HomeMy WebLinkAbout11- Economic Development DEVELOPMENT DEPARTMENT
OF THE CITY OF SAN BERNARDINO
ECONOMIC DEVELOPMENT AGENCY
REQUEST FOR COMMISSION/COUNCH,ACTION
FROM: KENNETH J.HENDERSON SUBJECT: SCHEMATIC DESIGN:STATE
Executive Director CONSOLIDATED OFFICES AND
CALTRANS BUILDING
DATE: April 27, 1994
-------------------------------------------------------------------------------------------------------------------------------------------
Svnopsis of Previous Commission/CounciFCommittee Acdoub):
On January 19, 1994 the Redevelopment Committee reviewed site massing concepts.
On April 5, 1994 the Redevelopment Committee reviewed schematic core and shell design concepts.
-------------------------------------------------------------------------------------------------------------------------------------------
Recummended Motion(s):
(Communky Development Commission)
MOTION: That the Community Development Commission approve schematic design of the
State Consolidated Offices and CALTRANS Building on the western two-thirds of
the block bounded by 4th, Fifth, "E" and 'D" Streets and instruct staff to proceed
with construction design and development.
*&,
Adnumstrator KENNE J.HEr4DERSON
Executive Director
Contact Person(s): Kenneth J.Henderson/David J Norman Phone: 5081
Project Area(s): Central City North(CCN) Ward(s): One(1)
Supporting Data Attached: Staff ftort:
FUNDING REQUIREMENTS: Amount: $ N/A Source: N/A
Budget Authority: N/A
Commission/Council Notes:
—_—--------_—_—____—.—_—__—__.-----------------------------------------------
DN:cltmsl.cdc(lm) COMMISSION MEETING AGENDA
MEETING DATE: 05/02/1994
Agenda Item Number: /[_
DEVELOPMENT DEPARTMENT
STAFF REPORT
------------------------------------------------------------------------------------------------------------------
Schematic Design: State Consolidated Offices
And Caltrans Building
At this luncheon workshop staff seeks Commission approval of schematic design for the
construction of the State Consolidated Offices and Caltrans Building. Staff also seeks
Commission authorization to begin design development and construction drawings for bidding
purposes late this summer.
OVERVIEW
At its January 19, 1994 meeting, the Redevelopment Committee reviewed massing concepts for
the State Consolidated Offices and Caltrans Building(Government Center.) Massing refers to the
placement of basic building volumes on the site, where those buildings would best fit on the site,
and how those volumes relate to other site elements and surrounding buildings. The Government
Center presents three distinct and large building volumes to the site and to downtown.
The design team presented massing concepts and studies for review of the Redevelopment
Committee. The concepts were a synthesis of data from the programming assessment and site
constraints reviewed by the design team. The design team's preferred site massing concept(see
attachment A)was favorably reviewed and accepted by the Committee.
On April 7, 1994 the Redevelopment Committee reviewed core and shell design concepts for the
buildings.
"Core" refers to a building's central and internal systems or the "core" of the building.
Typically primary plumbing, mechanical, and electrical systems are centrally located in
the building, on each floor. Consequently, due to the repeated placement of these
systems at all levels, you can usually find bathrooms and utility rooms in the same
location on each floor of the building.
"Shell" refers to the building's exterior structure or frame. At this stage of the design
work, the shape, configuration, and appearance of the building's exterior can be easily
determined. In shell design, the architect attempts to create a framing system from
which other materials can be installed, i.e., glass, stone, metal, etc.
The Committee expressed favorable opinions concerning shell and core design, paving the way for
the development of full schematic drawings for presentation to the Community Development
Commission.
— — -- _--- — — — — — ---------------------------------------------------
D offs sl.cdcohn) COMMISSION MEETING AGENDA
MEETING DATE: 05/0211994
Agenda Item Number:
DEVELOPMENT DEPARfM[ENT STAFF REPORT
Schematic Design: State Consolidated Offices and Caltrans Building
April 27, 1994
Page Number 2
SCHEMATIC DESIGN
Schematic design is the final step in the preliminary design phase. Schematic design refers to final
illustrations and sketches which present the "look" of the buildings. It is at this point that the
architect needs client approval before construction drawings can begin.
RECOMMENDATION
Staff recommends that the Commission review and approve schematic design and instruct staff to
begin construction design development for the general contract bid of the State Consolidated
Office and Caltrans Building in late summer of this year.
Staff recommends adoption of the form motion.
�%ik,;M
KENNETH J. JENDERSON, Executive Director
Development Department
_-- ---- -----------------------------------------------------
DN:cltmsl.cdc(Im) COMMISSION MEETING AGENDA
MEETING DATE: 05/0211994
Agenda Item Number: ��
z
---------- — oE.gE— ---------------i i
W� `11 ` 11 " I ,'III � •� o
II'Yil�� il �
-- -- !
" e 1 :I
f F[_
Z O y{
•� e v c e - ', ��
111JI 1111..j N -
<T i
u
j
I am I
I � I
E SigiEi
ATTACHMENT "A" //
ATTENDANCE SHEET
DATE: SAllY TIME: y7
MEETING: COMMVN%TY De✓e,10n1"e.J7— G41MJIl/0Al WO�..�S/✓OO
LOCATION:
Note: Pursuant to Government Code Section 54953 . 3 the signing,
registering or completion of this document is voluntary, and all
individuals may attend the meeting regardless of whether they
sign, register or complete this document.
ATTENDING, NAME DEPARTMENT
�pv� xL r p
.�\v.-.LC-
IYsN
G L ti G
JIE✓fi�J L,p�//
R /-C�Yn21 �Se.
A/;�
cwt y p S r yn-e nf- c&u tF
{ i2Y/f�6 S�ir?� lf�klaJE 5PITi fYs50c .
Ai Be��l� ��-Bs