for a minor amount of work to be performed by the City, which was to match the existing elevations on both sides of the railroad crossing. This included the construction of several catch basins and a minor amount of street work. However, the change in the elevation of the railroad crossing itself has impacted the match line on each side of the crossing. In order to provide a safe and smooth transition on each side of `rr the railroad crossing, it was necessary to expand the scope of work to be performed by the Contractor. Contract quantities on road work increased substantially, and the contract unit costs had to be renegotiated downward to reflect the additional work. This work was performed at the renegotiated total contract price of $90,551 .61. This extra work will provide for a safe railroad crossing, and enable the vehicles to traverse the crossing at normal speeds. There is a total of $9,784.00 in contingencies available to finance the costs of the extra work. However, Caltrans has agreed to participate to the extent of 908. Section 203 Federal-Aid Grade Crossing Funds have been provided to finance 908 of the cost for improving the crossing. Caltrans has indicated that this extra work will be eligible for financing with these Federal-Aid Funds. The City of Colton is responsible for 1/2 of the total project costs, since the west half of the grade crossing is within their jurisdiction. A request has been submitted to the Southern Pacific Railway Company to reimburse the City for those extra costs, since their actions necessitated the additional costs. We recommend that Contract Change Order No. 1 be approved. 4-8-93 7 0 CONTRACT CHANGE ORDER NO. 1 REV NO. SUPPL. NO. � aD Construction of Hunts Lane RR Crossing SHEET 1 OF 1 . . i NO. RRP-R036(5) CONTRACT NO. 8297 .'O: SULLY-MILLER CONSTRUCTION COMPANY You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the State Highway Engineer Description of work to be done, estimate of quantities, and prices to be paid. Segregate between additional work at contract price, agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only such time as eouioment is actually used and no allowance will be made for idle time The last percentage shown is not accumulated increase of decrease from the original quantity in the Engineers Estimate. EXTRA WORK AT FORCE ACCOUNT: Due to the expanded scope of work, contract unit prices are to be adjusted as follows: BID ORIGINAL ORIGINAL ORIGINAL ADJUSTED ADJUSTED ADJUSTED ITEM QUANTITY UNIT ITEM PRICE QUANTITY UNIT PRICE COST REMOVE OR ABANDON EXISTING DRAINAGE FACILITY 1) 1 L. S. $1, 300. 00 $1,.300. 00 -------------------- $1, 300.00 REMOVE ASPHALT CONCRETE 1 L.S. $1, 500. 00 $1, 500. 00 1 L. S. $6, 500. 00 $6, 500. 00 LEARING AND GRUBBING J) 1 L.S. $4, 000. 00 $4 , 000. 00 1 L.S. $8, 035. 00 $8, 035.00 ROADWAY EXCAVATION 4) 1 L.S. $2, 000. 00 $2, 000. 00 1 L.S. $7, 500. 00 $7, 500.00 HEADER BOARDS 5) 111 L. F. $ 3 . 89 $ 431.79 ---------------------- $ 431.79 CLASS 2 AGGREGATE BASE 6) 94 C.Y. $ 49.50 $4, 653 .00 218 C.Y. $ 39.49 $8, 608.82 ASPHALT CONCRETE 7) 66 TONS $ 52. 50 $3, 465. 00 240 TONS $ 43. 50 $10,440. 00 MISC ASPHALT 8) 6 TONS $ 160. 00 $ 960. 00 147 TONS $ 53. 00 $ 7,791.00 18" RCP 9) 91 L.F. $ 120.00 $10,920. 00 ---------------------- $10,920. 00 CATCH BASINS 10) 2 EACH $4,850. 00 $ 9, 700. 00 ----------------------- $ 9, 700.00 -'BRED END SECTION 1 EACH $1, 150. 00 $ 1, 150. 00 ----------------------- $ 1, 150.00 ENERGY DISSIPATOR 12) 1 L.S. $2, 325.00 $ 2, 325.00 ----------------------- $ 2, 325. 00 © CLASS "B" CONCRETE f.,% 9. 6 C.Y. $ 390. 00 $ 3,744 . 00 29 C.Y. $ 355.00 $10, 295. 00 `RIPPING & PAVEMENT MARKINGS 14) 1 L.S. $4 , 025.00 $ 4 , 025. 00 ----------------------- $ 4, 025.00 DITCH LINING 15) 1 L.S. $1, 030. 00 $ 1, 030. 00 ----------------------- $ 1, 030.00 ADDITIONAL MOVE-ON ------------------- $ 500. 00 ORIGINAL ADJUSTED CONTRACT PRICE CONTRACT PRICE TOTAL COST $51, 216.00 $90, 551. 61 ESTIMATED COST DECREASE $ INCREASE $39,335.61 By reason of this order the time of completion will be adjusted as follows: -20- working days Submitted by: Resident Engineer, Date: r roval Recommended: Date: Approved: City Engineer Date: We the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all material, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full Payment therefor the prices shown above Accepted Date: Contractor: By: Title: If the contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the work and filing a written protest within the time therein specified.