Loading...
HomeMy WebLinkAbout11- Development Services CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION From: MICHAEL E. HAYS,Director Subject: Award Contract for Rialto Avenue at Twin creek, Widen Bridge and Street Improvements per Plan F Development Services No. 9726—Sean Malek Engineering& Construction Inc. D� 01-25-99 ` File No: 1.7064 Synopsis of Previous Council Action: MCC DATE: 02-15-99 June 1996 Allocation of $300,000 approved in 1996/97 %:-Cent Sales Tax Fund Budget. 10-21-96 Transfer of$172,000 approved from Account No. 129-367-55047064 to Improvement of Arden Avenue Soccer Complex and Transfer of$75,000 from 129-367-5504-7064 to Improvement of Grade Crossing at Cajon and University. 02-17-97 Resolution No. 97-53 adopted authorizing execution of agreement for Professional Design Services with LNC. June 1997 Supplemental allocation of$247,500 approved in 1997/98 Y:-Cent Sales Tax budget. 10-19-98 Increase allocation to project by$150,000 from unappropriated reserves in 1/2-Cent Sales Tax Fund. 10-19-99 Authorization to Advertise for Bids per Plan No. 9726. Recommended Motion: 1. Approve transfer of$76,500 from 129-367-5504-7060 State Street - Foothill to 161 in the 129 'h-Cent Sales Tax fund to Account No. 129-367-5504-7064, Widening of Rialto Avenue at Twin Creek Channel. kdopt Resolution. Michael E.Hays Contact Person: g Kl tt Phone: St95 Supporting data attached: Staff report,Report of Bids,Resolution Ward: 1 FUNDING REQUIREMENTS: Amount: $526,500 Source(Acct. No.) 129-367-5504-7064 (Acct. Description) Rialto Bridgg at Twin Celet - Wid it an lAnprove Finance: cil Notes: A genda Item No. _ Z CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT Silhiect: I- ,d Contract for Rialto Avenue at Twin Creek, Widen Bridge and Street Improvements per Plan No. 9726. Background: This project was originally proposed in the 1996/97 budget and consists of widening the existing bridge over Twin Creek Channel east of Waterman Avenue in the central portion of the community. The existing bridge provides for only one lane in each direction and the proposed widening will provide for two lanes in each direction. It incorporates the requirements for the seismic retrofit of bridges and matches the four lane configuration that exists to the east and west sides of the bridge. Traffic projections and growth in the area indicate the widening is required as traffic continues to increase in the area. It serves the County facilities (Sheriff, Corporation Yards and Transportation/Flood Control), as well as the proposed developments at Norton. All but three lots on the southwest side of the bridge have completed the street improvements. It is proposed that additional funding be included in this project for street improvements to complete Rialto Avenue from Lena Road on the east to Pepper Avenue on the west, with full street improvements. Bids were received and opened at 2:00 PM on Tuesday January 12, 1999. A total of 10 bids were received ranging from a low of $399,969.50 to a high of $602,763.80. The low bid is 9% above the Engineer's Estimate of$361,584.20. 1 below is the estimated construction cost for the project using the low bid price for the contract. Construction Contract $399,969.50 Professional Engineering Contract $ 56,429.60 Inspection and Contract Administration $ 10,000.00 Additional Street Work $ 35.000.00 Subtotal $501,399.10 Contingencies (5%) $ 25.100.90 TOTAL $526,500.00 This project was originally prepared and estimates completed in May 1998, however, it has been delayed for a variety of reasons. The remaining street improvements to complete the roadway were designed but not included in the project, as these improvements would be done upon development of the adjacent property. However, the properties show no signs of additional improvements and will likely remain single family rp6dences for quite some time. In order to complete the street, it is recommended it be completed with the e to eliminate traffic restrictions. F JalImuact: To fully fund this project, the first motion is required to transfer $76,500 from the State Street - Foothill to 16' Street project in the 129 Fund. There is an original amount of $450,000.00 already allocated. It should be noted that this project was first estimated in 1996 and revised in 1997 and represents an extension of the existing bridge rather than a full replacement. With a transfer, there will be an available total amount of $526,500 to fund the project. Recommendation: Staff recommends adoption of the resolution awarding the contract to the low bidder. a � Z CA W � m _ n Q Z o z m n Z m p H O p a J O it p z G OU z m w z ¢ Q p Q O > a m . Q LL m a 0 ^ O AJ O Z 2 I � W 0 J O r P d W C G Y 2 .1 n \J m m W J — W m O Z CL D a W G ~ m m v' EJ tD I W ¢ OUO2O = p V I I j z oaQII -� a Z GC�� z o H c� a z ICI ,� T C� .i j'� o OZG z0 O + L W ¢ 3 CL 1- Z Q W a O i 1� " I I � CW V F N W 7 z = p W O O O Co p¢cr M m w O . N d z m¢N m o O ZQ o Zaa LUZ � mWa —� a ? U Q Q H z� U w � H r W Q ZN L d 7AV ]ONV03dd11 CL 3 Q NIML LSV3 O s� Z 3AV NVW831VM U Q CO ti � W 2 Q U) m 911,-1 a 1 RESOLUTION NO. 2 3 RESOLUTION OF THE CITY OF SAN BERNARDINO AWARDING A CONTRACT TO, SEAN MALEK ENGINEERING & CONSTRUCTION, INC., FOR 4 THE WIDENING OF RIALTO BRIDGE AT TWIN CREEK PER PLAN NO. 9726. 5 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY 6 OF SAN BERNARDINO AS FOLLOWS: 7 SECTION 1. SEAN MALEK ENGINEERING AND CONSTRUCTION, INC is the lowest 8 responsible bidder for: WIDENING OF RIALTO BRIDGE AT TWIN CREEK PER PLAN 9 NO. 9726. A contract is awarded accordingly to said bidder in a total amount of$399,969.50 10 but such award shall be effective only upon being fully executed by both parties. All other 11 12 bids, therefore, are hereby rejected. The Mayor is hereby authorized and directed to execute 13 said contract on behalf of the City; a copy of the contract is on file in the office of the City 14 Clerk and incorporated herein by reference as fully as though set forth at length. 15 SECTION 2. This contract and any amendment or modifications thereto shall not take 16 effect or become operative until fully signed and executed by the parties and no party shall be 17 18 obligated hereunder until the time of such full execution. No oral agreements, amendments, 19 modifications or waivers are intended or authorized and shall not be implied from any act or 20 course of conduct of any party. 21 SECTION 3. This resolution is rescinded if the parties to the contract fail to execute it 22 23 within sixty (60) days of the passage of the resolution. 24 25 26 27 28 1 RESOLUTION...AWARDING CONTRACT TO SEAN MALEK ENGINEERING AND 2 CONSTRUCTION, INC. FOR WIDENING OF RIALTO AVENUE BRIDGE AT TWIN CREEK CHANNEL. 3 4 I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and Common Council of the City of San Bernardino at a meeting thereof, held on the 5 day of , 1999 by the following vote, to-wit: 6 Council Members: AYES NAYS ABSTAIN ABSENT 7 ESTRADA — 8 9 LIEN — 10 MCGINNIS — 11 SCHNETZ — 12 ANDERSON — 13 DEVLIN — 14 15 MILLER — 16 17 Rachel Clark, City Clerk 18 19 The foregoing resolution is hereby approved this—day of_, 1999 20 21 Judith Valles, Mayor 22 City of San Bernardino 23 24 Approved as to form And Legal Content: 25 James F. Penman 26 City Attorney 27 28 By